INTEGRATED BIOMASS GASIFICATION COMBINED CYCLE POWER PLANT FOR DISTRIBUTED GENERATION: A CASE STUDY
005
Suman Dey, Suman Dey
Asst. General Manager (Renewables), Tata Consulting Engineers Limited, India

ABSTRACT

In the present paper a discussion is presented on the technical analysis of a 6.217 MWe integrated biomass gasification combined cycle (IBGCC) power plant. It features three number of downdraft biomass gasifier systems with suitable gas conditioning trains, three number of internal combustion gas engines for producing 5.667 MW electrical power in open cycle and 550 kW power in a bottoming cycle using waste heat recovery. Comparing with gas engine single cycle systems, this technology route increases overall system efficiency of the power plant, which in turn improves plant economics. Estimated generation cost of electricity indicates that mega-watt scale IBGCC power plants can contribute to good scale economy in India. This paper also highlight’s the possibility of activated carbon generation from the char, a byproduct of gasification process, and use of engine’s jacket water heat to generate chilled water through 470 TR vapor absorption machine (VAM) for gas conditioning and to run a cold storage facility.

Keywords: Biomass gasification; combined cycle; producer gas; waste heat; activated carbon

Improving Grid Integration of Renewable Energies: A Success Story Based on Combinational PV Power Forecasts
006
Christian Kurz
meteocontrol GmbH - Energy and Weather Services, Germany

Objective & Background

Grid-integration of fluctuating solar power requires forecast information on the expected power production as a basis for management and operation strategies. With increasing importance of photovoltaic (PV) power for the world-wide energy production, PV power prediction services are already an essential part of grid control and energy trading.

In this presentation we present an integrated combinational PV power forecast based on machine learning algorithms. The aim is to cover a wide range of forecast horizons from short term (i.e. several hours) to several days ahead. Also, the system shall be applicable both for single PV systems and grid controlling zones. The combinational forecasting system shall be used to optimize the grid and market integration of Renewable Energies.

Method

The basis for the combinational forecast are three independent information:

  • PV power production measurements from monitoring systems,
  • satellite cloud motion observations, and
  • Numerical Weather Prediction (NWP) models.

NWP models are widely used for day-ahead forecasting. However, due to the high amount of computing time there are only few updates per day. So NWP shows limited accuracy for the next hours.

Short term (or intra-day) forecasts in this study are based on cloud observations from satellite. By comparing consecutive satellite images, and by means of pattern recognition, the speed and direction of cloud motion is derived. By integrating thermal (infrared) satellite observations, forecasts are also available in the morning hours where no information is available from images taken in the visual spectral range.

(Online) measurements of PV power production from monitoring systems are important information for the combinational forecast. They are used for the short-term adaption and lead to a significant reduction of the systematical error.

Finally, machine learning algorithms are applied to combine all three information depending on the weather situation and the forecast horizon.

Principal Findings

Evaluations will be performed both for large portfolios (here: electricity grid controlling zone in Germany) and for single sites (here: reference PV systems in India). The evaluation covers different forecast horizons from few hours to day ahead. All results will be compared to real PV power production measurements.

One interesting result will be the forecasting accuracy for single sites as already now large PV plants are obligated to provide forecasts in many markets for grid security reasons.

Conclusion and Outlook

By using machine learning algorithms the accuracy of a combinational PV power forecast is expected to be better than each of the contributing forecasts for all forecast horizons. Further investigation is needed to fill the gap of information between the actual production (‘forecast horizon’ 0 minutes) and the satellite forecast (highest accuracy 1 to 2 hours ahead). So as an outlook the use of sky imaging cameras is addressed.

Maximum Penetration Level of Grid Connected Solar PV in Power Systems
007
SREENA SREEKUMAR, SAVIER J.S
college of engineering,trivandrum,kerala, India

Integration of Solar Photovoltaic Generation with the grid leads to several issues in the realms of power quality, protection, power flow, to mention a few. On account of these issues, the rule for maximum penetration level (MPL) is not established unequivocally. Penetration level of 15% has been accepted globally as a thumb rule. The basis for the value 15% has its roots on certain analysis and a thumb rule that the lowest annual load on a selected section of the line is almost 30% of the maximum annual load. It is accepted worldwide that 50% of this lowest annual load or a minimum of 15% as a conservative amount which ensure that the distributed generation capacity does not exceed the load value. However, with grid connected solar power increasingly in usage in several countries, this rule is subjected to further scientific scrutiny. This paper reviews researches carried out on fixing the maximum penetration level using different criteria across the globe and proposes an algorithm for MPL calculation based on salient penetration criteria identified from literature.

The review shows that the major researches in this area can be broadly classified into two strands- first, voltage rise and thermal loading basis in the system, and, second based on multitude of parameters such as protection coordination, load pattern, power factor of the network, and power flow. Increased amount of active power is supplied to the network by Solar Photovoltaic Generators (SPVG) installation which increases steady state voltage of the concerned system. Because of this reason, voltage rise is regarded as one of the major impacts of, and constraints on, the connection of new SPVGs on the network. It would require further analysis to ensure that voltage is maintained appropriately in all conditions.

Rule of thumb regarding the penetration level needs to be confined for multiple sets of parameters in the system with a wide perspective. The highly sensitive criterion is voltage rise for the cumulative employment of SPVGs along the feeder. There are other sensitive issues like current carrying capacity, load pattern, power factor, protection issues, and active-reactive power control across the large scale penetration of SPVG. The critical gap identified in the review is the inadequate attention accorded to the penetration level based on stability issues, such as oscillatory stability and network reconfiguration problems. MPL calculation considering and coordinating various criteria needs to be developed. Calculation of MPL of SPVG is critical for system planning and operation. It is suggested that a fast and reliable communications system can be installed throughout the entire feeder, so that a central controlling mechanism can check the impacts of penetration levels of connected SPVG.Therefore, further research is needed to co-ordinate the effect of these parameters and fixes the maximum penetration level of SPVG in different systems.

Power-to-Gas in a Virtual Power Plant – Possibilities and Challenges
008
Felix Jedamzik, Aleksandra Radwanska, Maximilian Fuhrmann
Next Kraftwerke GmbH, Germany

With the growing number of distributed power producers of renewable energy, the demand for a new way of managing these distributed assets is increasing. A Virtual Power Plant can help controlling and monitoring such assets for providing a stable grid. This abstract provides a VPP case study by outlining the possibilities and complexity of monitoring and controlling a Power-to-Gas (PtG) plant through a Virtual Power Plant (VPP). This Power-to-Gas project is run by Greenpeace Energy together with the German city of Haßfurt.

The power-to-gas plant itself has a capacity of 1.25 MW. The plant operates according to the demand and renewable energy feed-in into the local electricity grid of the municipal utility “Stadtwerk Haßfurt GmbH”. Generally speaking, a PtG plant transforms excess electricity (in this case mostly wind energy) into hydrogen. Within certain constraints, this hydrogen can be fed into the natural gas grid. The challenge with this task is to know, when there is too much renewable energy fed into the grid, so it is more feasible to convert electricity into gas, prevent curtailment and optimize grid use. Next Kraftwerke as a VPP operator forecasts both the feed-in from renewable energies in the region and the total electricity consumption in the distribution grid. Another restriction which the virtual power plant takes into account, is the hydrogen concentration of the local natural gas network, in which the hydrogen produced in the electrolyzer of the power-to-gas plant is fed-in. Based on this data, the control system of Next Kraftwerke’s VPP calculates the times, when the electrolyzer of the PtG will be used and then automatically switches it on via a remote control unit installed on site called Next Box. The result: the power-to-gas system only starts up when renewable energies are available in abundance and thus relieves the regional distribution grid. The excess gas produced will be fed into the local gas network.

Aside from making use of the excess wind energy, also the grid operators can benefit from the fast-paced development of power-to-gas technology: the electrolyzer is also ideally suited for providing grid frequency control for the German grid operators. The plant follows the steering signal from the virtual power plant within milliseconds and is able to provide a flexible capacity of 1.25 MW within 20 seconds. It provides all three German grid frequency control products: R1, R2 and R3. The attached illustration shows a detailed overview of the project and the dedicated roles of the Virtual Power Plant.

PRESPL Pioneering the Indian Bio-Energy Sector with Innovative Refinement-Oriented Biomass Supply Chain Management, for Enhancing Multi-Spectrum Benefits with Sustainable Development & Growth.
009
Rohit Dev1, Sumeet Malhan2
1 Chief Operating Officer, India
2 Chief Technology Operations Officer, India

Punjab Renewable Energy Systems Pvt. Ltd. (PRESPL) was formed in March, 2011 and is a well-established player in the clean energy space and performs various activities relating to development & maintenance of Energy Plantation, biomass aggregation and Supply Chain Management for Independent Power Producers (IPPs) and Process industries. PRESPL enters into long-term fuel supply agreement with clients with pre-decided price and schedule of supply and guarantying quantity and quality of biomass fuel supply. PRESPL acts as single point solution for all fuel needs of the client.

Our Project fulfills the following Sustainable Development Goals i.e.,

Goal 1: No Poverty

Goal 2 : Zero Hunger

Goal 3 : Good Health and Well Being

Goal 4 : Quality Education

Goal 5: Gender Equality

Goal 7 : Affordable & Clean Energy

Goal 8 : Decent Work & Economic growth

Goal 10 : Reduce inequality

Goal 11: Sustainable Cities & Communities

Goal :12 Sustainable Consumption and production

Goal 13: Climate Action,

Goal 15: Life on Land.

PRESPL’s existing operations of biomass collection, processing, storage and transportation both in terms of biomass supply volume as well as expanding geographical spread of the model in other parts of the country. With no commercial utilization, agri residues such as paddy straw, cotton stalk, cane trash, maize cob, soya husk, Juliflora etc. is left to rot or burnt in the fields which results in local pollution and methane emissions leading to various respiratory and chest diseases in local rural population. Our project aim to collect biomass agri-residues, process in order to make them fit for combustion inside boilers/ furnaces, store and supply to industry for clean and renewable power generation which will offset CO2 emissions and prevent local pollution. There is income and employment generation in rural economy on account of sale of agri-residue to farmers and employment of rural youth in biomass logistics.

PRESPL has been awarded as Most Innovative Company in Renewable Sector by Power Today Magazine and the selection has been done by PricewaterhouseCoopers.

The various business activities performed by PRESPL are as following:

Aggregation, processing, storage and supply of biomass (agri- residues) to biomass based power plants and process industries having captive power plants.

Processing loose agri-residues into biomass briquettes in owned/ leased briquetting plants and supplying to process industry such as breweries, beverage plants etc. as per their requirement.

Providing consulting solution to the industry such as preparation of biomass assessment study (BAS) reports, validation of biomass assessment study, preparation of techno-economic viability (TEV) reports for setting up biomass based power plants, project management and EPC services for biomass based power plants etc.

Business Model-

VLEs - Raw Biomass Fuel (Biomass) - Collection, Transportation & Storage - Processing - Processed Biomass - Power Plant & Process Plant.

Experience in Certification According to the Indian Wind Turbine and German Grid Connection Certification Scheme
010
Saptarshi Chatterjee1, Guido Bröring1, Fritz Santjer2, Jens Dirksen2, Sokratis Tentzerakis2, Nivedh BS3
1 UL Contrescarpe 45 28195 Bremen, Germany
2 UL International GmbH DEWI Ebertstraße 96 26382 Wilhelmshaven, Germany
3 UL India Private Ltd. Kalyani Platina – Block I, 3rd floor No. 24, EPIP Zone, Phase II, Whitefield Bangalore – 560066, India

UL's wind certification services support grid integration for decentralized power generating units and power plants according different international Grid Codes like the Central Electricity Authority (CEA) Technical Standards for connectivity to the Grid and the German Grid Codes (VDE-AR). Basis of the certification services is the DIN/ISO 17065 accreditation.

The aim of this paper is to exploit the long experience of UL (DEWI-OCC) in the field of grid connection certification according the German Grid Codes and Certification in Germany in order to propose a relevant Certification Scheme for India considering the latest developments in the Indian Regulations. The proposed scheme will also consider the latest progress within the working committees of the FGW and IECRE, where UL is a member which issues the Technical Guidelines for Certification, Testing and Modelling/Simulation and ensure the high quality of the processes.

The Certification process for Integration of wind turbines and wind farms into the Grid of the German Grid Operator contains 3 Parts.

1. Unit Certification

a. Testing/evaluation of the electrical characteristics like PQ and FRT

b. Evaluation of the Design, Control and Functions of the wind turbine

c. Validation of Simulation Model regarding the FRT test results

d. Issuing unit certificate for a specific wind turbine type

2. System Certificate

a. Evaluation of the Design, Control, Protection, Components and Functions

b. Modelling the wind farm and Simulation of the FRT at the grid connection point

c. Issuing of power generating system certificate before commissioning of the first wind turbine

3. Conformity Declaration

a. Evaluation of the commissioning and as-built documentation, protection test and parameterization

b. Inspection of erected wind turbines in case of type, parameter, protection and function

c. Inspection of Grid Connection Point components in case of protection, communication, parameter and control system

d. Issuing of conformity declaration

Based on the experience on this certification process, UL proposes a procedure to verify compliance to CEA and MNRE requirements. The process include specific suggestions and recommendations e.g. on evaluation and check of test results of different wind turbines which are technically comparable. How to transfer the test results from one wind turbine to another. UL proposed procedure will be based on the transfer rules of the IEC61400series and the FGW Technical Guideline 8. These rules ensure a adequate technical transfer and prevent inappropriate transfer of test results. The evaluation and issuing of conformity Statements acc. the CEA Technical Standard will be discussed in detail and proposals for the improvement and optimization of this procedure will be presented. With our experience we are able to issue approrpiate Conformity statements for several key OEM in the market. UL can offer testing and certification acc. the Technical Standard of CEA and IECRE.

Performance of Solar Organic Rankine Cycle
011
Shailendra Kumar Shukla, Tarun Singh
Centre for Energy and Resources Development, Mechanical Engineering Department, Indian Institute of Technology (B.H.U.) Varanasi-221005, U.P., India, India

In the present scenario of huge demand for energy economy necessitates development of various energy resources either,conventional and non-conventional.Despite rapid depletion of fossil fuels across the world, billions of people are yet devoid of the comfort offered by electricity.If the consumption of fossil fuel continues at the current rate, the future generation is bound to suffer from the acute shortage.The associated global warming and ozone layer depletion caused due to intensive application of fossil fuels forces us to look for solar based systems.One such system is an Organic Rankine Cycle (ORC) plant which is modular and scalable. It can be easily transported, assembled and commissioned rapidly at site, may it be in small industrial units or “micro-grids” for remote and isolated areas. The heat-energy converter of the ORC plant is a hermetically sealed unit with a few moving parts. This technology now turns out to be proven and available to all. The plant requires no operator, the maintenance cost is negligible over long periods, and the unit can be operated and monitored remotely. The design, technologies and materials proposed to be used are largely indigenous and it acquires a significant improvement over the traditional units used earlier for large plants, thus it provides acceptable performance at low capital cost. The solar energy available for almost 295 days a year in India is utilized by an array of sun-tracking parabolic-trough collectors. The functionality and performance of such newly developed low-temperature ORC unit comprising of helical coil solar cavity receiver based parabolic trough concentrator (PTC) was investigated at CERD, Mechanical Engineering, IIT(BHU), Varanasi. The PTC comprised of blackened helical coil made up of two concentric borosilicate glass cylinder with vacuum in annulus was kept at focal line that maximized the conversion of energy received from sun into useful heat and eventually electricity.

The Status of Power System Transformation 2019 - Power System Flexibility
012
Zoe Hungerford, Szilvia Doczi, Peerapat Vithayasrichareon, Enrique Gutierrez
International Energy Agency, Other

As power systems around the world transform, power system flexibility has become a global priority. A range of operational, policy and investment-based interventions are available to render modern systems more flexible, thereby facilitating cleaner, and more reliable, more resilient, and more affordable energy. This report identifies challenges and opportunities to unlock system flexibility and accelerate power system transformation (PST) efforts. It provides an overview of the policy, regulatory and market instruments which can be implemented in different power sector contexts to mitigate these challenges. Importantly, all power system assets, including variable renewable energy, can provide flexibility services, if enabled by proper policy, market and regulatory frameworks. These assets include power plants, electricity networks, energy storage and distributed energy resources. A wealth of known strategies, approaches and instruments can be readily applied and adapted to power systems. These include modifications to: energy strategies; legal frameworks; policies and programmes; regulatory frameworks; market rules; system operation protocols; and connection codes. Moving forward, updating system flexibility policies to match the pace of technological development can help to accelerate global PST, while ensuring that all classes of power system assets are able to receive fair remuneration for the flexibility services they are capable of providing.

All power system assets can provide flexibility services if enabled by proper policy, market and regulatory frameworks. Even VRE resources are emerging as a flexibility resource. Several countries (e.g. Australia, Ireland, Spain and the United States) have introduced market reforms and regulations that activate VRE flexibility. In the United States, innovative flexibility retrofit investments have been demonstrated in existing conventional power plants, such as hybridisation with BESS. Moving forward, efforts to modify connection codes and market rules will be key for all assets – including power plants, electricity networks, DER and energy storage – to receive fair remuneration for their flexibility services.

Electricity networks remain a critical enabler of system flexibility. Various policy and regulatory instruments can de-risk new network investments in support of system flexibility, and promote more “system-friendly” deployment of VRE. In the United Kingdom, a “cap-and floor” regulatory regime mitigates investment risk in merchant interconnection projects by protecting investor in years with low market revenue in exchange for capping revenues in high revenue years.

Battery energy storage systems are becoming a cost-competitive flexibility provider. Regulatory innovations can help to unlock the multiple value streams of energy storage. Australia, the United Kingdom, the United States and the European Union’s Electricity Directives offer useful examples of regulatory innovations.

Stimulating Markets for Variable Renewable Energy Through Corporate Purchasing Commitments
013
John Bruce Wells
US Agency for International Development (USAID) Vietnam Low Emission Energy Program (V-LEEP), implemented by Deloitte Consulting LLP, Vietnam

Corporate entities with facilities in Asia are increasingly interested in procuring renewable power to meet sustainability targets, hedge against power price volatility, and add resiliency and reliability to their power supply. However, restrictions and complexities within the transitional power markets found in many Asian countries present barriers to such Direct Power Purchase Agreements (DPPAs). This presentation will describe a stepwise approach to DPPA policy development proven effective in Vietnam: (i) forming consumer coalitions; (ii) building awareness of the benefits of DPPAs; (iii) determining legal and regulatory requirements to facilitate DPPAs; (iv) aligning DPPA policies with power market and renewable energy policy development; (v) building technical and operational capacity among power sector agencies; and (vi) pilot project implementation.

Grid Loss Protection for Solar-Wind Hybrid Based Utility Interactive Inverter
014
Jeykishan Kumar K1, Sudhir Kumar2
1 Engineering Officer, Central Power Research Institute, India
2 Joint Director, Central Power Research Institute, India

Anti-islanding protection is very important for modern inverters connected to utility. India is a fast growing economy with raising energy consumption through renewables having a target of 175 GW by 2020. This paper describes the anti-islanding protection function in a 20 kW solar-wind hybrid inverter with battery backup option considering only the solar input side connected at input and utility connected at output side. As per the Indian standard 16169 which was released in 2014, any power conditioning unit connected to utility must disconnect from utility within 2s after it goes off-line. The three different voltage levels and total of 31 conditions were simulated for various real and reactive power maintaining quality factor 1 at utility side through a 200 kW RLC load and the disconnection time of inverter were obtained through a high definition oscilloscope. For the inverter tested for anti-islanding protection function, it was found that in all scenarios the inverters disconnection time was well within two seconds as per the limit imposed by IS 16169:2014.

ADDRESSING ISSUES IN RENEWAL INTEGRATION BY USING SPARE GENERATORS AS SYNCHRONOUS CONDENSER
017
DHANANJAY KUMAR CHATURVEDI
Associate & General Manager (Retd.) NTPC Ltd., India
CIGRE INDIA, India

BACKGROUND

India has set a target of achieving 175GW generation through solar, wind and other renewable resources to be achieved by end of year 2022. In the near future when renewal penetration to the network will be sufficiently large, it will impose several challenges for grid operator. The issue of maintaining voltage profile during dynamic and transient grid conditions subsequent to renewable mix generation needs to be looked into, on top priority. The flexible generation due to unpredictable wind pattern and solar generation which sometimes varying in nature due to cloud movement, will impose a challenge to ensure the power quality and efficient grid operation. The additional large scale VAR control requirement due to solar and wind addition needs to be met by installing new VAR compensation equipments.This paper suggests use of spare generators stored at different projects as synchronous condenser to augment MVAR requirement of different regional grids. The investment to install synchronous condenser is much lower as compared to other FACTs devices, besides offering better performance under dynamic conditions emerging from renewable generation variations. The machine will also meet high short circuit current requirement and high inertia due to rotating heavy mass to take care of transient active power support.

AVAILABILITY

Several large rating turbo-generators (500MW, 660MW and 800MW) are available and stored at different project sites in India. It may be noted that stator replacement of large unit has been very rare in past. Also the rewinding of generator can be done almost in same time span as required in case of replacement of large turbo-generator.

Condition of Generator insulation system- It has been seen that the condition of machine insulation system deteriorates, if it is not in operation and adequate measured for protection not taken during long storage. In absence of proper storage guidelines, many times these machines expose to poor environmental conditions causing insulation deterioration.

PROPOSAL

It is proposed to use these spare generators at location close to their site in respective regions as synchronous condenser to meet the VAR requirement of system during dynamic and transient conditions.This scheme will make the machine available in healthy condition, if required to meet any eventuality in future.

ADVANTAGES

Major benefit of using spare 588MVA, 776MVA and 940MVA generators,will meet frequent MVAR support requirement. Also improving the grid stability and power quality. The synchronous condenser also has several advantages, especially high Short Circuit and inertia to handle transients and dynamic disturbances. The proposed layout plans in paper.

Hydrokinetic-Solar Hybrid Floating Renewable Energy Generation System to Explore Hydro and Solar Power Potential Worldwide
018
BALRAM BHARDWAJ, NARAYAN BHARDWAJ
MACLEC TECHNICAL PROJECT LABORATORY PVT. LTD., India

Energy is one of the most important building blocks in human development, and as such, acts as a key factor in determining the economic development of all the countries. In an effort to meet the energy demands, non-renewable resources are significantly depleted by human use and use of renewable resources of energy is rapidly increasing worldwide as they can sustain indefinite human exploitation.

The Solar power, one of the potential energy sources, is a fast developing industry in India but only through exploiting solar energy, India cannot become energy surplus due to the limitations of Solar Power in terms of availability, technological efficiency and economical feasibility.

Therefore it is need of the hour to explore promising sectors of renewable energy and among the promising sectors, Hydro power sector is the most suitable.

To meet the country’s target of producing renewable energy of 175 GW by 2022, the hydro power sector can contribute majorly as India have the total potential hydropower is 1,48,704 MW, of which 84% potential hydropower is concentrated in the Himalayan Regions states. But utilization of this Hydro power potential does not possible without making Dam or Reservoir or Head based hydro power plant installation.

Building large hydro dams is very costlier as the large hydropower projects include Sardar Sarovar project and Maheshwar Project in Narmada valley in Madhya Pradesh, etc. are witnessing displacement of thousands of people from their ancestral place, destroying their livelihoods and violating human rights in the name of development leaving them with no alternatives. After so many years of the struggle, thousands of displaced people from above projects still waiting for justice in these valleys. Apart from anthropogenic loss, these projects permanently destroyed the local environment and contributed in global warming by engulfing major chunk of forest.

The only way forward in order to save rivers and reduce the current rate of ecological degradation is to switch towards alternate hydro energy generation technologies in which without making any civil structure, electricity can be generated through hydro turbines. That is the main reason why we have chosen Hydrokinetic is the field of energy generation as VARUN-III, Product of MACLEC, generates electricity directly from water velocity, without making dam or any civil structure.

VARUN-III is hybrid of Solar PV System and Hydrokinetic Turbine installed in a single floating platform which allow it to harness electricity from running water as well as from sunlight. Installation of Solar on the floating structure of hydrokinetic Turbine VARUN-III save land cost, reduce installation and power transmission cost apart from it easy availability of water facilitate O&M of Solar.

First pilot of Solar Hydrokinetic Hybrid have been installed successfully at Upper Ganga Canal in collaboration with Government and results are encouraging

Testing and Certification Procedure for Distributed Power Generating Units According to the New CEA Regulation for Grid Connectivity in India
019
Nivedh BS2, Fritz Santjer1, Jens Dirksen1, Sokratis Tentzerakis1, Guido Broering3, Saptarshi Chatterjee3, Phubade Pasakawee3
1 UL International GmbH, Germany
2 UL India, India
3 DEWI-OCC Offshore and Certification Centre GmbH, Germany

After five years from the introduction and implementation of grid connectivity requirements for wind turbines and generating stations using inverters, the Central Electricity Authority of India (CEA) has recently come up with an amended Regulation, including modifications and new connection rules, such as:

  • introduction of the requirement for overvoltage ride through capability (OVRT)
  • prioritization to the reactive power instead of active power during low voltage ride through (LVRT)
  • expansion of the LVRT and OVRT capability requirement to all generating stations and including voltage levels below 66 kV at the interconnection point

The experience from testing and certification according to the previous requirements, has shown that the existence of a concrete and unambiguous testing and certification procedure for the verification of grid compliance is important for all involved parties (public authorities, manufacturers, testing and certification bodies etc.) to work more efficiently and speed-up the installations of distributed power generating stations in India, towards the ambitious goal for renewable energy penetration set by the Government of India for 2022.

Following the latest CEA Regulation, UL developed an updated procedure for the Testing and Certification of power generating stations to conform to the new requirements. The new procedure takes into account not only the new CEA Regulation but also latest developments in the relevant international standards such as the new IEC 61400-21-1 standard for the testing WTs and the new revision of the German Testing guideline FGW-TG3. Further information from other standards under development is considered, such as the new EN 50549-10 for compliance testing of power generating units to the European network code, as well as the IEC 61400-21-2 which will cover the testing at the point of connection of wind power plants.

The presented work consists of the following parts:

  • Description, analysis and challenges of the new CEA Regulation 2019
  • Demonstration and analysis of the experiences of UL from several testing and certification campaigns performed up to now in India, as per CEA Regulation 2013
  • Presentation of the major updates in the relevant international standards (e.g. IEC 61400-21-1), focusing on the technical topics of interest for the CEA Regulation
  • Deployment of a testing procedure for CEA considering all the above, referring to single generating units but including also recommendations for testing at the power park level, where applicable.
  • Proposal for setting up an efficient certification procedure highlighting the differences between previous and new CEA regulation.

The presented procedure aims at facilitating the work for grid compliance verification of the Public Authorities of India by aligning procedures among the involved Testing Institutes and Certification Bodies, whereas it will help the Manufacturers in the design and manufacturing phase of their Products.

Techno-economic Assessment of Deep Defossilisation Pathways for the Entire Energy Sector for the Five Regional Grids of India
020
Ashish Gulagi, Manish Ram, Christian Breyer
Lappeenranta University of Technology, Finland

A recent report from Intergovernmental Panel on Climate Change (IPCC) reaffirms the need to limit global temperature rise to below 1.5oC in comparison to the pre-industrial levels for avoiding disastrous climate change effects. The current energy system in India is dominated by coal in the power and industrial sector and by oil in the transport sector. Keeping up with the development pathway, rapid rise is expected in demand for energy-intensive materials and transportation. Therefore, in the future, India’s role in sustainable energy transition will play a major part in achieving the climate change target.

In the power sector, India’s investment in solar and wind energy has increased rapidly in recent years. First, thanks to the government’s ambitious targets to reduce its carbon intensity and to have 40% of its total installed capacity from renewables by 2030. Second, made possible by the dramatic cost decline of renewables, making it cost competitive against coal. However, to achieve the 1.5oC target, pace of renewable energy adoption in other sectors such as industry and transport needs to increase. In this context, transition of the entire energy sector is relevant as this sector is responsible for majority of the GHG emissions. The main aim of this study is to do techno-economic analysis of different deep defossilisation pathways towards 100% renewables in hourly resolution from 2015 to 2050 for the power, heat, transport and industry sectors.

For this study, India is subdivided according to the 4 regional grids (Northeast regional grid is combined with Eastern regional grid) and these regional grids are interconnected via HVDC lines. Different scenarios: Current Policy Scenario (future national policy developed by the NITI Aayog) and a Best Policy Scenario (100% renewable energy system) with and without the application of greenhouse gas (GHG) emissions cost are analysed to compare cost and GHG emissions reduction. The model optimizes the least cost mix of RE power plants and storage technologies needed to be installed to achieve a fully RE-based power system by 2050 considering the base year’s (2015) installed power plant capacities, their lifetimes and total electricity demand.

The preliminary results suggest that a massive gain in energy efficiency is possible due to the high level of electrification across sectors. Solar PV and batteries will play a major role in enabling transition towards a low cost fully sustainable energy system. Additionally, role of coal in industry will reduce to zero in 2050 and will be replaced by electric and biomass based heating. Fossil fuel consumption in the transport sector decreases through the transition and is replaced by electricity, synthetic liquid fuels and hydrogen. It is possible for India to achieve zero GHG emissions at Levelised Cost of Electricity (LCOE) comparable to that of today.

Controlling Power Generation and Ancillary Services from Variable Renewable Energies (Wind and Solar)
021
Eckehard Tröster1, Ulrich Focken2, Shirish Garud3, Christian Nabe4, Mandeep Kaur5
1 Energynautics GmbH, Germany
2 energy & meteo systems, Germany
3 The Energy and Resources Institute, India
4 Navigant Energy Germany, Germany
5 GIZ, India

This paper describes the results of a GIZ funded project, where the possibilities to control active power and to provide ancillary services with renewable energies in South India were investigated. The project, which was conducted in the first half of 2019, was split into two work packages. First, a survey was conducted to find out the capabilities of wind and PV plants in South India to control their active power and to provide ancillary services. This included also the available communication infrastructure and options for retrofitting.

In the second work package, the regulatory framework, grid code and market design was analyzed. In the next step suggestion for improvement were drafted to implement active power control and provision of ancillary services by wind and solar power plants. To elaborate these recommendations international best practices from different countries have been analyzed.

The Future Micro Grid Power Source: TEG Integrated PV Systems
023
Challa Babu
Research Scholar, India

In recent years, renewable power generation sector moving very faster rate than any other power generation in India. The developments in the Thermoelectric Generator (TEG) materials made this to feasible for Photovoltaic (PV) module. The PV integrated TEG (PV-TEG) have utilizes the additional heat of the PV module to produce electrical energy. The TEG provides the cooling for the PV module such that the power generated by the PV also increases. The total electrical power generated by the PV-TEG is higher than the standalone PV with an overall efficiency of 24 to 32% depends on the module parameters. The economic analysis done for the different PV/Thermal systems, to find the economical feasibility of PV-TEG system.

A Review on Power Quality Issues Due to High Penetration Level of Solar Generated Power on the Grid
024
Rahul Gopalkrishna Suryavanshi1, Irrana Korachagaon2
1 Gogte Institute of Technology, Belagavi, Karnataka, India
2 Tontdhera college of engineering Gadag, India

In last one decade there has been a tremendous growth in the field of grid tied Photovoltaic (PV) generating plants in INDIA. With the recent government subsidies and reduction in the panel prices, the generation capacity has increased from few kilo-watts to hundreds of Mega-Watts. This rapid escalation in the penetration level on the grid has increased the utility companies concerns about its impact on the power quality of the system.

In the Current scenario the penetration levels of the Photovoltaic generating in INDIA is 2.20% [1], which is very low to create any kind of significant power quality issues on the grid, however power quality issues such as power factor and current harmonic have been identified in some cases. But with the increase in the penetration levels of PV generator on the grid, it may start affecting the overall power quality of the system. Power system stability and security issues, voltage variation (i.e. sag & swell), reverse power flow, power factor, and harmonics are the major power quality issues which may arise due to increased PV penetration.

This paper gives an overall review of different power quality issues which may arise due to increased penetration level of PV generator on the on the grid in India.

Performance of Test Bench Testing for the Evaluation of Grid Compliance of Wind and Solar Generating Units
025
Sokratis Tentzerakis1, Fritz Santjer1, Jens Dirksen1, Nivedh BS2, Guido Broering3, Michael Critchfield1
1 UL International GmbH, Germany
2 UL India, India
3 DEWI-OCC Offshore and Certification Centre GmbH, Germany

The state of the art in the grid compliance testing of wind turbines and solar inverters (PGUs) is to perform the tests in the field and only some components, such as the grid protection devices, may be tested at laboratory facilities. Field testing provides the advantage of examining the behavior of the complete system at actual environmental and grid conditions. On the other hand, test bench testing may give the possibility of performing further tests for the investigation of some electrical parameters of the PGUs in a more controlled and detailed manner, such as the reactive power dependency on voltage changes or the set-point control, but for tests like fault ride through capability and power quality, there are still many open technical issues to be addressed and discussed in order to establish a standardized and universally accepted procedure.

Main concerns which have to be investigated are the following:

- Which electrical characteristic parameters can be reliably tested at a test bench and which are the restrictions?

- Which tests are imperative to be performed in the field?

- How does the test bench characteristics influence the performance of the tested PGUs?

- How can we draw conclusions for the performance of the complete unit based on the subsystem or component testing?

Driven by these concerns, IEC has recently launched a dedicated Working Group aiming at the thorough technical investigation of the topic in order to define the relevant requirements to be included in a separate international standard for the measurement and assessment of wind turbine components and subsystems (future IEC 61400-21-4).

In the present paper, an investigation of the topic of subsystem testing of Wind and Solar stations is performed and specific proposals are formulated.

The work will consist mainly of the following:

• Description of the international experience and review of the status in the standardization of test bench testing worldwide

• Classification of test benches in terms of complexity (constant or varying torque, rotor modelling, inverter only without rotating machine etc.) and proposals for options that can be really applied from practical perspective.

• Proposal for the range of validity of the tests at a test bench

• Proposal for the field and test bench testing for the main electrical characteristics.

The contribution of the presented work will be to provide a necessary technical background for the advantages and disadvantages of wind turbine and solar inverter testing at test benches, to be considered for the grid compliance evaluation.

Use of Meteogram and Radar Imagery for Grid Operation: An Indian Experience
026
P.K. Agarwa, Devendra Kumar, Alok Kumar, Paresh Khandelwal, Sunil Kumar Kanaujiya
Power System Operation Corporation Ltd, India

The total installed capacity of Indian grid is 350 GW as on 28.02.2019]. The installed capacity comprises of 222.97 GW of Thermal, 45.96 GW of Hydro, 75.05 GW of RES and 6.78 GW of Nuclear Generation. The electricity demand is highly dependent on weather conditions and its vide variation over the day and seasons poses a big challenge to system operators in terms of secure and reliable grid operation. The integration of anticipated renewable power of 175 GW by 2022 in the grid which is highly dependent on weather, further increases the level of challenges. To plan and manage the secure and reliable system operation, it is imperative to have an accurate understanding of this variability and its impact on the power system. This paper discusses about under stacking weather through Meteogram and its usage for generation scheduling, shutdown planning and demand management. Improved real time grid management using Radar imagery by system operators and analysis of overall improvement in system operation using effective visualization of adverse weather conditions also has been highlighted in the paper

Improved Fault Detection, Classification and Protection with Maximum Power Point Tracking (MPPT) Technique
027
Jvalant Modi, Manan Pathak
Aditya Silver Oak Institute of Technology, Ahmedabad (Gujarat Technological University), India

Mostly we use PV modules are based on poly or mono-crystalline technology. The I-V Characteristic of Solar Module Indicates Open Circuit Voltage as Voc and Short Circuit Current Isc. The modules are arranged in series to achieve the required dc bus voltage and in parallel for increasing current. This combination of series and parallel modules forms PV array. At any time, there exists a unique operating point at which the power is at peak i.e. max. Power Point (MPP). MPP fluctuates continuously as irradiance and temperature varies. So MPP tracker (MPPT) is needed to ensure the maximum power is always extracted from PV array. Electrical Power Generation in Solar Module is totally dependent on Solar Irradiance. Due to Non-Linear output characteristic Fault Detection is quite difficult. Partial Shading condition will result into low power. Line to Line fault at low power is difficult to detect. OCPD’s are not capable to detect faults in every condition. GFPD’s Improper Operation. Line to ground faults at higher irradiance. Faults on DC sides and High DC arc. Renewable energy is expected to play an increasingly prominent role in Indian power sector in the coming decades and giving its various benefits. The main intention for this study is to emphasizing on Renewable Energy and to improve the performance of Solar Power Plant by providing almost better MPP Tracker. There were several papers are available for the field of solar and deferent methodology is implemented to improve the same. It is quite difficult to identify the fault location in Solar PV system and especially at DC side for PV arrays. Main functions of charge controllers are low voltage disconnection (LVD) to protect the battery from deep discharge and high voltage disconnection (HVD) to protect the battery from overcharging. To improve the performance of PV output MPPT algorithm can be applied by matching the PV array impedance and load impedance. In P&O an initial point is chosen and perturb (or disturb) until the value of the variable is increasing. When the value decreases stop perturbing. Move in the reverse direction to obtain the maximum value.  The Incremental Conductance (IC) method locates MPP by differentiating the PV power with respect to voltage. MPP is located when the differentiation result is zero. A boost converter can be applied on both the PV and grid for regulating the output voltage.

The main objectives of this paper is to Improve the Efficiency and Performance of Solar PV Grid Tied System with IOT based Tools/ Machine Learning. Raspberry Pi and Arduino can be used for the same and Performance can be improved along with the same monitoring of each array is also possible. Fault finding and repairing can become easy task for Plant Operator. Shadow effects can be optimized using the same.

A Review: Diagnosis and Classification of Faults in Electric Vehicle for Energy Storage and Electric Motor System
028
Manan Pathak1, Dr. Varsha Shah2, Dinesh Kalola3, Jvalant Modi1
1 Aditya Silver Oak Institute of Technology (Gujarat Technological University, Ahmedabad), India
2 Sardar Vallabhbhai Patel National Institute of Technology, Surat, India
3 Electropower Consulatancy, Santej, Ahmedabad, India

Transport is the largest consuming sector representing 40 per cent of total energy in the world. The recent development of electric and hybrid vehicles is potentially providing effective solutions to the reduction of the use in fossil fuel. As per forecast by International Energy Agency (IEA) in its Global Outlook 2018 report, electric car stock will be ~ 70 million by 2025. World Bank announced that it will stop financing upstream oil and gas projects after 2019 to raise funds to finance a shift towards clean energy. In this paper the research challenge is to optimize a novel framework for managing electric vehicle telemetry data through a process of AI based Algorithm to translate this data into useful engineering information for new, model-based, control system solutions for the vehicle‟s performance. Current and voltage are the most commonly used detection parameters for EVs. Apart from these, temperature, vibration, power, noises, and torque are also utilized on the basis of different detecting techniques. Overheating of electrical machines leads to rapid failure. Hence, the main limitation on electrical generators and drive is a temperature limit, which is generally enforced with an electrical fuse (current limit). The smart sensors once integrated into system give real time information allowing an unparalleled understanding. Furthermore, they may be used to investigate fast charging protocols and ageing. For any specific faults in Electric Vehicle like over charge / overheating, short circuit / open circuit of cell etc in Energy storage fault and abnormal connection of stator winding, O.C. or S.C. of stator winding, bearing failure, S.C. of rotor winding etc in Electric Motor fault. We can consider n no. of case and optimize the value of that specific fault by analyzing data of fault. By doing feasibility study and design optimization of all faults in Electric Vehicle for specific condition we can build prototype for mathematical model of EV and validate simulation results with experimental data through Lab demonstration model.

Synchrophasor Technology: Addressing Integration of Renewable with Synchronous Grid by Real Time Monitoring Through WAMS
029
D N SHAH, D P PARMAR
STATE LOAD DESPATCH CENTRE,GETCO, India

Integration of renewable energy sources introduce uncertainties and strains to the power system operations, which is closer to stability limits. The integration of renewable generation with conventional power grid poses challenges to power system dynamics due to its variable nature and different type of renewable generation have different behavior pattern. This requires the real time monitoring of electric grid, which can be achieve through Wide Area Monitoring Systems (WAMS).

Synchronized phasor measurements is already recognize as one of the promising technologies for developing Smart Grid applications. In recent year’s power, utilities all over the world focused their attention to deployment of Phasor Measurement Units (PMUs), which measure power system parameters in real-time. GETCO had taken a pioneer step for installation of 118 PMUs at 25 Location including 4 RE rich location in Gujarat grid. This paper covered how Synchrophasor Technology will help in addressing integration of renewable with synchronous grid. GETCO experience of implemented synchrophasor technology in grid, & potential application of PMUs for Power systems operation under high wind penetration & other RE sources and impact of RE on power quality issues by using PMU data is presented.

SLDC Gujarat Experiences on Existing RE Integration
030
BIRENDRAKUMAR M SHAH, Kamlesh K Sharma, Vikas K Virparia
State Load Despatch Centre, Gotri, Vadodara Gujarat, India

The Power Installed Capacity of Gujarat State is 28.1 GW includes 8.0 GW installation of RE & 0.78 GW Hydro. The wind installation is 5.80 GW and Solar is 2.20 GW. The uses of hydro is as per irrigation and drinking water requirement. The hydro generation remains available only in peaking hours. The reversible pump mode operation in hydro station is yet to be established. There are adequate gas based installation in the State, but, it is not on disposal for meeting variability of wind generation due to high variable cost.

The maximum demand of the State remains 15 to 18 GW. The 1.5 GW wind & 2.5 GW demand variation in a day are quite common. The State is committed to tap generation from all renewables without curtailment, to supply uninterrupted, reliable power to its citizens. SLDC Gujarat has tapped ever highest 4.75 GW wind, 1.4 GW solar, 18.4 GW demand without any interruption and curtailment.

In era of tight DSM regulation, The State grid operation is passing through shortage of balancing resources, absence of ancillary services and many challenges.

The State has always strives for accurate renewable energy forecasting, demand forecasting, maintaining network availability, system parameters for ensuring reliable and economic grid operation by adopting new technologies and software applications.

The system operation scenarios with high RE capacity mainly divides:

High wind - less solar – less demand scenario

Less wind – high solar – high demand scenario

High wind variation – high solar – less demand variation

High wind variation – high solar – high demand variation

High wind – high solar – high demand

There are different kind of challenges in all above scenarios.

For smooth RE integration, the basic requirement is to have accurate wind & load forecasting and to have accurate weather forecasting data, real time generation data of all RE resources.

Most of RE pooling stations are located on coastal lines. The humid and saline atmosphere affects significantly on performance of Transmission Network. The pooling station owner are not coming forward for establishing Reactors, Capacitor banks, SPS, wind MoD etc. Sometimes, they are reluctant to curtail RE generation when there are major constraint.

The GoI has given target to the Gujarat State to enhance Solar capacity to 8.0 GW and wind capacity to 8.8 GW by 2022.

As way forward, there is an emerging need to introduce regulatory framework for getting accurate RE forecasting from pooling station, installing reactors and capacitor banks at pooling stations, commencing HVRT / LVRT features in all type of WTGs, introducing Merit order dispatch, Providing SPS for curtailment of wind energy. if need arise, Energy storage devices and to operationalize pump storage devices in the system by way of introducing ancillary services. It shall be necessary that pooling station owners should adopt and vigorously follow the recognized practices for conditional monitoring & maintenance.

Green Elevator Using Solar Power
031
Ranjit Singh1, 2, Niranjan K3
1 Assistant Professor, Guru Nanak Institutions Technical Campus, India
2 Research Scholar, Dr. M.G.R Educational & Research Institute, Chennai, India
3 Student, Guru Nanak Institutions Technical Campus, India

ABSTRACT

A case study for using solar power for emergency lift operation in hospitals, residential buildings and educational institutes is discussed. After doing the total load calculations, it was estimated that less than 30 m2 roof area and accessories are sufficient to facilitate the system. Also the components required for carrying the project are Arduino Uno, Servo Motor, and Servo Motor with driver, solar panel, charge controller, battery. The project is very useful as it uses the solar energy which is totally renewable and cheap as well. This project is environment friendly and useful as well.

Solar off Grid System Using Array and String Monitoring
032
Ranjit Singh1, 2, P Sairam3
1 Assistant Professor, Guru Nanak Institutions Technical Campus, India
2 Research Scholar, Dr. M.G.R Educational & Research Institute, Chennai, India
3 Student, Guru Nanak Institutions Technical Campus, India

ABSTRACT

This project is very useful for monitoring the string of solar panels connected together and as well converting the dc into useful AC which can be stepped up and down by using transformer. This project can serve both AC and DC Loads. Also the components required for carrying the project are Arduino Uno, transformer, String of solar panels, DC and AC loads, battery. This project can be used by the village people where there is a scarcity of electricity.

ASSESSMENT OF RAMP-CAPABILITY AND RESERVE MARGIN REQUIREMENT FOR THE STATE OF TAMIL NADU WITH HIGH RE PENETRATION FOR YEAR 2022
033
Pritam Sunil, Ankita Samui, Suramya Dwivedi, Arun Unni, Ravi Segal
GE Energy Consulting, India

The possible challenges of high Renewable Energy (RE) integration arise when the online generators are short of ramping capability and offline generators need time to come online to meet the ramping requirements. To improve flexibility and security of power system for RE accommodation, additional reserve margin may be required. This paper analyzes the net load variations and developing ancillary service requirements to support renewable expansion, the determination of appropriate constraints that reflect the additional variability and short-term uncertainty introduced by RE generation through statistical analysis.

By 2022, the MNRE targets total 160 GW variable RE (vRE i.e. wind & solar) installation in India with highest RE targets for the state of Tamil Nadu, 8,884 MW Solar and 11,900 MW Wind. To put this in context, the projected Peak demand in 2022 for Tamil Nadu is around 21.5 GW while peak demand for the Southern Region is around 66.7 GW (as per 19th Electric Power Survey of India), thereby indicating that in absolute terms the total RE installed capacity in Tamil Nadu is ~94.14% of the state’s peak demand and 31.15% of the Region peak demand. Analyzing such large RE installation in a state is crucial for the dispatchers to understand and quantify the impact on the thermal power plant performance and maintaining the system stability.

High-resolution load and vRE production data for a chronological period are the primary inputs to this analysis. For each 15-minute interval, the change in net load is calculated to determine the variability in vRE generation within the hour. Then mathematical and statistical techniques was applied to characterize and quantify this variability in the case where reserve requirements are determined prior to the operating hour. These statistical characteristics are required to develop reserve requirements. The process starts with the determination of 15-minute variability in vRE generation (Delta), followed by utilizing this variability to determine the standard deviation limits within which the vRE generation is likely to deviate from the forecasted values (Sigma Delta). Based on experiences gained from previous instances, it was empirically estimated that about 2.5σ may be sufficient to provide reserves to cover most of the intra-hour variations in Wind and Solar. Some values of deviation between consecutive time-blocks may be exceptionally high, which is dependent on the accuracy of forecast, and as such these values are considered as outliers and may be excluded from actual calculations.

Developing operational reserve requirements from variability metrics is an evolving science.This paper evaluates the reserve requirements that use current hour values of load and wind and solar generation along with forecasts of those quantities for the next time slot as inputs. Analyzing the standard deviation will help in determining the reserve requirement to cover most of the inter-hour variability due to vRE generation.

Electric Vehicle as a Flexible Load
034
Rishika Sharan, Vandana Singhal
Central Electricity Authority, New delhi, India

Abstract— India is keen to attempt to work towards a low carbon emission pathway. As per goal set up for Intended Nationally Determined Contribution (INDC) by India, India has to reduce the emissions intensity of its GDP by 33 to 35 per cent by 2030 from 2005 level. Harnessing Renewable energy (RE) sources is one of the attempt to work towards a low carbon pathway. Sustainable green transportation network is another measure for achieving this goal. To accelerate development and deployment of renewable energy in the country, the Government is taking a number of initiatives like, upscaling of targets for renewable energy capacity addition. Government of India has also taken multiple initiatives to promote manufacturing and adoption of electric vehicles in India. Due to variable, intermittent and non-dispatchable generation from RE sources, the safe and reliable grid operation is the next step towards the readiness for integration of such huge capacity of RE into the grid. Presently the balancing of grid for variability and intermittency of RE generation is done by ancillary services, already in place and by increasing/decreasing of generation from conventional sources. In the year 2021-22, when the capacity of RE is expected to be 175 GW (37 % of the total IC) and further upto 275 GW (44% if the IC) in the year 2026-27, some other measures needs to be identified for balancing the grid. As the % of RE generation into the grid increases, the difference in maximum and minimum load to be met from coal generation during the day will also increase. This leads to increase in ramp up & down capacity and its change in rate, reserve capacity, residual capacity, spinning reserve and balancing capacity in the grid. In order to reduce the said difference, some measures like operation of some pre identified units of coal and gas and hydro plants in the form of flexible generation may be made operational into the grid. The temporal shifting of Renewable energy generation with the help of energy storage like battery storage and pump storage may also be helpful to achieve this. Further, the flexible load in the form of flexible loads in buildings, Electric vehicle charging, may also be effective in providing flexibility to net load curve. Also, since, EVs needs charging stations to charge the batteries, the impact of EVs on power system cannot be ignored. The impact of EV charging will be felt first at local hotspots on distribution grids before the other levels i.e. generation, transmission and grid are affected. As the EV load penetration increases, their potential to contribute to flexibility services via Demand Side Response (DSR) will also increase. It can play an active role in increasing the flexibility of power systems. Electricity markets should also facilitate the EV load to participate for grid balancing. The policy and regulatory frame works are also required to be modified suitably. .

A Techno-Economic MILP Optimization of Multiple Offshore Wind Concessions
035
Stephen David Hardy1, 2, Kristof Van Brusselen1, Stijn Hendrix1, Hakan Ergun2, Dirk Van Hertem2
1 CG Holdings Belgium NV – Systems Division, Antwerpsesteenweg 167, B-2800 Mechelen, Belgium, Belgium
2 CG Holdings Belgium NV – Systems Division, Antwerpsesteenweg 167, B-2800 Mechelen, Belgium, Belgium

Within this work, a techno-economic optimization of large offshore wind regions, consisting of multiple concessions is developed and investigated via two case studies. One within the Belgian North-Sea and one within the Gulf of Cambay, where India’s first offshore wind project is being developed. Currently, the practice within the offshore wind industry is for countries to designate an offshore wind zone within their exclusive economic area. This zone is then further divided into individual concessions which are auctioned off to developers. Developers then optimize each individual concession independently. As such, research on electrical system optimization has been heavily focused at the scale of the individual concession, ignoring the possible gains that come from current or future developments in neighboring concessions within the same region [1]. It is believed that there is a significant opportunity for both cost savings and increased system reliability by optimizing an entire offshore wind zone prior to the development of each individual concession [2].

The optimization is structured as a mixed integer linear program based on the DC power flow formulation. Typical voltage levels for AC and DC transmission are included as well as mid-point reactive power compensated AC transmission. The optimization finds a global minimum for the lifetime cost of energy. To guarantee the feasibility of the results, a full AC analysis of the proposed technical design is performed. The lifetime costs accounted for are capital expenditures related to material and labor, operating expenditures related to plant maintenance and operation, and the expected energy not served. The use of site-specific wind profiles and turbine specific power curves make for geographically and technologically relevant solutions.

To demonstrate the benefits of optimizing an entire region, two case studies are investigated. The first offshore wind zone analyzed is within the Belgian North-Sea, consisting of 10 concessions all at varying degrees of development. The zone spans an area of 175 km2 and will have a total capacity, once fully developed, exceeding 2.2 GW [3]. The second, is one of Gujarat’s most promising offshore wind regions, “zone A”, with an area of 1921 km2 consisting of 19 subdivisions of 500 MW each [4]. Comparing the optimal solution of the Belgian North-Sea to the existing as-built solution permits quantization of the gains to be made via the proposed optimization. Contrasting the solutions of the North-Sea and the Gulf of Cambay allows for an understanding of the impacts that different environmental and topographical conditions may have on the optimal transmission system design.

[1] Lumbreras et al. Wind Energy 16: 459-473 (2012)

[2] Ergun et al. IEEE Transactions on Sustainable Energy 3(4): 908-917 (2012)

[3] https://www.4coffshore.com/offshorewind/ (2019)

[4] Garrett et al. Pre-Feasibility Study for Offshore Wind Farm Development in Gujarat. May 2015

Solar Bicycle
036
Sravan Kumar Banavaram1, 2, S Nikhil3
1 Assistant Professor, Guru Nanak Institutions Technical Campus, India
2 Research Scholar, DR. MGR Educational and Research Institute, Chennai, India
3 Student, Guru Nanak Institutions Technical Campus, India

Since the fuel prices not only in India but throughout the world are increasing day by day thus there is a tremendous need to search for an alternative to conserve these natural resources. Thus a solar bicycle is an electric vehicle that provides that alternative by harnessing solar energy to charge the battery and thus provide required voltage to run the motor. Since India is blessed with nine months of sunny climate thus concept of solar bicycle is very friendly in India. The components are solar panels, BLDC Motor, Accelerator, Hall Effect sensors, controller circuit, Battery, charge circuit. The project is very useful as it is environment friendly.

Western Regional Renewable Energy Management Center - System Architecture, Handling of Challenges Related to RE Forecasting, Scheduling & Integration into Grid and Way Ahead.
038
Kiran Kamlakar Rasane
Siemens, India

In a pursuit of adding 175 GW of RE capacity, India has already reached a stage where contribution of overall RE in toltal installed capacity is more than 20%. Inastalled capacity of RE stands at 75 GW at the beginning of 2019. Challenges in grid operation, generation-demand balancing and grid security are inevitable while more and more RE is being added.

The need of common platform for all the concerned stake holders was absolutely essential to address the issues related to RE intrgartion and related grid operations. Renewabe Energy Management Center(REMC) is this platform which provides grid operators an unique system to deal with complex problems of forecasting and scheduling of RE and its integration into grid. Siemens' experience while working on Western Region REMC (WR REMC) project is presented in this paper. The WR REMC included supply, testing and commissioning of WR REMC control center systems across 4 control centers in western region for Mahatransco, GETCO, MPTransco and WRLDC.

Paper also mentions the area of improvement in overall system setup, consideration of guidelines which are different for state and regions and its impact on overall operation and handling of RE resources.

Market for Tertiary Response in the Indian System Highlighting the Dynamics of Short Term Market for Tertiary Reserve
039
Gourav Kumar Mukherjee
Deputy Manager, POSOCO, India

India has set a target to fully integrate 175 GW of renewable energy in the grid by the year 2022. Renewable energy comes with its advantage of clean energy but having a lot of unpredictability and therefore requires sufficient availability of reserves. Tertiary reserve can help restoring the frequency to a value closer to the nominal, following a sudden dip or rise in the frequency.

In India Tertiary response is being provided by Central Generating Stations whose tariff is being determined or adopted by the Central Electricity Regulatory Commission of India. The un-requisitioned surplus available in these generating stations are used to dispatch the Reserve Regulatory Ancillary Service (RRAS). However, this comes with the following challenges:

1. When the surrendering beneficiary recalls its power back from the dispatched quantum of RRAS, the quantum of power available for ancillary service reduces.

2. At times of necessity, the volume of un-requisitioned surplus may not be sufficient, to restore the frequency by the desirable magnitude.

In this paper an ancillary dispatch market mechanism is proposed so that a broader spectrum of generating stations including the Central Generating Stations can participate for the tertiary response. This will help in overcoming of the above two challenges and benefit the power system operator with better control. In the Western countries a pay-as-bid mechanism is used in the ancillary market. However, to develop a market for the Indian system a separate mechanism has been developed in this paper. The whole market based tertiary control shall involve three key steps which are as:

A. Selection of Generators: The quantum of reserve required in each 15-minute block will be known upfront by the system operator and, generator bids up to that quantum will be cleared. Uniform price will be paid to all the participating generators as per the average MCP of the energy market. This will form the fixed charge of ancillary dispatch. Introduction of a separate fund for accounting the fixed charge has been proposed in the paper.

B. Dispatch of Generators: In real time operation, based on the required quantum of ancillary dispatch, the generators will get selected in an ascending order of their bids. However, the payment to the generators will be uniform depending on the average frequency of the block of the scheduled dispatch. This will form the variable charge of the ancillary dispatch and will be cleared utilizing the Deviation pool fund maintained by the system operator.

C. Settlement based on Dispatch efficiency: A novel mechanism is introduced in this paper, where in the generators will be settled based on their actual metered energy. Using the direction of the deviation vector, the energy will be settled based on their bid in the selection process.

The adequate amount of tertiary reserve available with this mechanism will help system operator in addressing the balancing issue with high penetration of renewable energy.

Using Conventional Coal Fired Plants for Large Scale Integration of Wind & Solar
042
Chinmoy Mohanty, Mahesh Kendhe, Sanjeev Duggal
GE Power India Limited, India

With the advent of large scale implementation of Renewable Energy in India, grid stability, future operational regime of conventional plants, options of storage technologies to be adopted, overall economic cost of generation and advanced maintenance practices are the most relevant themes that has engaged all the stakeholders to find the most optimal solutions.

While there are various directions in which adoption of green technologies are being considered not limited to evolving market dynamics, need of ancillary studies, Wind/ Solar forecasting and modelling, grid balancing, transmission system innovations, Electric Vehicles, our existing coal fired generation fleet present low hanging fruits towards this journey of adoption and integration of Renewable Energy Technology specifically Wind and Solar which present the challenge of variability. The variability introduces the need of operational flexibility and storing excess energy.

As coal power will continue to be a key pillar of electricity generation in India, it also provides a great potential in providing the operational flexibility and options for storing excess energy generated from variable sources. Upgrading existing coal fired plants has a very strong potential to reuse bulk of existing infrastructure,

GE, the most experienced manufacturer of power gear with one third of the worlds installed fleet and global player in upgrading coal plants, offers a range of solutions to enable existing coal fired plants to provide operational flexibility to the grid. This track focusses to discuss possibilities/ concepts on state of art technologies/ solutions GE has pioneered to achieve the above objectives of using conventional generating assets for large scale integration of Renewables.

Building Transactive Energy Markets (TEM) to Optimize Renewable and Distributed Energy Resources Grid Integration
044
Abhinav Jain, Aman Narula
Accenture Strategy, India

Building Transactive Energy Markets (TEM) to optimize Renewable and Distributed Energy Resources grid integration:

Growth of renewables and distributed energy resources (DER) such as large scale grid connected solar plants, solar PV with batteries, storage, EV charging points etc., and flexible consumption patterns at the edge of the grid offers a new opportunity for grid operators to optimize whole-system. If regulators, policy makers and grid operators plan to optimize grid operations for the benefit of every stakeholder then it is imperative for them to optimize utilization of these flexible supply and demand resources at all levels. However, it is easier said than done because these resources are growing at the high voltage as well as at the edge (medium/low Voltage level) of network, and traditional mechanism of whole-sale market valuation (based on average estimates) and centralized control (predominantly driven by transmission & high voltage level) might not work effectively to optimize these resources. There is need of a short term balancing market supported by retail transactive energy marketplace which is enabled by a distributed intelligent systems those facilitate real-time valuation of flexible services at the edge of the grid and federated control.

The Point of View (PoV) will discuss:

What is Transactive Energy and Transactive Energy Market, and key terminologies those we need to understand such as Control Mechanism, Economic Mechanism and Value to appreciate the TEM? How transactive energy markets can enable whole system optimization?

What is the drive, value and business case such as agile renewable integrations, Totex optimization, Carbon footprint reduction etc. for grid operators and regulators to implement transactive energy markets?

What are some key use case scenarios for Transactive Energy Markets for grid operators such as:

  • Manage energy during peak heat day
  • Manage variability of renewable resources
  • Voltage Response Service
  • Asset Health Management
  • Microgrid management in islanded mode
  • Avoidance of Load Shedding

Once the context of TEM, benefits and use cases are defined then the PoV will discuss a roadmap to establish TEM. It will showcase enterprise architecture of a smart distribution system operator with IT-OT systems such as SCADA, ADMS, OMS, DERMS, AMI, GIS, MDMS, CRM and EAM. PoV will also focus on the role of cutting edge technologies such as Artificial Intelligence, Big data analytics, IoT and Blockchain to establish transactive energy markets, promoting optimization of renewables and DERs on grid.

Other aspects such as overall policy and regulatory vision-and-objective, roles and responsibilities (system operators, aggregator etc.), transactive parties, extent and scope of transactions, settlement rules for inter and intra jurisdictions etc. will also be covered as a part of discussion.

The concluding section will define a roadmap to achieve this journey.

A Scalable Impact Analysis Framework for Electric Vehicle Integration into Urban Distribution Networks in Delhi
045
Shibani Ghosh1, Akshay Kumar Jain3, Aadil Latif1, Richard Bryce3, Adarsh Nagarajan2, Michael Emmanuel5, David Palchak4, Jaquelin Cochran2
1 Lead Researcher, United States
2 Group Manager, United States
3 Research Engineer, United States
4 Senior Researcher, United States
5 Postdoctoral Researcher, United States

As electric vehicles (EVs) are rapidly becoming commonplace worldwide, many states in India are setting the trends by encouraging fast EV rollouts in urban areas. Adopting EVs, including electric two- and three-wheelers, are expected to reduce vehicular contribution to air pollution and improve air quality as a result. To promote EV adoption among consumers, various programs and schemes are being launched to support setting up required infrastructure, for example, The Draft Delhi EV Policy 2018. Such policies identify charging infrastructures as a key driver making power distribution entities play a vital role behind EV adoption.

The scalable EV impact analysis framework presented in the paper is being developed by NREL, as part of a collaborative effort with USAID and BSES Rajdhani Power Limited (BRPL). This framework is capable of analyzing the network readiness by preemptively addressing the range anxiety concerns of possible EV owners/drivers. EV adoption scenarios addressed in this work, are modeled for two feeders in BRPL’s service territory in Delhi.

The Python-based framework estimates aggregate EV demand profiles and assesses the grid impacts of growing number of EVs using OpenDSS-based (an open-source power system simulation tool for distribution systems, developed by Electric Power Research Institute (EPRI), USA) feeder models. Based on EV penetration level inputs (low, moderate, or high), this framework is first used to determine required number of residential, workplace and public charging infrastructures. Once the number and locations of the chargers are identified, the framework combines charging profiles under three possible scenarios- residential-dominant (mostly overnight charging), workplace-dominant (morning to afternoon), or public station-dominant (early morning, noon, and afternoon to evening). The modeled EV demand profiles are then added on top of existing base loads for the feeders, within the stipulated time horizon. Lastly, a feeder-specific comparative analysis among the three charging scenarios is summarized in terms of grid readiness metrics.

Acknowledgement: This work was supported by Alliance for Sustainable Energy, LLC, the manager and operator of the National Renewable Energy Laboratory for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding was provided by the U.S. Agency for International Development. The views expressed in the article do not necessarily represent the views of the DOE or the U.S. Government. The U.S. Government retains and the publisher, by accepting the article for publication, acknowledges that the U.S. Government retains a nonexclusive, paid-up, irrevocable, worldwide license to publish or reproduce the published form of this work, or allow others to do so, for U.S. Government purposes.

Distribution Systems Planning and Analysis Framework for Indian Feeders
046
Akshay Kumar Jain1, David Palchak2, Aadil Latif3, Richard Bryce4, Michael Emmanuel5, Shibani Ghosh6, Adarsh Nagarajan7, Jaquelin Cochran8
1 NREL, United States
2 NREL, United States
3 NREL, United States
4 NREL, United States
5 NREL, United States
6 NREL, United States
7 NREL, United States
8 NREL, United States

Integration of distributed energy resources (DER) such as photovoltaics, electric vehicles (EVs) and battery energy storage systems (BESS) is expected to rapidly increase in distribution systems in India. These grid edge resources can have adverse impacts on the grid and can provide additional revenue streams as well. To mitigate these impacts distribution planning and analysis is required. So this paper presents a framework which can be used to complete all steps involved in distribution planning and analysis. This framework uses data in the same format as is readily available with Indian utilities and processes it to generate detailed feeder models and loading profiles. This framework already includes multiple DER use cases such as peak shaving for BESS and EV demand modelling and can be easily extended to simulate a number of additional use cases. All of these use cases can be simulated in parallel for multi-year time series simulations using an integrated command line interface. A suit of grid readiness metrics are then evaluated for each simulation to determine required network upgrades and associated costs.

Framework for Evaluating Grid Readiness for Integrating Electric Vehicles and Utility Scale Storage in India
047
Shibani Ghosh3, Akshay Kumar Jain4, Richard Bryce4, Michael Emmanuel5, Aadil Latif3, Adarsh Nagarajan1, David Palchak2, Jaquelin Cochran1, Sertac Akar8, Timothy Remo3, Abhishek Ranjan6, Naveen Nagpal7
1 Group Manager, United States
2 Senior Researcher, United States
3 Lead Researcher, United States
4 Research Engineer, United States
5 Postdoctoral Researcher, United States
6 AVP, System Operation, India
7 General manager, India
8 Systems Engineer, United States

Electric vehicles (EVs) and distributed solar are poised to grow substantially in India in the coming years following ambitious Government of India targets. The localized impact of these changes, both in terms of infrastructure investments and demand patterns, are not well understood, nor are tools for this type of analysis readily available. This paper describes the development of a framework that can analyze network readiness in terms of feeder impacts for distributed energy resources (DERs) including growing EV penetration, and the potential solutions introduced by utility-scale battery energy storage systems (BESSs).

The building blocks of the feeder analysis require multiple data sets to be compiled into a usable network model. The work is driven by feeder head and distribution transformer (DT) loading data along with all the technical specifications and schematics of distribution feeders. These measured datasets are conditioned to remove any afflictions, and the cleaned load profiles are used to perform multi-year quasi-static time-series power flow analyses on detailed three-phase feeder models. EVs translated to grid-tied loads are represented with aggregated EV demand profile estimates based on possible charging scenarios in residential sector, and in workplace and/or public charging stations. Finally, BESSs are evaluated for their cost-effectiveness in the framework through an initial screening that includes the benefits of grid service applications to mitigate present and future overloading scenarios. The outcomes from this framework are expected to help utilities gauge the readiness of their distribution grid for integrating an increasing number of EVs as well as load growth during a projected multi-year time horizon, where BESSs can contribute in making the grid more reliable.

Study of Impact of Forecasting Methods on Reliability of RES
048
Sumbul Hasan1, Himanshu Bahirat2
1 Indian Institute of Technology,Bombay, India
2 Indian Institute of Technology,Bombay, India
Study of Impact of Forecasting Methods on Reliability of RES

Abstract: -

Wind power plants (WPP) are intermittent source of energy unlike conventional power plants, it is difficult to firmly dispatches them. Modern grid codes requires the wind power plants to be dispatched like traditional power plants, for this reason wind farm operator have to rely on prediction for short term wind power to schedule wind farm. Wind farm operators submit the bids in day ahead market based on forecasted wind power while updated wind forecast is used for hedging the bids in the electrical market. Any deviation of the actual wind power generation from the schedule wind generation is either adjusted by purchasing /selling energy in real time market, otherwise wind farm operators have to pay deviation cost as penalty. Hereby, the accuracy of the prediction system has economical and technical impact on the operation of grid with high RES penetration. In this proposed paper, comparison of three well known prediction methods like Persistence, ARIMA, Markov chain is made by evaluating the statistical metrics like mean absolute error (MAE) and root mean square error (RMSE). A well-established operating strategy min-max method is used to control the operation of the BESS connected to the wind farm. The impact of accuracy of the different method of wind forecasting on the reliability of the system is studied in this paper by evaluating reliability indices like energy served (ES), energy not served (ENS) and energy not utilised (ENU).

Barriers and Opportunities in Integration of Battery Storage: A Comparative Study of Indian and European Markets
049
Asif Nazar1, Naqui Anwer2
1 PhD Scholar, TERI School of Advanced Studies, Plot No. 10, Institutional Area, Vasant Kunj, New Delhi-110070, India
2 Associate Professor, TERI School of Advanced Studies, Plot No. 10, Institutional Area, Vasant Kunj, New Delhi-110070, India

Variable Renewable Energy Sources (VRES) are rapidly ingressing in the energy mix of India, Europe, and other countries. With this comes the issue of Grid Balancing. Sooner or later these countries with increased penetration of VRES will have to incorporate Storage as an inbuilt strategy to nullify intermittency of added renewable sources. Battery Storage has many advantages over existing Pumped Storage and other Storage options. It is the response speed and other matching attributes of Battery Storage vis-a-vis other Conventional Flexible Generations that make Battery storage better candidate for Grid Balancing. There are certain issues like financial viability of Battery storage that is coming in its way of acceptance. But its financial viability is linked to the current practices observed by Electricity markets. The existing and prevailing Electricity markets are heavily skewed towards Conventional Generators. Currently Battery Storage is participating in Tertiary Frequency Regulation Ancillary Services. Here compensation is not commensurate with capability of Battery Storage. Compensation for participation in Primary Frequency Regulation Ancillary Services and Secondary Ancillary Services are far better, but in many countries Battery Storage are not participant to these Ancillary services, hampering the financial viability instead of its merit and capability. In some Electricity markets in the US and Europe, Battery Storage has made entry taking into account its inherent charging and discharging time characteristics. It is worth exploring and including Battery Storage as an option in Electricity market on all forms of Ancillary services. Time is ripe including Storage as a plausible solution in Grid Balancing. Barriers and opportunities co-exist. Ultimately rules and mechanisms have to evolve so as to make Battery Storage as an alternative in Grid Balancing.

Modelling and Forecasting Scope of Distributed Renewable Energy Resources (DRER) in Upcoming Capacity Pricing Model in India.
050
Ankit Sinha, Ameya Ulhas Ghodke, Ayush Goel
ICF International India Pvt Ltd, New Delhi, India

Jawaharlal Nehru National Solar Mission (JNNSM), launched in 2010 by central and state government, with the target to achieve 20GW by solar 2022, which was then revised to achieve 100GW of the solar capacity by 2022, which included 60GW of ground mounted and 40GW of rooftop generating units. However, the target is to achieve the 175GW of renewable energy generation potential by 2022 which includes 100GW of Solar, 60GW of Wind Energy, 10GW of bio-energy and 5GW of small hydropower plants.

The figure clearly states that a large amount of capacity will come from small scale generating units of Solar, Wind and Hydro Power Plants. Nevertheless, renewable energy has the basic intermittency issue with energy dispatch because of the dependency on the weather conditions, that causes the issue of Reliability, Stability and Quality (RSQ) of Power. Apart from this, the issue of Affordability, Availability and Accessibility (AAA) is another change that will be faced by the Indian Power Grid and Power Sector with the large-scale renewable integration, which will also include Energy Storage and Electric Vehicles in upcoming market scenario.

These small-scale Distributed Energy Generation (DEG) systems can be aggregated as Distributed Renewable Energy Resources (DRER) in order to serve the grid and help to improve the RSQ by the portfolio energy mix of Solar, Wind and Hydro Energy Resources, it can also include Energy Storage as well. As the combination of various sources of energy/electricity will increase the reliability and availability of the system. Hence, aggregation of the renewable resources as a single virtual generating unit, that can serve the grid in the most reliable way. DRER is also another means to meet the energy demand of any household or facility which is affordable, reliable and clean energy resources. Technically, any power generation system on the distributed system that produces energy or electricity, but it is not included in the formal definition of Bulk Electricity System (BES)/Captive Power Producer (CPP)/Merchant Power Producer (MPP)/Independent Power Producer (IPP) of Central Electricity Regulatory Commission (CERC) or Electricity Act' 03.

DRER is the combination and advancement of the FIT (Feed In Tariff) and BTM (Behind The Meter) concept. This concept can simplify the issues of modelling, forecasting energy dispatch and that could be associated with the upcoming amendment in Electricity Act'03 of capacity pricing model in the tariff calculation. Each individual entity/generator/energy storage resources in DRER aggregation could be served as Generation Resource; Aggregation contains only generators and could be used for injection purpose only. Or DRER could be served as Injection and Withdrawal Resources; Aggregation that contains generators, as well as energy storage system, hence could serve as energy bank whenever energy is cheap, high in supply and low in demand and curtailment resources.

Enabling Fast Response Ancillary Services Using Pumped Storage Hydro Power Project
051
ANANT DIGAMBAR SANT1, 2, NIKITA BHIMRAO THAKARE2
1 SAVITRIBAI PHULE PUNE UNIVERSITY, India
2 SAVITRIBAI PHULE PUNE UNIVERSITY, India

Fueled by Paris Agreement commitments, the Government of India has set an ambitious target of achieving 175 GW of renewable energy capacity by 2022. These include 100 GW of solar capacity addition, 60 GW of wind power capacity. Renewables being inherently intermittent sources of Power Generation, due to their dependence on weather conditions, affects the stability of grid system. Integrating such amount of an intermittent source with present-day grid, it becomes very essential to incorporate the techniques which would be helpful to maintain reliability of the grid. Ancillary Services are the services necessary to support the power system operation in maintaining power quality, reliability and security of the grid. The ancillary services current available in India, are provided by mainly coal based power plants. The POSOCO is discussing hydro as ancillary services, however no hydro power plants are providing ancillary services as on date. PSH are unique in operation. It operates as generator as well as load. Daily load curve of India has lot of peaks and valleys during a day. Though most of the states have enough generation to meet the load requirement, the variations in the load during the day are not predictable. The sudden load variations during the day makes the life of system operator miserable. Further, the stringent conditions of regional Deviation Settlement Mechanism has also increased complexity and financial burden on the states. To tackle such challenges SLDCs requires fast responding storage devices under their command and control. The existing ancillary services framework at regional level is the right step in this direction however, it is available for RLDCs and not SLDCs. Majority of power share is handled by SLDCs. India has a large potential of PSH (about 94000 MW) specifically concentrated in the western ghat region in Maharashtra and Gujrat states, where demand of both states is also very high. However, of the 94000 MW potential only 6000 MW is harnessed till date and that to some of the PSH are not operating in Pumped mode due to various technical and commercial reasons. Development of PSH is not upto the mark due to various reasons such as No standard methodology to access the economic viability of PSH project, No regulatory framework to compensate the PSH for providing ancillary services, No focused efforts by appropriate authorities to promote development of PSH by addressing the technical and environmental issues in development of PSH. As regulatory framework is not conducive, private investment is not being attracted for development of PSH besides having huge potential. If conducive regulatory environment is created, PSH could be game changer as an ideal Source for ancillary services. This Paper deals with the Technical, Commercial and Regulatory aspects of PSH towards its unique offerings in ancillary services market.

Optimal PMU Placement for Performance Monitoring of Renewable Power Plants
052
Soudipan Maity, Zakir Hussain Rather
Indian Institute of Technology Bombay, India

In line with the global growth of renewable energy (RE), India is also rapidly integrating wind and solar photovoltaic power to the national grid and has a current cumulative installed capacity of around 60 GW and a target of 160 GW (100 GW of solar PV and 60 GW of wind) by the year 2022. However, the variability and uncertainty associated with RE generation significantly impact power system operation, particularly, under high RE penetration. Therefore, for ensuring secure and stable grid operation under variable RE penetration, several measures for preserving the steady-state and dynamic stability of the grid have been imposed on the RE plants through grid code regulations, such as the Indian Electricity Grid Code (IEGC) applicable in India. Some of the critical provisions present in grid code regulations for RE power plants include frequency regulation, voltage ride-through capability, active power regulations, and power factor regulation.

Despite the presence of these regulations, the steady-state and dynamic operations of the plants are generally not monitored on a real-time or near real-time basis. The plants are also not put through strict compliance checks of all the prescribed criteria under operating conditions. This limitation, in turn, inherently poses a significant concern about the steady-state and dynamic stability of the grid during any contingency. The traditional Supervisory Control and Data Acquisition (SCADA) systems have a measured data update rate of around once every 4 to 6 seconds. This rate is highly inadequate to capture the system dynamics essential for analysing the dynamic performance of RE plants, studying contingency scenarios, and taking swift control actions. Therefore, in this backdrop, this paper attempts to bridge the gap by proposing a strategy to monitor the continuous operations of the RE generating stations using the network of Phasor Measurement Units (PMUs) located at various strategic and critical buses in the grid. The proposed performance monitoring strategy will enable the capture of the time-stamped dynamics at a much faster rate essential for analysing the disturbance and post-disturbance scenarios. For aiding this objective, several instances of optimal placement of PMUs have been developed by using binary particle swarm optimisation for monitoring the operations of the RE plants in the grid effectively.

Comparison of Grid-Forming Converter Control Strategies in a Renewable-Rich Power System
053
Bandopant Pawar, Saikat Chakrabarti
Department of Electrical Engineering, Indian Institute of Technology Kanpur, Kanpur, India

With increasing penetration of renewable power, the generation portfolio in power systems will change from the dominance of synchronous generators (SGs) to increasing mix of power electronic converter-interfaced sources. Even though the percentage of installed renewable capacity may be moderate, the instantaneous penetration will be high, currently which is the case of Denmark. The grid support services for stable, secure, and reliable operation will have to be provided by the renewables. The inertia of a synchronous machine acts as a safeguard during load/generation mismatch. The synchronous machines have the advantage of self-synchronization, large transient current tolerance, and robust control; but their controls are slow acting. The power electronic converters have negligible overload capability, and their controls are faster but fragile.

Most of the existing power converters operate in the grid-following mode. However, these controls are found to be poor within the first few cycles after the disturbance due to the accuracy and the bandwidth of sensing mechanism, i.e., phase lock loops. The recent example is the South Australian blackout. The grid-forming mode of converter control is more robust as it acts as a controllable voltage source without using grid voltage tracking. The main approaches in the grid forming mode are droop control, synchronous machine emulation, matching control based on the similarities between SGs and power converter, and dispatchable virtual oscillator based control.

In this work, all the four approaches of grid-forming control are implemented in power converters connected to the transmission grid. A controllable DC source feeds the inverter irrespective of the primary energy source such as solar PV, wind turbine, or battery energy storage. Various grid forming approaches differ in synchronization and active power or frequency control whereas, the closed-loop control of the terminal bus voltage replicates the AVR of SGs. The cascade loop control structure ensures reference tracking with voltage and current limits. The control parameters are tuned to get the identical load sharing in each control strategy.

The EMT simulations are carried out in Matlab/Simulink using Kundur two-area test system. The synchronous generators are replaced by the equivalent power converters with scaled parameters to account for a large number of smaller units. The average switch model of the power converter reduces the computation time while capturing the required details. The dynamic interactions are studied by changing control parameters. The impact of DC side dynamics is evaluated on the system stability. The performance of all the four control strategies is compared during disturbances such as load change, generator outage, etc. The results show a similar steady-state response from all the control strategies, but transient response varies based on their characteristics such as inertial support, fast frequency response, etc.

VALIDATION AND BIAS CORRECTION TECHNIQUES TO IMPROVE NWP WIND SPEED DATA
054
Rangaraj A G1, Boopathi K1, Krithika V2, Srinath Yelchuri1, Balaraman K1
1 National Institute of Wind Energy, India
2 UK Facility Services Pvt. Ltd, India
Wind power forecasting is critical for integration of wind generation into the Grid. Accuracy of wind prediction is one the biggest challenges faced by researchers around the world as it depends on the Numerical Weather Prediction (NWP) data. The NWP models have evolved over a period of time. However, it is noted that even with various statistical post-processing techniques, there is a void in the accuracy of wind speed forecast with NWP models. This is mainly due to the limitations in the data assimilation process, numerical approximations, parametrization, spatial/temporal resolution and non-availability of actual terrain/ground measurement data. The accuracy of medium term NWP model data output typically day-ahead or week-ahead can be heavily impacted due to variation in localized or unforeseen weather changes in a particular site location. Wind speed and wind direction of NWP model data are the most crucial parameters in the modelling of wind power forecast system. In this paper, the monthly, seasonal and yearly NWP wind speed data is analysed and validated with the measured wind speed data from the MET MAST. In order to effectively identify the offset and biases to correct the Indian NWP wind speed data and hence improved the wind forecasting accuracy, a new algorithm is proposed using mathematical, machine learning and hybrid approach. It is acknowledged that various data viz, Indian regional model NWP data, Indian global resolution NWP data and MET MAST data for 20-site locations are obtained from National Institute of Wind Energy, Chennai to carry out the present research work.
Uses of Block Chain Technology in Redesigning Power Market for High Level of Renewable Energy in India
055
Sanjay Prakash Bhagat
Scientist C Ministry of New and Renewable Energy, India

Blockchain is a decentralized ledger technology. When applied to the energy sector, it will enable people to trade energy among themselves. It is a secure, continuously growing list of records. It is constructed as a decentralised database that is distributed and managed by peers, rather than by a central server or authority. This technology is enabling a new world of decentralised communication and coordination, by building the infrastructure to allow peers to safely and quickly connect with each other without a centralised intermediary. Cryptography ensures security and data integrity, while privacy remains intact. Renewable Energy is also decentralized and distributed energy source. Currently, efforts are made to integrate Renewable Energy in the grid for centralized control of Renewable Energy. This is because there is no technology available to manage and control distributed and decentralized Renewable Energy. Block Chain may provide tools to manage it locally. This may be possible for peer to peer trading of electricity produced from Renewable Energy without using any middleman. The general idea behind blockchain technology is to allow decentralisation and build security. The advantages of blockchain are increased trust and minimization of time for a process to take place. Moreover, it also removes cost overheads and intermediaries. India has set an ambitious target of 175 GW of RE in energy mix by 2022. Almost 40 percent of target has been achieved, these high level of RE in electricty mix will certainly change the way Indian Power Market Operates. This paper finds a way to formulate a power market with high RE in electricity mix in India using blockchain technology.

Wind Forecasting Techniques Using ANN
056
Sanjay Prakash Bhagat
Scientist C Ministry of New and Renewable Energy, India

India has set an ambitious target of 175 GW of RE by 2022 in this target 60 GW is planned from winde energy.In India, wind energy has a remarkable growth, but the major issue with the system is that power generated from wind is uncertain and variable in nature. To address this issue, the Artificial Neural Networks (ANN) may be used. In this paper, the forecasting of wind power is presented for a set of sample wind power data from the state of Tamilnadu with the help of multilayer ANN. For wind power forecasting, the local temperature and wind speed are very important parameters. The most important aspects of this paper is forecast of temporary wind speed which becomes more important for the power system management or energy trading due to the high penetration of wind power technology and wind energy market developments in the state of Tamilnadu.

Development of Mechanisms to Incentivize Inter-State Exchange of Renewable Energy
057
Subhranshu Patnaik1, Rajneesh Sharma2, Krushna Kaant Gupta3, Abhishek Dave4
1 GTG - RISE (Greening the Grid, India Renewable Integration and Sustainable Energy Initiative), India
2 GTG - RISE (Greening the Grid, India Renewable Integration and Sustainable Energy Initiative), India
3 GTG - RISE (Greening the Grid, India Renewable Integration and Sustainable Energy Initiative), India
4 GTG - RISE (Greening the Grid, India Renewable Integration and Sustainable Energy Initiative), India

India aims to achieve 175 GW of renewable energy (RE) capacity by 2022. Being a climatically diverse country, India’s RE capacity addition target is highly skewed. Eight RE resource rich states of country, are having target of 74% RE capacity addition target, while in FY 2017-18 energy requirement of top eight states was about 62%.

Geographical imbalance in installed RE capacity will create a need for an eco-system which will promote inter-state RE trading. This issue has been examined under the USAID funded GTG-RISE program to enable and promote inter-state RE power exchange through developing a White Paper. The paper examines various issues in existing regulatory, transmission infrastructure and, market and commercial framework, to understand the misalignments in the operational and commercial practices, which is inhibiting inter-state RE exchange. The misalignment in regulations resulting in societal losses, while issues in transmission pricing for inter-state RE transmission posing a question mark over its sustenance and acceptability in long term to other participants of inter-state transmission corridor. Absence of ancillary market and aligned commercial framework, not allowing cost reflective engagement of balancing services for grid security. Addressing these fundamental issues will enable the creation of an eco-system which will propel RE capacity addition and its effective grid integration. The paper is an output of extensive stakeholder consultations across states including distribution utilities, nodal agencies, IPPs, transmission operators, power system operators, etc. and recommends solutions that would enable increased trading of RE power across states.

Analysis of regulatory landscape revealed how misalignment in pricing methodology among forecasting and scheduling regulations, deviation settlement, and ancillary services regulations, impacting stakeholders. Existing power purchase agreement’s commercial terms are not in sync with operational requirements like compensation for curtailment, participation in automatic generation control market for grid security. Based on the identified issues, short, medium and long term measures have been recommended, under the study.

REC Mechanism in India: Market Analysis, Lessons Learned and Way Forward
058
K. V. S. Baba, P. K. AGARWAL, S. K. Soonee, Minaxi Garg, shailendra Kumar Verma, K. C. Saini
Power System operation corporation Limited (POSOCO), India

Renewable Energy Certificate (REC), a market-based instrument, was introduced in 2010 by Central Electricity Regulatory Commission (CERC) through REC Regulations. Since launch of the Mechanism more than 54 million RECs have bene issued to the eligible entities. And more than 3000 buyers had purchased about 50 million RECs through Power Exchanges. In addition to this, around 7% of new renewable energy investment in the period 2010-2017 came through REC mechanism.

The Renewable Energy target for installation of 175 GW by 2022 and by other initiatives of the government, the grid parity has achieved in the country and prices of the RE power has decreased considerably. As a result, there is a need to relook the design of the mechanism from fresh perspective. In this background, this paper analyses the following including the role of RECs in the promotion of Renewable Energy in the country:

I. Brief details about REC Mechanism: Regulatory provisions and details of the processes involved in the REC Mechanism.

II. Market Data Analysis

  • Registration of RE projects
  • Year-wise breakup of Number of Projects and Capacity in MW
  • Technology-wise breakup
  • Analysis of projects registered under OA/APPC/CGP route
  • Issuance of RECs (Solar and Non-Solar) to RE generators
  • Issuance of RECs to DISCOMs
  • Transaction of RECs on Power Exchanges
  • Number of Sellers & Buyers in monthly trading
  • Sale and buy bids on both power Exchanges
  • Market Clearing Volume (MCV) and Market Clearing Price (MCP)
  • Total transacted value
  • Buyers Details
  • FY-wise number of RECs purchased by DISCOMs
  • FY-wise number of RECs purchased by the OA/CPP consumers
  • State-wise Buyer details

III. Market Design:

  • Salient features of REC Market Design
  • Suggestions for changes in the market design
  • Imperfections of the REC Market
  • Advantage of purchase of RECs vis-a-vis RE for RPO compliance

IV. Lessons learned:

  • Experience of management of the REC Registry
  • Impact of REC Mechanism
  • Experience of compliance audit of RE projects
  • Analysis of Capacity Utilization Factor (CUF) of RE projects

V. Challenges

  • Non-compliance of the RPO by the obligated entities (Distribution companies, Captive Power Plants, Open Access consumers)
  • Lack of Voluntary Market in the country
  • Lack of awareness among CPPs regarding compliance of RPO, penalties, governance Mechanism etc.

VI. Way forward: REC as a pan-India market instrument needs to be promoted through strict enforcement of RPO, voluntary purchase of RECs by the big corporates, merging of RECs with ESCerts, Institutional capacity building etc.

IMPACT ASSESSMENT OF LARGE SCALE INTEGRATION OF ELECTRIC VEHICLE CHARGING INFRASTRUCTURE ON DISTRIBUTION SYSTEM
059
Chandrasekhar Reddy Atla1, Sinan Muhiuddeen1, Srinivasa Narayana1, Hemanth M1, Rahul Bagdia2, Sudhanshu Mishra3, Joerg Gaebler3, Indradip Mitra3, Devanshu Sharma4
1 Power Research & Development Consultants Pvt. Ltd., India
2 pManifold Business Solutions Pvt. Ltd, India
3 GIZ, India
4 BSES Yamuna Power Limited, India

In light of the growing pollution problem, the Government of India, over the last few years, has been increasingly promoting alternative mobility solutions, chief among which are electric vehicles. The paper analyses the impact of large scale integration of electric vehicles on the distribution network by selecting a set of sample feeders with different consumer mix in Delhi city. The number of electric vehicles in the sample feeders is projected for the year 2030 based on the available vehicle registration data, average kilometres run by each segment of vehicles, battery capacities and various electric vehicle policies by Government of India, Government of NCT Delhi, Ministry of Power, Niti Ayog reports & FAME schemes.

The selected set of sample feeders are modelled in power system simulation software MiPower™ used in most of Utilities in India. The 11/0.415 kV distribution network is modelled considering all the distribution transformers, 11kV XLPE cables and 415V XLPE cables up to pole level. Dynamic simulations are carried out for a period of 24 hours with various stochastic scenarios generated based on the characteristics of EV charging, PV generation and Battery characteristics. The following factors are analysed to find the impact of EV on distribution grid: the effect on load pattern, increase in system losses, increase in transformer loading, effect on voltage profile, network loading and augmentation, voltage regulation and maximum penetration of EVs in the network. The results and conclusions obtained from these set of sample feeders is extrapolated to the larger distribution system to assess the impact of large scale integration of electric vehicle charging infrastructure in the electricity distribution system.

The outcome of the study demonstrates that the impact of EV infrastructure on distribution grid and provides the frame work guidelines for policy and regulation authorities. For Distribution companies, it shows how EV penetration impacts the distribution network (LT network, HT network, distribution transformers) with reference to various technical parameters.

Key words: Dynamic simulation, Electric vehicles, EV charging, Grid impact.

Energy Management in a Hybrid Power System
062
Rajesh Saiju1, Alexander Kroggel1, Andre Harewood2, Nils Wiese1
1 University of Applied Sciences Flensburg, Germany
2 Europa-University Flensburg, Germany

Abstract—This paper discusses and describes the structure and operation of an energy management system, which is a part of our ongoing research work. In addition, we show the simulation results and advantages of using an energy management system (EMS) for the island of Barbados and its electrical energy needs.

This management system has the task to meet the voltage and frequency stability criterion in a grid and at the same time to find an economically optimal operating point. The structure of that system is modular. This modularity makes it easy to adapt the EMS to a given electrical grid and its power plants. So a subsequent installation of such a management system is possible. Furthermore, the EMS's modularity is important to be able to respond to newly installed or removed power plants. As a result, this system has the advantage of reacting flexibly to the number or installed capacity of power plants, wind turbines or photovoltaic systems.

The EMS has a communication link to the main producers in the electrical network and can influence the power generation about this way. It receives various information from the connected power plants, e.g., the level of hydropower plants with a reservoir or the currently active power limitation of photovoltaic systems in the event of a surplus of electrical energy. The EMS differentiates between photovoltaic systems, wind turbines, controllable loads, e.g., e-cars, conventional and regenerative power plants, e.g., coal and hydropower plant. In addition, it receives information about the current voltage and frequency in the grid. It collects all the information about the electrical grid and the connected power plants. After that, it evaluates the information with the aid of an algorithm and sends the setpoint values for the electrical power to be fed in via the communication link to the participating power plants. In the long term, each power plant then adjusts the power fed into the grid with the help of a local regulator. As a result, the EMS has an influence on the long-term electrical energy fed into the grid by the power plants. For the long-term control, which is responsible for determining the economically optimal operating point, there are two levels of control. The top level is the energy management system with its algorithm followed by the local controllers of the participating power plants. Short-term load transients or effects of larger short circuits are compensated by the Droop Characteristic in the local controllers.

Keywords—hybrid power system, energy management system, grid stability, economically optimal operation point.

Electricity Vending in Rural India to Reduce Transmission and Distribution Losses.
063
Aarohan Goel
UPES, India

T&D losses correspond to electricity produced but not paid for. T&D losses are caused by a variety of problems, including energy sold at low voltage, sparsely distributed loads over large areas, inadequate investments in the distribution system, improper billing and theft. T&D losses are at the level of 33 per cent with huge revenue losses to the distribution utilities. There are two types of losses, Technical losses, which are entirely in the transmission and distribution systems and Commercial losses, which are in revenue collection, and thievery in distribution systems.

Setting up T&D system in a rural area could be challenging due its distance from generation unit. To address this issue, we can use vending machine technology to create a small distribution centre which may get its electricity from nearby off grid renewable energy setup and an array of battery system. This could ensure in reduced cost of setting T&D system and reducing T&D losses to distribution utilities. The whole generation and distribution setup will reduce the cost of electricity per unit to the consumer and the consumer will enjoy the benefits of pre-paid services from the setup.

For this project proper implementation of communication system should be present to ensure safe and secure transition of electricity along with further research in cyber security. Also, thorough research is required in vending technologies and smart grid technologies to distribute electricity from generated RE units and battery packs.

According to statistics in 2018 nearly 4000 villages still don’t have access to electricity, this research will help those 25 crore people to live a normal life and develop the nation.

Coordinated V2G Scheduling of EV Aggregator with Rooftop Solar Charging Park
064
Suman Sharma, Prerna Jain
Malaviya National Institute of Technology Jaipur, India

Renewable generation intermittency and Electric Vehicles (EVs) charging/discharging scheduling are two significant foreseeable operational challenges in the future grid for System Operator (SO). To meet these challenges, smart scheduling coordination between SO and EV owners is required to synergize grid integration of renewable and EVs. The scheduling coordination between SO and EV is being established by an EV Aggregator (EVA), to provide grid support services through Vehicle-to-Grid (V2G) technology i.e. charging/discharging scheduling of EVs. In this context, proposed work aims an effective utilization of intermittent photovoltaic (PV) generation from rooftop solar charging park by reducing its curtailment while minimizing EVA’s operational cost. The operational cost of EVA considers the procurement cost of charging energy from the wholesale electricity market and cost of battery degradation while ensuring EV owners’ driving requirements. The proposed V2G scheduling also provides congestion management, through price-based demand response program (PBDRP) and considering system constraints presented by SO i.e. transformer delivery capacity and baseload profile. The efficacy of the model is being validated through simulation results analyzing two cases: with and without PBDRP. The proposed model would help SO to maintain techno-economic consistency by reduction of PV curtailment, and peak load management.

Using DSM from Air Conditioners with Cool Thermal Energy Storage to Increase the Wholesale Market Value of Solar PV Electricity - 2040 Scenarios for India
065
Ahmad Murtaza Ershad1, 2, Robert Pietzcker1, Gunnar Luderer1
1 Potsdam Institute for Climate Impact Research (PIK), Germany
2 Technical University of Berlin, Germany

We evaluate the degree to which the wholesale market value of solar PV electricity (VOS) increases when a demand-side management (DSM) measure using air conditioners with cool thermal energy storage (CTES) is implemented at different gross solar PV shares. We examine two DSM measures with different maximum DSM durations, efficiencies and costs namely, mechanical precooling of the building thermal mass using programmable thermostats here called in short, Precooling, and chilled water storage (CWS). Using the open-source power sector model DIETER, we first we quantify the decline in the Wholesale VOS with increasing gross solar PV shares in the final electricity demand for a reference scenario. Next, we quantify change in the wholesale VOS due to our DSM measures compared to our reference scenario in a highly-air-conditioned and low-carbon Indian power system in 2040 under a carbon price of 50 USD/tCO2. We show that the Wholesale VOS declines from 89 USD per MWh at 1 % solar share to less than 10 USD per MWh at 60 % solar shares in our reference scenario driven by a decrease in wholesale electricity prices while solar generation is abundant and an increase in solar curtailment. Precooling and CWS increase the wholesale VOS up to 18 USD per MWh and 26 USD per MWh compared to our reference scenario respectively by improving the matching between solar generation and AC demand profiles, which leads to increased solar-coincident wholesale electricity prices and reduced curtailment.

Assessment of Energy Storage Potential for System Inertia and Primary Frequency Response
066
Priyanka Kushwaha1, Vivek Prakash2, Rohit Bhakar1, Udaykumar R Yaragatti1, Sumanth Yamujala3, Anjali Jain3
1 Department of Electrical Engineering Malaviya National Institute of Technology Jaipur, India
2 School of Automation, Banasthali Vidyapith, India
3 Centre for Energy & Environment, Malaviya National Institute of Technology Jaipur, India

Intermittency and uncertainty associated with renewable energy sources (RES) such as solar and wind would create generation load imbalances and have an adverse impact on system frequency. These impacts lead to recurring events of frequency deviation followed by inevitable contingencies and may endanger system security. The initial frequency deviation can be arrested by system inertia (SI) and primary frequency response (PFR). Large system imbalance requires additional PFR response. In this context, this paper investigates the potential of pumped hydro energy storage (PHES) to maintain frequency stability under large RES integration. Generation scheduling is performed for the day-ahead, to estimate the PFR adequacy. The study envisages the role of PHES for inertial response and PFR, to mitigate generation-demand balance followed by a sudden loss of the largest generation unit. Frequency security parameters like the rate of change of frequency (RoCoF), nadir frequency and quasi-steady-state frequency value are examined for PFR adequacy assessment. Case studies are carried out on a New-England 10 machine test system, to demonstrate the efficacy of the proposed model.

Virtual Power Plants: Power Plants of the Future in India
067
Shivali Dwivedi, Pramod Kumar Singh
ICF Consulting India Pvt. Ltd., India

Growing penetration of Distributed Energy Resources (DERs) and Renewable Energy (RE) in the Indian network is leading to several changes in the system operation. Due to these changes, coordinating operation of the entire power system has become complex. A Virtual Power Plant (VPP) can be one of the effective solutions to manage this transformation. VPP is a portfolio of DERs, which are connected by a control system based on Information and Communication Technology (ICT) [1]. A VPP aggregates the capacity of many diverse DERs and creates a single operating profile from grid’s perspective. This paper will describe the usefulness and opportunities of VPP in India. In addition to discussing the definition and types of VPP existing across the globe, the paper will also highlight the general benefits of VPP for different entities across the electricity supply chain. The paper is segmented into four sections: (i) Defining VPP and its type, (ii) Relevance and plausible schemes of VPP in India, (iii) Example illustrating an opportunity for VPP in India, and (iv) Recommendations and way forward for the Indian market to adopt VPP technology.

The objective of the paper is to give an insight to the readers about this concept and to provide a perspective to the Indian stakeholders for considering the implementation of VPP.

Battery Energy Storage: Unlocking Potential in India
068
Vikas Singh Suhag, Pramod Kumar Singh
ICF Consulting India Pvt. Ltd., India

India has embarked on an ambitious journey to deploy 175 GW of renewable energy capacity by 2022. The journey aims to address complex set of challenges in Indian power sector like access to electricity, reliable supply and reduce carbon footprint of power sector.

This will lead to steep increase in variable renewable energy (VRE) generation capacity in the country as 100 GW solar and 60 GW wind power capacity is expected under the program. The rise in VRE will pose several unforeseen challenges like managing the variability and uncertainty. A combination of technology, regulatory and market design interventions will be needed to find a solution to this challenge.

Due to the number and variety of services Energy Storage Systems (ESS) can provide, the energy storage technologies are often seen as holy grail to address large scale renewable integration issue and increase the penetration of renewables in the grid. Countries like the United States, Germany, Japan and South Korea have identified the role ESS will play in future electricity markets and have taken leap into this segment to become world leaders in deploying energy storage resources.

India too is witnessing a transition in power market as ESS are becoming a reality with Tata Power Delhi Distribution Limited (TPDDL) commissioning India’s first utility scale battery energy storage system (BESS) in February 2019. The paper will explore plausible applications of energy storage in the Indian context across the electricity supply infrastructure (generation, transmission, distribution and behind the meter).

The paper will also present a case study of a World Bank funded renewable and storage hybrid plant in India. The case study will cover the feasible use cases, sizing and economic analysis. The case study will demonstrate economic feasibility of deploying utility scale energy storage systems in India at the generation end. Based on the findings of the case study, recommendations for necessary policies and regulations in India will be made. The recommendation will also be based on successful policies and regulations favoring energy storage deployment in countries like the United States, Germany, Japan, South Korea, China and Australia. The paper will present different financial, technical and other constraints which affect ESS size (both power and energy capacity) and the benefits it can generate for multiple stakeholders.

The paper will help readers understand the diverse applications of ESS, how to draw more benefits from same ESS resource through stacking of applications and gain insights of policies and regulations that have unlocked ESS potential worldwide.

Design of Droop Control Based Real-Time Battery Management System for Automated DC Microgrid
070
Rajeev Kumar Chauhan1, Adeep Mehrotra2, Ashish Agrawal3, B. Ravi Subrahmanyam4, Avanish Gautam5, Divyansh Singh6, Kalpana Chauhan7
1 Galgotias College of Engineering and Technology Greater Noida, India
2 Galgotias College of Engineering and Technology Greater Noida, India
3 Galgotias College of Engineering and Technology Greater Noida, India
4 Galgotias College of Engineering and Technology Greater Noida, India
5 Galgotias College of Engineering and Technology Greater Noida, India
6 Galgotias College of Engineering and Technology Greater Noida, India
7 Galgotias College of Engineering and Technology Greater Noida, India

This paper presents a method to control the charging and discharging power from the batteries in a DC microgrid by employing adaptive droop control utilizing State of Charge (SoC) as a parameter for droop coefficient. In a DC microgrid it is essential to maintain uninterrupted power supply to the load, this is readily achieved by utilizing Energy Storage Unit (ESU) consisting of multiple batteries. In such a system it is while essential to maintain a constant power at the load end and ensure that the batteries provide power to the load and not to themselves due to the flow of circulating current ,however, the SoC of different batteries is not always the same so the droop control is employed to attain pro-rate power sharing in them. In this study a SoC balancing method with an inherent circulating current blocking system is proposed. The battery which has greater SoC will supply greater power as compared to the one with lower SoC and vice versa as a result proportional discharging and charging rates shall be obtained which ensures that the batteries will always supply constant power. This shall be attained by using adaptive droop control wherein droop coefficients are related to the SoC. The proposed method is employed for two ESUs which can be extended for any number of ESUs The report presents a theoretical analysis of the same and results have been analyzed.

Integrating Wind and Solar into the Indian Power Grid: Perspectives Beyond 2022
071
Neshwin Nigel Rodrigues, Thomas Spencer, Renjith G, Raghav Pachouri, Alekhya Datta
The Energy and Resources Institute, India

The Indian electricity sector is expected to undergo significant transition in the coming years, as the share of variable renewables (VRE) increases. A careful study of grid integration challenges and options is essential to understand the implications of increasing VRE. There have been a number of grid integration modelling studies for the period up to 2022, notably the Greening the Grid study. These generally find that India can meet the challenge of integrating 175 GW of renewables (160 GW VRE), under optimising assumptions of high degrees of interstate market connection and highly coordinated and aggressive cycling of the coal fleet. Removing these optimising assumptions to better reflect the current institutional and market conditions raises costs and grid integration risks of a given VRE scenario, e.g. through increased VRE curtailment and increased system-wide production costs.However, there is a dearth of detailed grid integration studies for the period after 2022. This is problematic, as national policy documents such as the National Electricity Plan (NEP) project continued growth in renewables capacity and the share of renewables. At the same time, in the longer-term horizon, new flexibility options such as storage and demand response and demand-side management could play a larger role in VRE integration.

This study adopts a comprehensive approach to study VRE integration in India:

  1. Demand forecasts were conducted using an end-use approach, with explicit representation of equipment stocks and equipment efficiencies in end-use sectors, in order to derive insights into the level and changes in the shape of the load profile.
  2. A supply scenario based on the capacity numbers of the NEP was developed to 2027. Variants on this scenario for higher and lower VRE addition were also developed.
  3. The all India load-profile was projected to 2027, using the load profile factors from the 19th Electric Power Survey and energy requirement numbers from the aforementioned end-use projections.
  4. A production cost model based on the open-source software PyPSA (Python for Power Systems Analysis) was calibrated to reflect Indian conditions.A dataset on the location of and technical and financial performance of existing and probable upcoming dispatchable generators was gathered. A GIS-based model of state-wise VRE potential (wind and solar) was used to determine the siting of upcoming VRE capacities, based on the capacity scenarios described above. These sites were linked to the System Advisory Model (SAM) to generate site-specific renewables production profiles, that could be fed into the production cost model. Data on transmission lines (>220 kVA) was gathered from the NEP Volume 2, and data from CEA and POSOCO. The model was calibrated to be based on a single node per state, abstracting away from intrastate transmission issues. The model provides hourly simulations for the year 2027.
Functional Requirements for Blackstart and Power System Restoration from Wind Power Plants
072
Anubhav Jain, Jayachandra Naidu Sakamuri, Kaushik Das, Ömer Göksu, Nicolaos Antonio Cutululis
Department of Wind Energy - Technical University of Denmark (DTU), Denmark

In the recent years, the worldwide grid integration of renewable energy sources (RES) has grown rapidly. However, the grid-integration of large volume of renewables like wind and solar, interfaced by power electronics converters, is changing the dynamics of the power system and creating challenges to maintain reliability, robustness and stability of electricity supply. Morevoer, the stronger inter-linking of networks poses a greater risk of wide-area blackouts. With the growing share of wind power in the grid and conventional generators being phased out, large offshore wind power plants (OWPP) with state-of-the-art wind turbines (WT) can provide services of blackstart and power system restoration (PSR) in the future. This paper provides an overview of the technical

requirements of blackstart units and the current capabilities of WTs, based on grid-codes, studies on ancillary services and recent blackout experience. Finally recommendations to the functional requirements of WTs are made, to make OWPPs capable of blackstart and help facilitate PSR in the future.

LVRT Induced Frequency Stability in Offshore Wind Power System
073
M M Kabsha, Zakir H Rather
Indian Institute of Technology, Bombay, India-400076, India

Due to high wind speed and high plant load factor in deep oceans, coupled with a saturation of onshore space, offshore wind farms (OWF) are being rapidly integrated into power systems. Several countries are investing more in OWF sector with consistent increase in penetration of voltage source converter-based high voltage DC connected OWF in these countries. Due to significant penetration of OWFs, such countries have developed separate grid code regulations, including low voltage ride-through (LVRT) capability for OWF connection. The OWF, according to LVRT requirement, should stay connected and support the electric grid during LVRT period. One of the critical issues of LVRT capability of HVDC connected OWF is that the OWF cannot inherently detect the faults in the onshore grid, which results in overvoltage in the HVDC link during onshore low voltage faults. Most of the previous LVRT studies on OWF did not consider active power recovery (APR), and none of the reported study has considered voltage dip induced frequency (VDIF) issue. This paper investigates the effect of APR ramp rate on the VDIF response in OWF integrated system. Modified IEEE 39 bus system has been used as a test system and the system performance is evaluated under different case studies, such as, various OWF penetration levels, different fault severity and fault duration.

Energy Storage System to Facilitate High RE Penetration: A Techno-economic Benefit Analysis
075
Anjali Jain1, Yamujala Sumanth1, Partha Das2, Rohit Bhakar1, Jyotirmay Mathur1, Priyanka Kushwaha1
1 Malaviya National Institute of Technology Jaipur, India
2 Center for Study of Science, Technology and Policy, Noida, Uttar Pradesh-201313, India

Ambitious targets for climate-change mitigation and energy sufficiency lead to rising share of renewable energy (RE) in generation mix. With future market scenario and potential of large-scale deployment, major contribution is provided by solar and wind RE sources. However, their intermittent nature not only increases the variability and uncertainty in power system but also deteriorates its performance in many technical and economic aspects such as frequent load & RE curtailment, decreased capacity utilization and increased operating cost of conventional generating units. For smooth integration of RE, grid planners need to ensure that enough flexible options are available down the road that will help to maintain system reliability without deteriorating the performance of conventional units. In this regard, this paper formulates a security-constrained unit commitment (SCUC) problem for a whole year in rolling horizon and performs techno-economic benefit analysis of energy storage system (ESS) to facilitate high RE integration. System benefits are accounted in-terms of reduced system operating cost, increased RE penetration & capacity utilization factor, and reduced CO2 emissions.

IMPACT OF SOILING ON ENERGY YIELD OF SOLAR PV POWER PLANT AND DEVELOPING SOILING CORRECTION FACTOR FOR SOLAR PV POWER FORECASTING
076
Sahana L1, Naveen Kumar GM2, Hans Peter Waldl4, Prasun Kumar Das2, Karthik Ramanathan2, Balaraman Kannan2, Indradip Mitra3
1 TERI School of Advanced Studies, India
2 National Institute of Wind Energy, India
3 Deutsche Gesellschaft für Internationale Zusammenarbeit GmbH (GIZ), India
4 Overspeed GmbH & Co, India

In India, the geographical conditions are varied, and the characteristics of dust depend on the local environmental conditions. The solar power generators must incorporate the soiling losses in their estimation for power output. An attempt to develop a methodology to estimate the soiling correction factor was made. The methodology implemented was research of previous studies on soiling, monitoring and analysis of 20 kW rooftop solar power plant and an experiment to estimate the soiling losses. Extensive research was carried out and a comprehensive review was presented on the effect of soiling on performance of PV plants along with case studies of soiling experiments in India and around the world. A soiling experiment was designed to develop the soiling correction factor. A methodology to calculate the soiling correction factor was developed by analyzing the data from the soiling experiment. The effect of rainfall, humidity and wind on soiling have been analyzed and documented. The performance of one 20 kWp PV plant was monitored to study the effect of weather-related parameters on the performance. The soiling correction factor varied from -1.36% to 3.67% during the period between June 2018 and June 2019 in Chennai. It was observed that the average PV conversion efficiency of the 20-kW plant was 11.75% and the average PR was 75%. It was observed that the correlation between module temperature and DC power; between humidity and DC power; between humidity and DC power varied every month. The R² values for each correlation has been tabulated in this paper. The soiling factor developed was incorporated into the short-term day ahead solar forecasting model. The developed methodology can be applied at the sites of large-scale solar power plants for yield assessment, designing as well as operational forecasting purposes.

Optimized Wind and Solar Power Forecasts for India
077
Hans-Peter Igor Waldl1, Detlev Heinemann2
1 Overspeed GmbH u Co. KG, Germany
2 Oldenburg University, Germany

In order to gain the best possible wind and solar power forecasts for a given application, a detailed analysis of the requirements is crucial. Of course, major parts of wind and solar power predictions algorithms are generic, but detailed solutions which are tailored to the respective situation make the difference between reasonable and excellent prediction accuracy.

In our paper we will analyse the special conditions forecast providers are facing in the Indian context, and we will show approaches which optimize the predictions for these circumstances.

Examples for these conditions are:

  • Meteorological conditions like the big influence of haze and aerosols on the solar irradiation.
  • The availability of an irradiation measuring network with high quality measurement stations (SRRA).
  • A big impact from PV panel soiling for a number of regions.
  • The occurrence of mixed power readings in some states, combining wind, solar and load.
  • Climatological conditions like rainy season and high and low wind seasons, which must be taken into account during tuning of prediction models.
  • Strong impact from the thermal status of the lower atmosphere on wind conditions.

For each identified condition or requirement, we will present a reference solution and the improvement by an optimized respective prediction approach.

Furthermore, we will present proposals how the rules of the energy regulators may be optimized in the future in order to stimulate even better wind and solar power forecasting.

Part of the presented results are gained within a R&D and capacity building project together with the National Wind Energy Institute NIWE and funded by the German giz.

---

To the organizers: If this paper should be selected for oral presentation, please note that I will be at the conference from the very beginning (leading the REMC training course the week before), but won't be available on the 6.9. due to private obligations.

Electricity Markets of the Future
078
Anish De, Manas Tiwari
KPMG India, India

Share of RE in total installed capacity (350 GW) has reached over 21% and it is bound to go up as we move towards the ambitious target of 175 GW RE set by the Government of India (GoI). Climate change commitments and increased competitiveness of RE with conventional power indicates that RE will have a significant share in country’s installed capacity in long term as well.

Electricity markets have a vital role to play in integration of Renewable Energy (RE), particularly in view of positive RE growth outlook in medium to long term. The country today has a well-functioning Day Ahead Market (DAM) where substantial trades take place, providing price signals to both the demand and the supply side. However, beyond the DAM, other market forms like term-ahead and intra-day markets have not met with adequate success. Currently, the overall system relies largely on long term contracts and a scheduling mechanism where load serving entities and eligible customers schedule their own portfolio and also buy from the market on the margin. Imbalances are settled through the Unscheduled Interchange (UI)/ Deviation Settlement Mechanism (DSM) under an administered process from which India has begun to graduate to Ancillary Services (AS) markets.

The fast paced RE capacity addition necessitates relook at the current market design to mitigate the challenges emanating from ingress of variable and intermittent RE generation. Market design interventions require changes beginning with the current planning approaches, to signal how much RE can be economically and securely absorbed by the grid, along the need for network augmentation and operational changes. The Ancillary Services and Real Time markets must be robust to ensure effective mechanisms for handling and settlement of imbalances.

To layout a roadmap for electricity markets of the future, KPMG in India has undertaken a national workshop series, under the ‘Power Sector Reforms Programme’ supported by Department for International Development (DFID) and Ministry of Power (MoP). The series comprised consultation and exchange of ideas with a large number of stakeholders, market players, policy makers, regulators and experts and has led to identification of key challenges, priorities and actions for effecting changes in current market design.

The proposed paper intends to highlight the outcomes of the workshop series which aims to guide the policy makers in steering the market design changes, many of which will be critical for enabling large scale integration of RE. The paper will lay out the key challenges, market design options, international experience, stakeholder perspectives and imperatives for ushering in electricity markets of the future.

Flexibilisation of Coal Fired Thermal Power Plants
079
Doug Waters1, Animesh Kumar1, Manas Majumdar2, Rohit Pepalla2, Anusha Rajagopalan2
1 Uniper, Germany
2 KPMG, India

As India moves towards its target of 175GW power supply from renewable energy (RE) sources, it is imperative to have flexible power supply to balance intermittency in RE generation. A large part of this balancing capacity needs to come from Indian coal plants along with other solutions such as large scale energy storage, demand side management efforts etc. In order to manage intermittency from high RE generation, coal based power plants should be flexible to operate at - (a) low loads, (b) faster ramp rates and (c) rapidly start up or stop based on grid requirements. Since these plants were designed to operate as baseload power plants, retrofitting of components and/or operational changes are required to make these existing coal plants flexible.

Coal plants in several countries with high share of RE penetration have undertaken initiatives to enable flexible operation and have achieved remarkable results like reduction in minimum load to 10-30%, increase in ramp rate to 2%-6%/minute, and significantly reduction in cold- start up time to 75 minutes. For instance, Ratcliffe plant in UK regularly starts/stops for up to 2 times/day; Heyden plant in Germany can operate 10% of capacity for several hours.

To contextualize and customize the interventions for the Indian market, KPMG along with DFID, Ministry of Power, APGENCO and Uniper undertook a pilot study in Andhra Pradesh (high RE state), primarily to evaluate the extent of flexibilization required and intervention needed to achieve target level of flexibility. At 18GW RE capacity Andhra Pradesh state is expected to face large scale RE curtailment (upto 20% in 2022) if Minimum technical Limit (MTL) aren’t reduced below 55%, however if MTL is reduced to 30% there would be <2% RE curtailment.

For the pilot, Sri Damodar Sanjevaiah thermal power station (SDSTPS) was chosen. As a middle of merit order dispatch plant, SDSTPS needs both low load operation and rapid ramping. Based on the diagnostic visit, a roadmap was developed to achieve flexible operation covering existing technical issues like improvement in flame detection, modification to address low back end temperature, design changes to enable TDBFP operations at low load, enabler actions like implementation of CMMs systems & capacity building for staff. As a first step the initial focus should be on reducing minimum load, with initiatives to improve ramp rate also done in parallel. Improving stop – start (2 shift) ability would be taken up as a future target, after successful delivery of the first two priority areas. The broad estimates for such a program would be in the range of $7-8 million/unit which shall be further refined based on trials and detailed cost-benefit analysis.

In addition to developing technical guidelines, the study will also provide recommendation on regulatory, policy & and market incentives which are needed to encourage & compensate power plant operators for investments needed to enable flexibilization measures.

Utility Driven Solar Roof Top (‘SRT’) Model for Domestic Households
080
Phani Bhushan Avula, Shanil NA
KPMG India, India

Government of India has set a Solar Roof Top (SRT) capacity target of 40 GW by 2022. While SRT installations in the industrial and commercial segments have gained momentum owing to cost benefit and attractiveness of this customer segment for developers/ financiers, traction for these installations in the residential segment remain low due to a variety of reasons including weak business models, customer aggregation challenges, multiple stakeholder involvement in obtaining consents and clearances, higher perceived default risk, lack of innovative financing mechanisms etc. In order to resolve these issues, it is imperative for the Utilities to support SRT installations for the residential segment. Key benefit for Utility shall be reduced subsidy burden on low end[1] domestic customers.

‘Utility driven solar rooftop pilot’ is one activities undertaken through the ‘Power Sector Reform (PSR)’ technical assistance programme undertaken by the Government of UK and Government of India. This activity aims to develop a model framework for a Utility driven SRT model targeting subsidized residential customers and implement a pilot scheme in one or two cities in Andhra Pradesh to demonstrate the concept and the model.

The proposed paper aims to present the one of its kind model developed for implementation by distribution utilities in India. The models includes the structure, risk mitigation meachnism and estimated savings etc.

Impact of Randomness of Wind Direction and Turbine Failure on Reliability Performance of Offshore Wind Farm
081
Angshu Plavan Nath, Zakir Rather
Indian Institute of Technology Bombay, India

With renewable sources like wind energy gaining traction in the energy market, the study of operational reliability of such sources warrants substantial importance. Despite it being environmentally friendly, wind energy, mainly because of its inherent stochastic nature brings critical challenges such as stability, reliability and power quality issues. With intermittent and variable nature of wind, integration of such generation sources introduces several challenges in secure and stable grid operation, with reliability of such generation resources being one of the major concerns. Therefore, this study aims to quantify impact of failure of Wind Turbines (WT) and randomness of wind, both in terms of velocity and direction, on the performance of wind farms.

The influence of wake effect is highly correlated to the distance between turbines in a given wind farm, with WTs placed closer together facing more pronounced wake effect than turbines placed further apart. On changing the direction of incoming wind, the distance between WTs, along the direction of wind changes, thus leading to a variable wake profile depending on the velocity and direction of wind. So, in order to generate a realistic scenario, both wind speed and wind direction needs to be considered in performance evaluation of wind farm.

Further, WTs may also face random failures, particularly in harsh offshore wind conditions. As, such in any particular time a turbine may be either operational or in an off state. Also, once a WT fails, it remains un-operational for a certain minimum downtime before it is operational again. During this period when the WT is un-operational, it also does not produce any wake on its downstream WTs. Turbine failure is greatly dependent on wind speeds, and under higher wind speed scenarios, probability of WT failure increases considerably. In this study, reliability indices such as Loss Of Load Percentage (LOLP), Expected Energy Not Supplied (EENS) and Expected Demand Not Supplied (EDNS) have been used.

Owing to the random nature of both wind unpredictability and the failure of WT, this study will estimate reliability of the wind farm considering wind direction, wind speed and random WT failure.

Economics of Battery Energy Storage Systems (BESS) – the US Energy Market Perspective
082
Vinay Gupta, Pramod Kumar Singh
ICF International, Inc., India

This paper aims to highlight the economics of Battery Energy Storage Systems (BESS) in the US energy market including an overview of different use cases and associated value. It discusses the market mechanisms for procurement and deployment of BESS. It further discusses what India can learn and adapt based on the experiences from the US power markets with high renewable penetration.

With increasing renewable penetration and retirement of baseload carbon intensive capacity, electrical grids are changing and require additional support to balance the grid. Due to decreasing cost and excellent operational flexibility, the BESS is increasingly seen as a viable alternative to support this transition. An alternative not only to thermal investments to maintain system reliability and to support renewable integration but also as a transmission and distribution (T&D) resource by avoiding or deferring the need for T&D projects. The value of BESS extends far beyond the ability to meet peak load (unlike gas peakers) as these systems can be dispatched year-round for energy arbitrage and ancillary services, and provide additional transmission benefits (though reverse-flow and ability to site in locations that would not support gas plant). BESS are unique at providing grid balancing and ancillary services, the requirement for which is increasing with increasing renewables. It can provide operational flexibility and benefit to thermal fleet and has zero or net negative emissions impact. In future, as renewable penetration is increasing, battery dispatch can increase the value and output of these resources.

The assessment of BESS project requires an understanding of all the value streams it can provide and not just the traditional energy and capacity value stream. FERC Order 841 requires that storage be eligible to provide all capacity, energy, and ancillary services that it is technically capable of providing. FERC acknowledges that optimal use of BESS to minimize consumer costs must be achieved through its use across multiple use cases. Additionally, Order 755 requires payment for actual performance delivered in regulation markets.

BESS projects across US are generally driven by utility mandates, but utilities are procuring BESS along with other sources through the completive bidding process instead of building on their own. This completive procurement along with continued development drives further cost decline. The BESS is becoming economic relative to peakers in some markets which provides a good value in energy arbitrage and ancillary services, along with the avoided T&D, capacity and environmental value. While there could be a variety of contracting structure, utilities in the western US typically contract BESS project under a tolling agreement where the buyer pays the seller a fixed capacity charge for its right to utilize the battery for contracted capacity, energy and/or other ancillary products, and variable operating expenses for energy dispatch.

Impact of Large Penetration of Distributed Energy Resources on Protection Schemes and Voltage Regulation of Conventional Distribution Network
083
Naveen Nagpal, Pankaj Mohan Kargeti, Sugandhita Wadhera, Abhishek Ranjan
BSES Rajdhani Power Ltd., India

With a target of 175 GW of Renewable Energy by 2022, which includes 40 GW of rooftop solar projects and with supporting Govt. policies and schemes, there has been rise in the installation of Rooftop Solar PV plants in Delhi and other cities across India. The mix of Distributed Energy Resources (DERs) is not limited to rooftop solar PV only but also other distributed generations such as Waste to Energy (WtE) plants. The current level of DERs include almost 45 MW with 1350 net-metered rooftop solar PV installations and few nos. of WtE plants in the BSES Rajdhani Power Limited (BRPL)’s network spanning across South and West of Delhi.

These DERs are mostly connected to the Low Voltage side of the network and scattered across the network with low or moderate levels of penetration with respect to the rated capacity (kVA) of the distribution transformer (DT).

DERs might help in improving the reliability of distribution network, however, the conventional network being designed for unidirectional power flow, it may also affect the proper operation of the system with large penetration of DERs.

With the rapidly increasing no. of DERs into the grid, we made a study of the existing protection schemes and categorized our study to review the need for necessary changes in existing protection schemes during normal as well as islanded conditions, short-circuit current contribution fault-ride through capability and voltage regulation.

This case study presents results after simulation of few DTs and their associated feeders with different levels PV penetration, with single or multiple consumers connected at the LT side of Distribution Transformer. Various solar PV penetrations at the DT are modeled considering the inverter to be operating at unity power factor to study the power flow in the network.

Necessary changes, if any, needs to be made in existing system may be inferred from the results, site measurements and observations.

Flexible Ramp Product Provision from Grid-Connected Energy Storage Systems
084
SUMANTH YAMUJALA, Anjali Jain, Partha Das, Rohit Bhakar, Jyotirmay Mathur, Priyanka Kushwaha
Malaviya National Institute of Technology Jaipur, India

Renewable energy sources are becoming cost effective and are presented as cleaner source of electricity generation. Increasing penetration of such intermittent resources may pose significant challenges in power system operations due to their variability and uncertainty. Steeper net load ramps or unexpected variations in RE generation may leave controllable units with insufficient generation and/or ramping incapability and create load-generation imbalances in real-time. This necessitates flexibility requirements in power systems. Many system operators have introduced market-based flexibility products to address the ramp requirements in realtime operations. This paper aims to model such market based flexible ramp product (FRP) from pumped hydro energy storage (PHES). A MILP based 15-minute temporal day-ahead security constrained unit commitment and 5-minute redispatch with the co-optimization of energy, reserve and FRP are formulated for the studies. Further, benefits associated with utilizing PHES for flexibility provision are analysed.

Effectiveness of proposed model is studied on IEEE RTS 24 bus test system using GAMS 24.2.3.

Thinking About and Beyond 100% Spot Energy Markets in India – Experiences from the US Energy Market Design
085
Vinay Gupta, Ashish Singla
ICF International, Inc., India

This paper aims to highlight the challenges and benefits from the proposed spot power market in India and what India can learn based on the experiences from different energy market structures in the US power markets. It provides an overview and discusses the experience from different energy market structure in the US, such energy only (ERCOT), energy plus separate capacity (PJM, ISO-NE), energy plus resource adequacy (CAISO).

As India proposes to move selling entire power through spot market, there are expected to be a range of challenges both technical and operational along with the expected system cost benefits. The idea of spot power is to lower the overall system costs by merit-based dispatch where the most economical and efficient plant take the first priority while meeting the security constraint economic dispatch guidelines. In the current regime, in many cases, costly generation is operating while some low-cost generation remains unutilized resulting in higher overall system cost. With the focus on 100% spot energy sales, there has to be thought given to the reliability as well. Will 100% spot market guarantee system reliability and if there is a need for separate reliability or capacity market or some changes to the spot marker construct?

In an oversupplied spot market, the efficient units typically set the power price and in most cases, those prices, especially with increasing renewable penetration, alone would not be sufficient to keep all the generators economic. Increasing renewable penetration will continue to put downward pressure on pressure. Therefore, overtime inefficient capacity retires and the system comes to an equilibrium. There are different ways to define equilibrium. In the US power markets, the primary measure of market equilibrium or reliability is reserve margin and is defined as the percent of excess resources above the system demand. The target reserve is based on loss of load expectation study and varies by region, but generally the North American Electric Reliability Corporation (NERC) reference level is 15% (15 percent higher resources than the peak load). Whenever the system is below the target reserve margin level, it is in need to new firm capacity (renewables are not firm) to maintain system reliability. While Inventory is expensive, but too little inventory is also expensive in terms of lost sales, customers and economic costs. Additionally, blackouts carry huge economic costs.

Spots market are volatile due to change in fuel price and capacity mix and if this market is not able to provide enough recovery to generators, then how will the market get a developer to build a new unit in such an environment and whether investors will be willing to finance such as asset? For any regulator, there are two competing priorities – keeping the customer cost low and maintaining system reliability, so the question really is what is the right way to compensate energy/capacity while meeting those two objectives?

REGIONAL ENERGY MARKET INTEGRATION IN SOUTH ASIA WITH a FOCUS ON vRE – PLANNING PERSPECTIVE
086
Suramya Dwivedi, Ravi Segal, Arun Unni
GE Energy Consulting, India

Efforts are underway to assess the way forward for integrating the South Asia Countries in a common energy market. To start, the focus would be on India, Bangladesh, Nepal, and Bhutan, since these countries are already connected to the Indian Power Grid, and also have diverse and complementary generation resources which could provide synergy in operations. In view of achieving the maximum economic and environmental benefits of integrating these countries as a common market, the planning process needs to be robust and all-inclusive, especially due to high vRE penetration expected in the region in the near future.

Any planning process intended to efficiently achieve the goal of regional market integration should start with the development of a comprehensive Regional Power Development Plan (RPDP), founded on the pillars of (i)determining the long-term generation requirements for the region and assessing the transmission and other related infrastructure requirements to support the regional operations, (ii)identification of the policy and regulatory provisions to govern the integrated market, (iii)formulating the payments and settlement methodology for the market participants under various categories, and (iv)facilitating in setting up Institutions responsible to carry out the market operations and settlements.

In line with the pillars of RPDP development, this paper provides an overview of the roadmap from a planning perspective for achieving the optimum benefit of integrating and operating the South Asia countries as a common energy market, starting with possible methods to design an integrated long-term generation plan considering the projections/requirements for each country, followed by the capacity assessment of intra-country and inter-country transmission lines to cater to the long-term market requirements.

A major focus area is to ensure that the RPDP is prepared in order to ensure that the maximum generation from vRE sources in the countries can be utilized, with sufficient conventional generation with necessary ramping capabilities is available to counter the variability of the vRE resources. To achieve this goal, this paper outlines a template of the RPDP preparation methodology, which needs to include aspects related to the generation capacity expansion planning over the long term to determine the capacity required to meet the demand at regional level as well as for individual country. The expansion planning provides inputs which would then be utilized in production simulations for individual countries and on a regional basis to determine the optimum operational methodology in terms of system costs. Another important analysis in this respect is regarding the system reliability in view of the high vRE penetration. Furthermore, the transmission capacity expansion requirements can also be ascertained through the same exercise on a regional operation basis, which would be in terms of the transient stability and/or frequency response analysis.

Stochastic Security Constrained Economic Dispatch for Primary Frequency Response Adequacy Under Uncertain Wind Generation
087
VIVEK PRAKASH1, Priyanka Kushwaha2, KAILASH CHAND SHARMA1, ROHIT BHAKAR2, HARPAL TIWARI2
1 BANASTHALI VIDYAPITH, India
2 MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY JAIPUR, India

The stochastic behaviour of modern generation systems poses a formidable challenge for System Operator (SO) to maintain generation-demand balance. This imbalance should be corrected within a short span of time otherwise, system frequency would vary from the nominal value. Large frequency variations due to contingency, like generation outage or loss of load, may cause serious threats to stability and security of the system. This necessitates a wider understanding of the research challenges arising out of large penetration of Renewable Energy Sources (RES) in the grid and requires evolving system technologies and modelling to maintain reliable and secure system operation. This research attempts to develop a mechanism for PFR adequacy with the large integration of uncertain wind generation sources. A novel stochastic security constrained economic dispatch framework is proposed for the assessment of role and value of available and required PFR mapped with frequency security criteria like Rate of Change of Frequency (ROCOF) and Frequency Nadir. This addresses multiple concerns associated with PFR adequacy such as comprehensive modeling of dynamic frequency evolution after contingency, uncertainty characterization, and representation in system operation.

Integrated Regional Solar PV Forecasting Method by Hybrid Method :Case Study of an Indian State
088
Aravindakshan Ramanan1, Naveen Kumaar2, Chris Alice Abraham2, Arindam Roy2, Barun Kumar2, Elena Barykina3, Hans Peter Waldl3, Felix Dierich3, Indradip Mitra1, Karthik Ramanathan2, Prasun Kumar Das2, Balaraman Kannan2
1 GIZ GmbH, India
2 NIWE, India
3 Overspeed GmbH, Germany

In India, cumulative power forecasts for the State Load Dispatch Centers are mandated under regulatory framework and accordingly, eleven Renewable Energy Management Centers are being established to implement RE forecasting activities. For the system operator, cumulative regional forecast of renewable energy generation is very important for maintaining the stability of grid. It will help them in scheduling the conventional generators accordingly and ensuring effective evacuation of renewable energy. In this work, 14 solar power plants across an Indian state taken as Reference Plants, ensuring geographical distribution of solar power plants across the state, for providing Day Ahead Forecast services. Based on these plants specific forecasts, a cumulative regional forecast model was developed.. The forecasts were done based on combination of both physical and statistical methods, using multiple sources of Numerical Weather Prediction models in the forecasts. Numerical Weather Prediction models from various sources ECMWF, GFS, NCMRWF (running the UK Met office model) were interpolated to 15 minutes from their original time resolution. Diffuse fraction, tilt conversion models, DC, AC power conversion models were employed with associated post processing steps to arrive at the solar power forecasts. Measured radiation data from the network of Solar Radiation Resource Assessment (SRRA) stations in the state were utilized in the model development. SRRA data was also used for bias correction of NWP forecasts. Various model optimizations were done in the model chain to improve the accuracy of forecasts. The forecast for the region was arrived based on adopting suitable upscaling technique for deriving the forecast for the entire state. Root Mean Square Errors of individual power plants were between 4 to 5 % when evaluated over a three month period. Detailed Accuracy measures for the individual power plants compared with the entire region were evaluated. Outcomes on the appropriateness of selection of reference power plants for regional forecasting were documented. Till now in India, the approach practiced was to forecast each plant and add them up for estimation at regional level. The concept of upscaling using few selected reference plants and arriving at the regional level is new in India. This study is the first attempt, following international practices, to approach regional level forecasting using upscaling technique. The initial results are promising and it is expected that such approach may soon become mainstream for future forecasting activities in India.

VALUE ASSESSMENT OF ENERGY STORAGE IN HYBRID RENEWABLE PROJECTS
089
Rushikesh Deshpande, Ravi Segal, Arun Unni, Partha Deb
GE Energy Consulting, India

Wind and Solar PV (SPV) projects which were developed and operated on standalone basis normally have low capacity utilization due to seasonal and daily variations of the resource. In India, wind and SPV generation outputs complement each other and thus a wind solar hybrid plant’s output has a much higher capacity utilization over a period. Addition of Battery Energy Storage System (BESS) further augments benefits achieved out of co-locating wind and SPV plants. There are several advantages of developing Wind, SPV and BESS hybrid projects to the ‘Operating Utility’ and the ‘Developer’ as well. Transmission infrastructure optimization, lower project development costs, distributed O&M and security costs, frequency support to grid, better RE forecasting and reduction of ramping requirements from coal plants are some of the advantages that hybrid projects offer. BESS have numerous applications at different levels viz. generation, transmission, distribution and at a customer site. At generation level, BESS may be used for power or an energy application which is characterized by the duration of discharge. Primary frequency response, spinning and non-spinning reserves, energy arbitrage, avoiding RE curtailment, RE plant output firming and black start capability are few examples of BESS application on generation side.

This paper discusses the financial evaluation methodology and business cases for BESS at generation level for Wind, SPV and BESS hybrid project located at in the state of Andhra Pradesh, India. It describes a relevant portion of a larger study completed in April 2016. Business cases are developed for each of the BESS’s applications viz. reducing penalty on account of Deviation Settlement Mechanism (DSM), Peak shifting and RE forecasting error impact reduction (RE plant firming). BESS is designed (technology and rating) for each application and generates annual revenue stream depending on the application considered. The evaluation is based on the Levelized Cost of Electricity (LCoE) and a benchmark level of Equity IRR (EIRR). Considering higher costs of BESS in year 2016, Viability Gap Funding (VGF) requirement were computed for each of the business cases where EIRR was less than 16%. In addition to VGF, Generation Based Incentives (GBI) and Subsidy requirements were also computed as a tool to make a project feasible option. It is observed that, the LCoE of BESS is very high on standalone basis however when considered in combination with Wind and SPV, overall project LCoE is reasonable. BESS application of DSM and peak shifting are feasible however for 16% EIRR there was a requirement of VGF support in first two phases of project. RE forecasting error reduction application is attractive if forecasting error is more than 15%. For current levels of forecasting errors, IRR was not found attractive. Finally, business models are re-run and results are re-computed with estimated current levels of capital and operating costs for the BESS system.

DAY AHEAD SOLAR PV POWER FORECASTING BASED ON a COMBINATION OF STATISTICAL AND PHYSICAL MODELLING UTILIZING NWP DATA FOR SOLAR PARKS IN INDIA
091
Arindam Roy2, Aravindakshan Ramanan1, Barun Kumar2, Naveen Kumaar2, Chris Alice Abraham2, Anette Hammer4, Elena Barykina3, Detlev Heinemann4, Hans Peter Waldl3, Indradip Mitra1, Prasun Kumar Das2, Karthik Ramanathan2, Balaraman Kannan2
1 GIZ GmbH, India
2 NIWE, India
3 Overspeed GmbH, Germany
4 University of Oldenburg, Germany

This paper attempts to develop appropriate models for solar power prediction for large MW scale Solar PV park in India. The. The present research attempts to develop solar power prediction of large MW scale PV plant in India with hybrid approach of physical and statistical models. The objective of the exercise is to develop day ahead forecasts of 15 minutes temporal resolution and meet the current regulatory requirements in India mandated by Central Electricity Regulatory Commission. The hybrid method considers physical model supported by Numerical Weather Prediction (NWP) data sets and plant specific measurement of irradiation along with Artificial Neural Network and other statistical techniques for bias correction of irradiance and AC power. As input data is critical in physical model, an appropriate filtering techniques on data quality has been carried out. As the Numerical Weather Prediction from ECMWF is available for every 3 hours, necessary post processing to interpolate it to 15 minutes time resolution has been carried out. Ground based irradiation measurements was utilized for site specific bias correction. In bias correction function, historically evaluated difference between forecasts from NWP and measured radiation is modelled as a function. The present approach considers Chandrasekhar Diffuse fraction model coupled with Klucher model to convert from irradiation on horizontal plane to panel tilt. For estimation of DC power output from solar PV panel, Huld model is considered. Inverter characteristics are modelled using Schmidt Sauer model. These models are tested for various NWP data sets and their statistical combination. The results are validated against actual power output from plant and analysed in the form of NRMSE, NMAE for each 15 minutes time block. It is observed that accuracy of the model is directly dependant on availability of detailed information and data from the plant. The proposed approach provides the forecast accuracy to the extent of 95 % with NRMSE of 5 %. It is also seen that forecasting in general is within the deviation limits prescribed by regulatory authorities.

Two-Stage Voltage Control of Active Distribution System Using Short-Term Solar and Load Forecasting
093
Chaman Lal Dewangan, Saikat Chakrabarti, S. N. Singh
Indian Institute of Technology Kanpur, India

Solar photovoltaic (PV) penetration in the distribution system is increasing day by day due to rising energy demand and growing concerns about climate change. The voltage rise in the network is a common problem due to high solar PV installation. The voltage control devices such as on-load tap changers (OLTC) and capacitor banks (CB) operate more frequently to keep the voltage within the permissible limit.

The advanced solar inverter can inject or absorb reactive power to maintain the voltage security of the system. It can respond in microseconds, which help in managing distribution bus voltage during some load change or uncertainty in forecasting of load and solar. OLTC and CB are slow devices. Therefore, the need for proper coordination of slow and fast voltage-controlling devices.

Two-stage control strategies are present in the literature, in which first stage OLTC and CB are dispatched using solar, and load forecasting as input to manage the stochastic nature of solar and load. Second stage solar inverters operate according to the real time situation of solar power and load.

In this work, two-stage voltage control of the distribution system is analysed using forecasting of different time horizons such as 15, 30, 45, and 60 minutes. The time horizon is the interval for which OLTC and CB are dispatched. The study analyses the effect of time horizon of forecasting on voltage violations, number of OLTC taps and CB switching.

The voltage rise problem for different penetration levels of solar power such as 20, 40, and 60 percentage with respect to peak load in the medium voltage distribution system are studied and solved.

Intra-City Electric Car Fleet Charging Solutions Using Renewable Energy Resources for Power Generation
096
Ameya Ulhas Ghodke, Agrim Rattan, Pramod Singh, Rakesh Maurya
ICF International, India

India’s mobility sector is undergoing a transition towards a cleaner future. Currently the transport sector has the highest oil consumption (47%) and contributes to 11% in the country’s GHG emission. The transition towards electric vehicles will not only substantially aid to energy and climate security, it will also drastically improve the air quality. With the announcement of FAME – 2 and EV policies by several states, recent years have witnessed a major policy push sector is getting the right policy push, both at the central and state level.

The policies have mainly addressed the manufacturing side and the customer incentive part. An important component which has not been adequately addressed is the building of the charging infrastructure. While the uncertainty around whether charging business will be considered as a sale of electricity has been cleared by the ministry of power, the siting of charging stations remains a bigger question. Also, the whole story of electric vehicles being an environmentally benign solution will go for a toss if the vehicles are not charged with a greater share of renewable electricity. In order to keep the EV ecosystem clean, it is necessary to charge EVs with power generated by the renewable energy sources, preferably solar PV or wind energy systems.

In this paper, we are trying to provide an EV charging solution for the intra-city shared car fleets. These fleets are assumed to have a fixed driving pattern throughout the day. A fleet of 10 electric cars would create approximately 1MWh of electricity demand throughout the day. As the number of EVs increase, the demand will increase which would need to be managed properly to avoid overloading the grid. Various charging periods are considered for charging the EVs, as typically more than one battery cycles are consumed by the cars per day. According to the vehicle driving patterns and EV demand, charging station locations are decided.

For EV charging, plug-in charging and battery swapping models are considered and power system implications of both the models are provided. Three power system integration solutions are provided. Adoption of the banking of energy model with a captive solar PV or wind power plant exclusively built for providing power to charging stations. State like Delhi have modified the regulations on open access power transmission from captive power plants to the various EV charging stations. A fleet of 100 cars would generate around 1.76 MW demand over the EV charging time period.

A concept of providing power through a virtual power plant (VPP) has been considered as a future commercial or policy option. In the VPP power delivery concept, power from existing rooftop solar PV systems from C&I entities is aggregated to provide power to charging stations. These solutions will have zero CO2 emissions, drastically reducing the carbon footprint of the entire transportation sector as well as the power system in some manner.

A Novel Intelligent MPPT Technique for Three Phase Grid Connected SPV System
097
Pawan Kumar Pathak1, Parvez Ahmad Alvi2, Anil Kumar Yadav3, VIVEK PRAKASH4
1 Banasthali Vidyapith, India
2 Banasthali Vidyapith, India
3 NIT Hamirpur, India
4 Banasthali Vidyapith, India

Traditionally, electricity was generated through conventional sources of energy, but the industrialization and modernization subjected the conventional grid under pressure leading to power crunch throughout the globe. This energy crisis gave rise to a new paradigm of sustainable development and green technology leading to tremendous research in the field of solar and wind as renewable energy sources (RES). This transit in power generation technology imposes few challenges of RES being stochastic in nature, a system with reduced efficacy and higher operational cost. Operation of an SPV array at the maximum power point (MPP) leads to the extraction of maximized power but due to the non linear characteristic of P-V and I-V curve in conjunction with factors such as system array configuration, environmental temperature, solar insolation, dust, debris, shading, and tilts adversely affects the extraction of maximum obtainable power thereby reducing system efficacy. Low conversion efficacy of an SPV system of around 7-19% proves to be a major challenge and area of concern. This necessitates designing of a strong and effective maximum power point tracking (MPPT) algorithm which will not only optimize the obtainable power from SPV system but also enhance the life of the system. DC-DC power converter acts as an inter-link between SPV system and load facilitating in the tracking of MPP by varying the load according to the duty ratio besides enhancing the array. The paper proposes a novel intelligent fuzzy logic based discrete proportional-integral-derivative (FL-DPID) MPPT technique for a two-stage three-phase grid-tied SPV system under uniform solar irradiance at 25℃. The proposed MPPT technique is based on nine rules which reduce the computational complexity and implementation cost overcoming the drawback of classical fuzzy logic based MPPT technique. When compared with classical perturb and observe (P&O) technique FL-DPID proves to be a robust technique with higher efficiency, tracking speed and negligible oscillation around MPP. Negligible oscillation around MPP reduces ripple content in output parameters of SPV array thereby reducing power loss and enhancing conversion efficacy besides increasing the life of the system. Voltage source inverter acts as an interlink between the generation side and utility. Proper synchronization between grid voltage and inverter current is carried out through a phase locked loop based on input’s quadrature method. The entire grid side work is carried out at unity power factor operation with inverter injecting real component of power to the grid. The prime parameter monitored at grid side is the quality of the current injected in it with total harmonic distortion (THD) being within the limits specified by IEEE 929-2000.

A Comparative Study of Short-Term Wind Speed Forecasting Models
098
ARCHITA VIJAYVARGIA1, KAILASH CHAND SHARMA2, ROHIT BHAKAR1
1 CENTRE FOR ENERGY AND ENVIRONMENT, MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR, RAJASTHAN, India
2 SCHOOL OF AUTOMATION, BANASTHALI VIDYAPITH, RAJASTHAN, India

The increasing trend to integrate intermittent wind generation in restructured power systems introduces several operational issues including reserve management and market performance. Therefore, Very Short-Term Forecasting (VSTF) of wind speeds is highly emphasized to address these issues by accurate predication of Wind Farms’ (WFs) power outputs. State-of-the-art of VSTF typically provides a trade-off between machine learning and time series techniques. This paper provides an exhaustive study of statistical and machine learning VSTF models, i.e., linear regression, Autoregressive Integrated Moving Average (ARIMA), k-Nearest Neighbors (k-NN) and Artificial Neural Network (ANN). The performance of these models is evaluated by Root Mean Square Error (RMSE) and Mean Absolute Error (MAE). The study is carried out on the dataset of WF located at Jaisalmer, Rajasthan, India. The results obtained concludes that ANN outperform for VSTF of wind speed because of its ability to form complex non-linear systems for forecasting based on simple wind speed data. The ANN forecast accuracy is followed by linear regression, ARIMA and k-NN models.

SHORT-TERM WIND SPEED FORECASTING
099
ARCHITA VIJAYVARGIA1, KAILASH CHAND SHARMA2, ROHIT BHAKAR1
1 CENTRE FOR ENERGY AND ENVIRONMENT, MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR, RAJASTHAN, India
2 SCHOOL OF AUTOMATION, BANASTHALI VIDYAPITH, RAJASTHAN, India

Government of India has set a very ambitious goal to install 175GW of Renewable Energy generation capacity by 2022, resulting in all round efforts towards grid integration of RES. In this, wind power is gaining popularity due to its technological maturity, good infrastructure and cost competitiveness. However, grid integration of wind power can impact the power system due to the stochastic nature of wind resources. Intermittent nature of wind power creates uncertainty for grid operation. This creates system security and stability challenges. Efficient wind power forecasting (WPF) is required for integration of wind power to the grid. WPF implies an estimation of the expected production of one or more wind turbines shortly. This work concentrates on the use of Statistical approach, for predicting short term wind speed.

Jaisalmer wind farm data is used as input dataset to the forecast models of short-term time-scale. The data was collected for every 10 minutes’ basis with a mean wind speed of 8.1166 m/sec. Few entries of the data are selected as training data set and the next ten entries of the same data are considered as test set. The test set is then compared with the forecasted values obtained by various wind forecasting models and the Root Mean Square Error (RMSE) is obtained.

Statistical approach uses a vast amount of historical data for training the forecast model. These approaches are either based on Time-Series (TS) approach or Machine Learning (ML) approach. Mathematical TS models like univariate Autoregressive Integrated Moving Average (ARIMA) method is a good option for short-term forecasts of wind speed/power. ARIMA model filters out the useful signal from noise. But the forecast accuracy is limited if relying only on the onsite information and that too using only mathematical statistics. The RMSE for ARIMA model is 0.834 m/sec.

Different biological system based ML algorithms have been used in this includes Artificial Neural Network (ANN), k-Nearest Neighbours (k-NN) and Linear Regression (LR) to forecast the wind speed. LR is a linear approach to model the relationship between a scalar response and one or more explanatory variable. It is quite similar to ARIMA model in accuracy as well, having RMSE of 0.83 m/sec. k-NN is a simple algorithm that stores all available cases and predict the numerical target based on a similarity measure of ‘k’ neighbours. As there is no surety that any particular machine learning algorithm will always work in every case (dataset) imaginable, so, the accuracy for k-NN is less with RMSE of 0.92 m/sec. The results are found much better in case of ANN model. The RMSE has reduced to 0.472 m/sec. This is because in ANN, the relationship between inputs and outputs are known by a non-statistical approach. Neural networks can easily learn from the input and output mapping during the training phase. This work concludes that machine learning based ANN model best suits the forecast scenario out of all taken models.

Analysis on Control Architectures and Challenges in Control of Large Offshore Wind Power Plant Clusters
100
Anup Kavimandan, Kaushik Das, Anca Daniela Hansen, Nicolaos Antonio Cutululis
Department of Wind Energy Technical University of Denmark Risø, 4000 Roskilde, Denmark, Denmark

The control of large-scale offshore wind power plants (OWPPs) has historically been handled by separating the control into different hierarchical levels A wind power plant (WPP) control is traditionally implemented as a centralized processing unit, which prepares and sends power set points signals to each individual wind turbine (WT) control, based on power measurements in the point of common coupling, WTs status feedback signals and system operator demands, depending on the actual grid status. This is commonly known as a centralized control scheme, implemented in conventional networks. In case of large-scale OWPP clusters with hundreds of wind turbines (WTs), the centralized control scheme may be impractical owing to the huge computation burden in order to process the large volume of information.

This paper describes the need to breakdown the control problem into manageable sub-problems, possibly weakly related, such that the overall plant is no longer controlled by a single controller, but by several independent controllers. Thus, instead of having a fast powerful computer centralizing the control of the entire WPP cluster, the control responsibility can be shared among the various local control units. Two additional control architectures besides centralized control scheme could be therefore used: distributed and decentralized control. A comparison between these different control schemes is performed and described in the paper based on the performance of different control architectures for large OWPP clusters and a suitable architecture is proposed for the same.

Additionally, the paper also highlights the challenges associated with the hierarchical and coordinated control of large OWPP clusters. The control of an OWPP cluster consists of many control layers that have to be controlled using ‘supervisory’ control. In the absence of a supervisory control, the control layers may act in a conflicting manner and interplay against each other. An OWPP cluster has to access extensive information from the controllers of the individual WPPs and wind turbines. Some of the possible communication issues that might appear during the operation of the OWPP cluster are inherent latency/delays, data packet drops or communication link failures. The delays can further slow down the response of the controller.

The existing wind power plant control architectures based on traditional centralized control offers certain limitations as it could compromise the system reliability as all the information flow is channelized to a single control processing unit. This could be overcome with the control architectures based on decentralized and distributed control, described in the paper, as they avoid the need to install very high speed processing units, but also improve the sytem reliability. The architectures are, therefore, designed to provide a reliable control performance while considering the challenges offered by the control of a large OWPP cluster.

Study and Design 10 KW Rooftop Solar Photovoltaic System Special Reference to Suncity Jodhpur (RAJASTHAN)
101
Ashish Mathur1, VIVEK PRAKASH2
1 Banasthali Vidyapith, India
2 Banasthali Vidyapith, India

Renewable energy sources (RES) are the best alternative to meet the requirement of increasing energy demand. In India, RES is abundant and generation share from these sources has shown tremendous growth in the recent year. Now a days, about 33% of India's primary energy consumptions is full fill by RES. In the last two and half decades, there has been a vigorous pursuit of activities relating to research, development, demonstration, production and application of a variety of RES technologies for use in different sectors. The objective of this work is to estimate the potential of grid quality solar photovoltaic power in Jodhpur district of Rajasthan and finally develops a system based on the potential estimations made for a chosen area of 100m² (1076.4sq.ft.). Equipment specifications are provided based on the availability of the components in India. Moreover, the cost estimation of grid-connected SPV power plant is discussed to show economic viability.

Evaluating Battery Storage in High Renewable Energy Scenarios in India
102
Ranjit Deshmukh1, Ana Mileva2, Ashwin Gambhir3, Srihari Dukkipati3, Shantanu Dixit3
1 University of California Santa Barbara, United States
2 Blue Marble Analytics, United States
3 Prayas Energy Group, India

Declining costs of Lithium-based batteries can enable grid-scale storage to provide peaking capacity and energy balancing services, especially to systems with high variable renewable energy shares. Using a new capacity expansion model with high spatial and temporal resolution, we examine cost-optimal investments in generation and storage capacity for high renewable energy scenarios in India. While energy generation from both wind and solar photovoltaic technologies is becoming increasingly cost-competitive with India's traditionally dominant coal-based generation, low-cost battery storage will be key to a cost-effective transition towards deep decarbonization.

Assessment of Influence of Price Uncertainty Modelling on Wind Power Producers Bidding Strategy
103
Swati Gupta1, KAILASH CHAND SHARMA1, Vivek Prakash1, ROHIT BHAKAR2
1 Banasthali Vidyapith, India
2 Malaviya National Institute of Technology Jaipur, India

This paper presents a game theoretic bidding strategy approach is proposed for the assessment of bidding strategy of WPPs in a uniform price based day-ahead oligopolistic electricity market considering rival behavior. Strategic interaction between WPPs is modeled through stochastic Cournot model. Wind power uncertainty is represented through scenarios, which are generated and reduced using scenario generation & reduction algorithms. Payoff of each WPP is calculated considering market clearing price (MCP) and imbalance charges obtained using inverse demand curve and imbalance price mechanisms, respectively. Single and dual imbalance price mechanisms are used in the evolving electricity markets. Nash equilibrium is the solution of the proposed approach that provides optimal bids for strategic WPPs considering rival behavior. The proposed approach is illustrated through a practical case study of WPPs. The influence of the different type of imbalance price mechanisms and increasing wind power penetration on WPPs’ profit is analyzed.

Initial Insights from Modelling the MSEDCL Power System for 2029-30 - a Production Cost Simulation Exercise
105
Srihari Dukkipati, Shantanu Dixit, Ashwin Gambhir, Ashwini Chitnis
Prayas (Energy Group), India

The power sector in India is in a state of flux. Some of the reasons for the flux are global phenomena such as reducing RE and storage prices and advances in smart grid infrastructure, while others are specific to the policy and regulatory environment in India such as the move to universal access to electricity, migration of large consumers to open access and captive options, stranded generation capacity and financial situation of distribution companies. These changes have significant implications for generation and transmission capacity planning, regulations and grid operations. However, there is considerable uncertainty in how these changes will pan out over time since a lot of factors that affect these changes are beyond the control of system planners. In this context, appropriately set up power sector models provide significant insights that can help formulate better strategies and make more informed decisions. We describe a production cost simulation model for the state of Maharashtra for the year 2029-30, and illustrate some initial insights that are relevant for electricity planners, distribution utilities, regulators and system operators in Maharashtra as well as the rest of India.

The Impact of Policy Decisions on the Indian Electricity System in 2040: A Model-Based Analysis.
106
Bewin Tom
Ea Energy Analyses, Denmark

Based on a power system model, this paper studies how different policy decision evolve the future Indian electricity system of the year 2040. As of 2017, fossil fuels provided 80% of the electricity generation in India and there is a critical concern of increasing emissions in the future with steady increase in demand. To overcome this concern, the Indian Government promotes the greening of the electricity system by setting renewable energy addition targets and other favourable policies. This paper mainly focuses on the long-term goal set in the draft national energy policy 2017, aiming 36% renewable energy in the power generation mix in 2040.

The paper studies the current India electricity system, and the Government plans related to its future. Using the collected data, the electricity system is modelled in the simulation software called ‘BALMOREL’ and scenarios expressing the stated policy and different levels of climate policies in the Indian electricity system of 2040 are simulated. The developed model includes the latest and detailed representation of the Indian power system.

The paper studies four scenarios. Stated Policy Scenario studies how the Indian electricity system develops under the stated policies of the Government. The ‘Carbon Price Scenario’ analyses the effect of the introduction of a price on CO2 emissions on the renewable energy contribution in the power system. The ‘2 C Scenario’ shows a cost-effective way for the evolution of the Indian power system in 2040 to achieve the above long-term Paris goal of 2°C by 2100.

The main results of this study are as follows. By 2040, the Government target of having a share of 36% renewable energy in the generation mix can be achieved with negligible curtailment. The cost-optimal capacity of solar and wind power required to achieve 36% RE share are 256 GW and 204 GW respectively. Pump storage and Hydropower with reservoirs are the main sources of flexibility in the system. Emissions from the power system increase to 1817 Mt CO2 by 2040 due to the increase in the coal power generation to meet the increased electricity demand.

RE contribution to the generation mix in 2040 will be only 21% if RE growth is promoted by market forces alone without any government interventions. Introduction of 35$/ton CO2 carbon tax reduced the power sector CO2 emission level in 2040 to 750 Mt, a reduction of 60% compared to Stated Policy scenario. RE share in generation mix increases to 48% with the introduction of the carbon tax. With the increased RE share of 48% causes curtailment of the RE power. 1.1 % of wind and 0.03% of solar power are curtailed. A cost optimum way to achieve a power sector in 2040 adhering to the long-term Paris goal of keeping the temperature rise below 2 °C by 2100 is to reduce the coal generation to 14% share, nuclear providing 21%, hydro 16% and RE 46%. An introduction of a carbon tax of 39$/ton CO2 by 2040 as policy measure could also help the Indian power system to adhere 2 °C goal.

Roadmap for a Flexible, Low Carbon Indian Electricity System
107
Brendan Pierpont, Saarthak Khurana, David Nelson
Climate Policy Initiative, United Kingdom

India can integrate high capacities of wind and solar generation, 390GW by 2030, well exceeding policy targets without raising costs. However, this will only be possible with concerted action and investment to make India’s electricity system more flexible.

As variable wind and solar power continue their rapid growth in India, flexibility needs – including reserves that help balance supply and demand in real-time, resources that can ramp up output quickly, resources that can shift energy production or consumption across the day, and seasonal generation capacity – will grow 2-3 times faster than electricity demand overall. However, these growing flexibility needs can be met cost-effectively using a combination of investment, incentives and technologies that:

  • Change how and when consumers use energy,
  • Increase the flexibility of power generation, and
  • Encourage development of new energy storage options.

Ample technology and system concepts exist to create the flexibility required to build and operate a reliable, low cost, low carbon system, but implementation of a more flexible system is among the biggest challenges facing the energy transition in India. We find that a mixed portfolio of flexibility options – one that balances the unique advantages of demand flexibility, energy storage and conventional power plants – is the lowest-cost approach to solving flexibility needs, over 5% less expensive than relying on flexibility from thermal power plants alone. A portfolio approach is also the pathway with the least risk of failure, as it limits reliance on a single technology. Developing this portfolio, however, will require policymakers and decision-makers to address a range of challenges faced by the sector. These include:

  • The need for better data and information to characterize flexibility needs and opportunities;
  • Incentives and markets to reveal the value of flexibility and guide flexibility investments;
  • Technology development to build domestic industries around new flexibility options and reduce costs;
  • Infrastructure such as transmission, distribution, metering and information technology; and
  • The need to overcome barriers to finance and investment, behavioral change and institutionalized practices.

By drawing on these strategies for making both electricity supply and electricity demand more flexible, India can achieve these higher levels of clean energy, creating a modern, low cost energy system, while reducing carbon emissions.

Flexible Solar Power: Unlocking Solar’s Full Potential
108
Mahesh Morjaria
First Solar, United States

India has already embarked on an ambitious program to significantly increase the proportion of solar energy on their grid. Solar is a variable renewable energy resource (VRE) that requires additional power system flexibility to balance the grid especially under higher penetration of VRE. Solar power plants can be operated flexibly to address this operating challenge. In this paper we describe a simulation study conducted for a relatively small utility system that quantifies the value of this solar flexibility. The study finds that once solar penetration exceeds 14% of annual energy supply, the operating reserves needed to accommodate solar uncertainty necessitates increased solar curtailment to avoid oversupply during low demand periods. As the penetration continues to grow, flexible solar reduces uncertainty, enables leaner operations and provides significant economic value. At penetration levels exceeding 20%, by operating solar in a fully flexible manner solar curtailment is reduced by more than half. This creates significant additional value resulting from reduced fuel costs, operations and maintenance costs, and air emissions.

Storing Energy at Sea
109
Bernhard Ernst, Matthias Puchta, Christian Dick, Fabian Thalemann, Jochen Bard
Fraunhofer IEE Königstor 59 34119 Kassel, Germany

For the transformation of the electricity system to a renewable energy system it will be necessary to expand the grid and to increase the storage capacities. Pumped hydro energy storage systems are currently and will be the dominant storage technology to store surplus energy in the future. A major challenge for the further expansion of conventional pumped hydro energy systems on land is the identification of suitable and conflict-free locations. The development of an offshore pumped hydro storage concept, which was tested for the first time at the Fraunhofer Institute for Energy Economics and Energy Systems technology IEE (former IWES Kassel) in the project StEnSEA (Storing Energy at sea), could enable the use of new locations at sea. The main requirement for this new technology is a sufficient depth of water at a small distance to the shore. Based on a feasibility study, the StEnSEA project carried out a detailed system analysis with the development of the design, construction and logistics concept. Additionally the pump turbine unit itself and its integration into the storage system has been investigated. Furthermore the integration into the electricity network has been analyzed and a techno-economic assessment has been carried out to develop a roadmap for the technical implementation of the novel offshore storage systems. A major part of the project was the installation of a prototype in scale 1:10, which was successfully tested in the winter of 2016 in Lake Constance. Apart from the huge worldwide potential, another main advantage of the offshore pumped hydro storage system is that the power of the system can be adjusted by the number of units installed in a plant. This enables various operating concepts for the application of the offshore pumped hydro storage system, which could cause this new technology to be an important part of the future energy supply.

Keywords: Energy Storage, Pumped Hydro, integration of VG

Impact of PV Systems and Battery Storage in Hybrid Power Systems with Grid Connection
112
T Adefarati1, P S Kopa1, R C Bansal2, H D Mathur3, D Mishra3
1 University of Pretoria, South Africa
2 University of Sharjah, United Arab Emirates
3 BITS Pilani, India

Hybrid system is a form of distributed generation technology that is located very close to the consumers and operates optimally with the utility grid to provide a sustainable power solution at the load points. The hybrid system is signed by independent power providers to harnesses energy from numerous renewable energy technologies and provides storage capabilities with the application of battery system. The power solution power solution provides by the hybrid system is cost-effective and efficient as well as improves the entire system capacity, security and reliability. Solar or wind power alone can fluctuate, but the perfect solution is to combine two or more forms of energy sources to provide a reliable source of energy. The stochastic nature of renewable energy sources has instrumented to a choice of multiple configurations with diverse generation technologies and battery system for sustainable power solution. Hybrid system is required to ensure reliability of power system and for peak shaving applications, improving the voltage level or connecting isolated areas that are far from the utility grid. This paper will show the modeling of a PV system from solar panels, DC-DC converter, inverter and until the system is grid connected to feeder X to improve the voltage levels of this feeder as it has low voltages, the circuit will be modeled on PSIM and Power factory software.

Electricity Scheduling for Residential Prosumers with Demand Response
115
Falti Teotia1, Parul Mathuria2, Rohit Bhakar1
1 Centre for Energy & Environment, Malaviya National Institute of Technology, India
2 Department of Electrical Engineering, National Institute of Technology Warangal, India

The advent of smart grid provided ample opportunities for consumers to adopt small-scale renewable energy generation and become prosumers. In addition to this, advancement in information, communication and control technologies has equipped prosumers with smart home appliances. To extract energy saving and lesser cost of electricity, residential prosumers perform energy management in accordance with renewable energy generation, energy storage, responsive appliances, and electricity price. This requires optimal scheduling of prosumer demand with their operational preferences of appliances in order to perform energy saving. In this regard, this paper proposes a novel optimization based control of different (characteristics) appliances to schedule electricity for residential prosumers. Prosumer demand preferences for appliances are considered with operational constraints of appliances. Time-of-use tariff and dayahead real time pricing is used for electricity scheduling and its impact is assessed. To increase the energy efficiency and the accuracy of the required results, scheduling time horizon of 24 h is divided into 144 small time slots, each of 10 min duration. The simulation results show the reduction in the cost of electricity and attainment of the highest possible satisfaction level of prosumers.

Making Grid Future Ready for RE Generation Indian Prespective
116
Deepak Kumar Saxena
CIGRE, India

With increasing RE generation getting into the grid the behavior and response of grid is going to be changed. The present grids have RE percentage of 10% which is going to be 30% by year 2022.

The RE Generation is stiffer from dynamic and transient response point of view. Also RE being inform power and directly proportional to environment and atmosphere conditions.

As the percentage of RE will increase the fault level at grid will change. The behavior of power electronics is different from rotating machines. The electromagnetic behavior is different and together there will be a great impact on the grid inertia with increasing RE generation.

Another major change which is happening is the distribution feeders will start behaving like supply feeders for some part of the day and consumer of power for balance period of the day. The system needs to be made suitable for bidirectional power flow.

The paper discuses all the above issues and preparedness for change in grid codes and practices for making grid future ready.

Impact of Renewable Energy Availability on Load Serving Entity’s Sale Price and Procurement Decisions
117
Sandeep Chawda1, Parul Mathuria2, Rohit Bhakar1
1 Electrical Engineering Department, Malaviya National Institute of Technology, Jaipur, India
2 Centre for Energy and Environment, National Institute of Technology Jaipur, India

Intermittent and uncertain generation characteristics of renewable energy sources (RES) impacts decision-making problem of load serving entity (LSE). LSE makes procurement and dynamic sale price decisions well in advance to maximize its profit. It procures energy from available RES generation along with wholesale electricity market (WEM) and bilateral contracts. WEM market price uncertainty introduces volatility in procurement cost that makes LSE’s profit risky. Therefore, LSE determines a trade-off between profit and risk. In this perspective, this paper put forwards an exposition of energy procurement strategy and dynamic sale price setting for RES penetration, with consideration of WEM price uncertainty. LSE’s risk aversion is modeled by mean-variance technique, to obtain the trade-off between profit and risk. Case study is conducted to highlight impact of RES availability on LSE’s sale price and procurement decisions. Simulation results show that during RES generation availability, LSE offers lower sale prices and would result in consumer demand shift within these hours. This strategy would enhance RES utilization.

Need of Solar Energy in Indian Climate Load to Balance Energy Ecosystem
118
Nimai Sundar Manna1, Sankar Karan2, Rajib Das3, Binoy Krishna Choudhury4
1 Calcutta University, India
2 Indian Statistical Institute, India
3 CESC Ltd, India
4 Indian Institute of Social Welfare & Business Management (IISWBM), India

Energy demand in India will increase by a factor of 1.5 to 2.5 by 2030 and minimum energy consumption of 2.3 toe/year/capita is needed today to achieve Human Development Index (HDI) of 0.9 where Less than 10% of the potential solar energy is utilized till date, and as per estimates, the demand for air-conditioning units has increased from about 25 million units (MU) in 1998 to more than 40 MU in 2006 and about 115370 GWh of electricity was used in India to meet the air-condition and cooling demand in the country in 2010-2011 and it is projected to increase by 40% in urban India and 21% in rural India by the year 2017. This is causing tremendous pressure on energy security and environment. The demand for energy to meet the weather component of load can be addressed by harvesting the clean energy, the solar energy which in turn can mitigate the climate change and carbon emission issues. A realistic assessment of utilization potential of solar energy has been carried out in the city of Kolkata, India where it has been found that consumption of electricity is directly related to the ambient temperature, and have higher correlation coefficient with ‘feel like temperature’ as because the latter takes care of relative humidity also of climate condition. As the mean average temperature is increasing as per climatology data of last 100 years therefore the cooling demand is also rocketing high day by day. The energy required to meet this cooling demand can be adjusted by the potential solar energy generation capacity of the city. A comprehensive study on weather load component of electricity consumption in an urban city (like Kolkata, India) concludes the requirement of alternative sustainable energy source. On study we concentrate on requirement of solar energy based on DNI and availability of rooftop open space for solar irradiance in the city area, gives better result in terms of energy security and sustainability.

The present paper introduces the concept of estimating the cooling demand vis-a-vis PV generation using ‘feel like’ temperature and ambient temperature as independent variables respectively, using an algorithm in Winter Prediction Model. Again as ‘feel like’ temperature and ambient temperature are related through relative humidity, and ambient temperature has positive correlation coefficient with both cooling demand and SPV generation, the result shows and help measurement of stability of large scale grid integration in certain geographical areas. Thus, introduction of either SPV power generation or solar thermal cooling (to balance the ‘in parity’ cooling load) has been found to balance the energy ecosystem.

Efficient and Cheap Sun Tracking Solar Panel
120
Ranjit Singh1, 2, P Sairam3
1 Assistant Professor, Guru Nanak Institutions Technical Campus, India
2 Research Scholar, Dr. M.G.R Educational & Research Institute, Chennai, India
3 Student, Guru Nanak Institutions Technical Campus, India

In this project, we will see a simple Sun Tracking Solar Panel circuit which will track the Sun and position the solar panels accordingly. As the non renewable energy resources are decreasing, use of renewable resources for producing electricity is increasing. Solar panels are becoming more popular day by day. Solar panel absorbs the energy from the Sun, converts it into electrical energy and stores the energy in a battery.

Two light dependent resistors are arranged on the edges of the solar panel. Light dependent resistors produce low resistance when light falls on them. The servo motor connected to the panel rotates the panel in the direction of Sun. Panel is arranged in such a way that light on two LDRs is compared and panel is rotated towards LDR which have high intensity

Cost Efficient Solar Charge Controller for Solar Photovoltaic System
121
Ranjit Singh1, 2, Niranjan K3
1 Assistant Professor, Guru Nanak Institutions Technical Campus, India
2 Research Scholar, Dr. M.G.R Educational & Research Institute, Chennai, India
3 Student, Guru Nanak Institutions Technical Campus, India

Solar charge controllers play an important part in isolated solar systems. Their goal is to ensure the batteries are working in optimal conditions, mainly to prevent overcharging (by disconnecting solar panel when batteries are full) and too deep discharge (by disconnecting the load when necessary). The aim of this thesis is to design a solar regulator that could control more lead-acid batteries at the same time. The design is limited to lead acid batteries, as they are currently the most used type in the isolated photovoltaic applications due to their high capacity and very good price per capacity compared with other battery types.

Flexibilization of Conventional Power Plants – the Indian Paradigm
122
ANJAN KUMAR SINHA
GTG-RISE, India
As per India’s commitments of COP 21, the target of adding over 175 GW of renewable by 2022 has gained a momentum towards the trend of fundamental change of electricity markets, with renewable prices as a key driver of this change. Utilities like NTPC has already started to face difficulties in coping up with this trend with a hit in the bottom line. In India, a largely hard coal-based generation, with limited storage hydro and gas supplied, most of the cost-effective balancing resources has to be provided by coal generators. Flexibilization of coal-based plants with the low grades Indian coal will need investments in retrofits procedural changes in practices besides capacity building of the entire generating staff. This paper comprehensively outlines the cost-effective ways of achieving coal power plant flexibility with proper incentivization in the present regulated environment of India. It is based on a wealth of actual case studies, pilot studies and data (studies by VGB under IGEF, Intertek under USAID, GTG, CEA and NTPC), which provides a reference source for the technical capabilities of power plants and the costs of providing actual flexibility. It also discusses the technical options and of operational procedural modifications and retrofits to existing power plants for enhancing system flexibility. The Indian context Unit-wise categorization of the coal plants have been done with the metrics of age, variable costs, heat rate, coal quality, unit size and design. This categorization would help the generators and the policy makers in planning for future flexibilization resources. In fact, every IPP must identify the value that additional flexibility can add to its plants and plan the necessary intervention. Flexibility comes at a cost and benefits vary by plant, so it is important to ensure that the benefits outweigh the costs before focusing attention on possible technical and expensive upgrades. The planned capacity must be adequate overcoming the flexibilization deficit for all modes of flexibilization required in 2022 and beyond. The paper is aimed at policy makers and regulators who need to understand power plant flexibility in order to enhance system planning and upgrade policy, market and regulatory frameworks. It is important to understand that economic rules will drive the adaptation of technical measures by plant operators and give access to low cost resources needed for balancing. Even, access to the latent flexibility in the system will need unlocking through market rules. Proper incentivization rules will help to accelerate investment, innovation and the use of smart, efficient, resilient and environmentally sound technologies, which is crucial for ensuring electricity security in modern power systems. Incentivization can be best achieved in the market mechanism where the true value of flexibilization gets discovered, but India needs to move gradually from the present regulated environment to real time market.
IMPLEMENTATION OF AUTOMATIC GENERATION CONTROL AT HYDRO POWER PLANTS IN SOUTHERN INDIA
123
Chandrasekhar Reddy Atla1, Nagaraja Ramappa1, Satish Kumar singh2, Pradeep M3
1 Power Research & Development Consultants Pvt Ltd, India
2 Deloitte Touche Tohmatsu India LLP, India
3 Karnataka Power Corporation Ltd, India

Power system reliability under increased RE penetration is of significant concern to system operators. As of now in India, the regulations on tertiary reserve market exist, and are followed by Regional Load Dispatch Centres (RLDCs). Considering the future growth of RE to meet the Government of India (GoI) targets, regulation reserves have been identified as necessary to compensate variations due to the load and RE in the seconds timeframe. Under the pilot, the AGC facilities are planned to implement at two hydro power plants: Sharavathi hydro power plant (10x103.5 MW) and Varahi Hydro power plant (4x115 MW). The existing AGC module in Energy Management System (EMS) at State Load Dispatch Center (SLDC) is planned to configure to generate the AGC signals for participated hydro units. The paper will analyse the role of ancillary services with focus on secondary control using Automatic Generation Control (AGC).

Keywords: Automatic Generation Control, Ancillary services, Energy Management System, Hydro power plants

Flexing India’s Energy System Through Market Mechanisms: Recipe to Achieve a Lower Cost, Low Carbon Electricity Market
124
Tim Buckley, Vibhuti Garg, Kashish Shah
Institute for Energy Economics and Financial Analysis, United States

India has set exceptionally ambitious renewable energy (RE) targets including 175 gigawatts (GW) of renewables by 2022 and to achieve 40% of electric power installed capacity from non-fossil fuels by 2030. Such ambitious targets invariably encounter various new headwindsand challenges. Recent months have brought some of these to the fore, including questions over the grid capacity to incorporate a rapidly rising variable energy penetration so quickly.

India’s electricity supply has historically been largely coal dominated, with 191GW currently operational. In the last 2-3 years the share of solar and wind generation, although low, has been increasing rapidly. This focus on the deployment of more variable renewable energy generation - a result of India’s transformation of the national electricity system to diversify generation into more sustainable, lower cost, domestic sources – also brings additional load balancing pressures.

In a recent report by CEA on RE integration, presents that in a situation if India will achieve 175 GW of RE capacity by 2022, on the best RE generation day, the maximum generation will be ~108 GW. During such time period, coal-fired power plant will have to operate at a minimum load factor of as low as 26%. Indian coal-fired power plants are not designed to operate at such low load factors and will require massive support from gas, PHS, battery storage and grid connectivity to manage this evolution.

India’s electricity pricing mechanism should ideal provide some long term financial incentivisation of storage and firming capacity projects to ensure uninterrupted power supply, be that fast ramping coal power, gas peakers, distributed as well as utility scale batteries, hydro-electricity, pumped hydro storage, and demand response management. An ancillary service market with products like leakers-active and reactive power support, frequency regulation and ramp rates needs to be developed.

In this paper, we will explore the need for creating a market that provides signals for balancing capacity and flexible generation to balance power supply and demand, particularly in meeting peak demand. The analysis will cover a commentary on demand and supply side responses that can meet the peaking and flexing needs of Indian energy systems and the policy design that can enable setting up of such capacity. What kind of regulatory interventions will facilitate the transition to clean energy in an effective and least cost way.

Also, analyse few international case studies to highlight the various technologies and adoption of market structure to manage the increasing share of renewables in their electricity mix. India is well placed to become a world leader in deployment of various RE technologies and storage, given right market structures are in place. Based on other country’s experience and study of local conditions, this paper will attempt to provide a roadmap for faster deployment of RE as a reliable power.

A Case Study on Potential Impact of Electric Vehicle Charging for an Electricity Distribution Utility in India
125
Bhawna Tyagi, Chandana Sasidharan, Shyamasis Das
Alliance for an Energy Efficient Economy, India

In India, electric mobility is currently at its infancy. At the crossroads of this possible market disruption is the electricity sector. While additional electricity sales due to Electric Vehicle (EV) charging would help increase the revenue volume of an electricity distribution utility, charging demand may accentuate the peak load of the service area and have a bearing on the cost of power procurement for the distribution utility. Thus, it becomes essential to evaluate the additional electricity demand from EV adoption, its possible pattern and contribution to base and peak load. This will enable DISCOMs to operate its distribution network efficiently and the State Electricity Regulatory Commissions to introduce appropriate instruments to avoid any negative impact on the electricity supply. This study models the peak and off-peak contribution from EV charging and estimates the impact on the cost of power procurement of electricity utilities in a state. The study finds that EV charging significantly increases the energy consumption from 12 AM to 6 AM. The study also finds that the number of EVs which can potentially impact the average cost of supply varies across different DISCOMs.

BLOCKCHAIN ENABLED NATIONAL OPEN ACCESS REGISTRY (NOAR) TO FACILITATE ELECTRICITY OPEN ACCESS
126
Himanshu Mishra, Himanshu Mishra
Vice President - Projects & Regulatory Affairs, SunSource Energy Private Limited, India

Innovation is the new lingua franca for the businesses to survive amid volatile growth scenarios and changing norms. Changing circumstances call for dynamism and activeness in business thinking and is the genesis to new business models.

Blockchain is the technology that will prevent the present and future pain of common people like me and you and will help creating transparent, corruption free economy. Blockchain technology may be defined as below

Immutable Digital Ledger of cryptographically signed transactions, implemented in Distributed Network operating on Mathematical Algorithm without Central Authority.

Open Access is the pivotal for any electricity reform. The Electricity Act 2003 defines Open Access as

“Non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission”

For Indian Electricity Sector, the success of electricity reform triggered by the Electricity Act 2003, hinges upon the success of Open Access implementation in transmission and distribution.

Emergence of Blockchain technology combined problem statement in automated open access process in electricity motivates to examine the possible integration of the technology with electricity sector need. Blockchain allows us to have a distributed peer-to-peer network where participants can interact with each other without a centralised trusted repository, in a verifiable manner. We review how this mechanism works and also look into smart contracts- scripts, code which will operate on Blockchain to allow for automation of multi-step processes. We then move into understanding behind the National Open Access Registry (NOAR) and describe how a Blockchain 1) facilitates sharing of services and resources and 2) allow us to automate in cryptographically verifiable manner several time-consuming workflows. Our conclusion is that the Blockchain enabled NOAR is transparent, help in saving cost, efficient, immutable and verifiable, paving way for new business model and novel applications in electricity sector.

Key words: Electricity Market, Open Access, Blockchain, Regulations, Smart Contracts, Peer-to-Peer Network, Permissioned Blockchain etc.

Utilization of STATCOM Systems at Wind Power Plants to Meet Reactive Current Injection Requirements During Faults
127
Tim Freiberg, Narend Reddy, Jayateerth Managoli
AMSC, United States

Utilities all over the world have developed comprehensive interconnection rules and grid codes that require wind power plants to have similar operational characteristics to conventional generation. A major component of these requirements is the supply of reactive current during faults. A common starting point in the development of reactive current requirements is to prioritize reactive current without specifying a minimum amount in relation to a change in voltage. The new Indian grid code is an example of this nonspecific reactive current requirement. Other regions, such as the UK, Australia and Jordan, have implemented a more specific requirement where the amount of reactive current injection is defined in relation to changes in voltage. In this paper, the Jordanian grid code is used as an example to demonstrate the use of a STATCOM at a large-scale wind power plants to meet specific reactive current requirements.

Increasing Renewable Energy Hosting Capacity Using a Distribution STATCOM
128
Ryan Rainville, Jayateerth Managoli, Narend Reddy
AMSC, United States

Seasonal and daily mismatches in variable renewable energy (VRE) and loads have led to a wider range of operating voltages on feeders. This has introduced new voltage management challenges for distribution operators. Conventional voltage support devices, such as regulators and capacitors, lack the dynamic capability required to address these challenges. Reconductoring large sections of circuits improves voltage stability but requires substantial resources and may be cost prohibitive.

A new distribution class STATCOM is evaluated in this paper as a non-wires, cost-effective solution for feeder voltage management challenges. The paper addresses practical challenges to integrating high levels of VRE on distribution circuits, including siting concerns and the unfeasible time or cost required for typical system upgrades. The STATCOM’s speed-of-response and maintenance characteristics are compared with conventional regulators and shunt capacitor banks to explain its relative advantage for addressing VRE induced voltage fluctuations. Finally, case studies of observed voltage regulation problems due to VRE are presented to demonstrate the level of mitigation that is possible by adding a distribution STATCOM.

"III-V BASED SOLAR CELLS: METHODS, FUTURE AND APPLICATION AS ENERGY HARVESTING DEVICE”
129
Piyush Yadav
Delhi Technological University, India

The paper reviews the latest development in the fabrication and application of III-V solar cells as tandem devices and their application in drones, IOTs, BIPV, automotive as energy harvesting devices and for utility-scale projects.

With nearly 300 days of sunshine every year, India has among the best conditions in the world to capture and use solar energy. To complement this, India has set an ambitious target of massive 350GW of solar energy by 2030. But in order for solar energy products to become sustainable, profitable and competitive with other energy sources, a PV technology that could combine the efficiency advantages of single-crystal materials with cost-effective processing is needed. Silicon and GaAs Tandem Solar cells could be the key and revolutionary here as it could significantly reduce the LCOE to achieve such ambitious targets.

For products like BIPV, rooftop solar, consumer devices, High Altitude Pseudo Satellites(HAPS) where the available area is a constraint, low-cost high-efficiency cells could bring in a major revolution. Since thin-film GaAs solar cells are the most efficient, flexible and lightweight, if all these amazing factors are combined with a cost-effective manufacturing process, then it is possible to combine PVs having the best power to weight and area ratios with these products to significantly extend their battery life and in future potentially power them forever. For utility-scale projects, use of III-V/Si Tandem cells can significantly reduce the LCOE, and thus proving to be extremely crucial for meeting the future demands.

In recent years, there has been a significant rise in the efficiency of III-V cells. Alta Devices thin-film GaAs cells recently achieved 29.1%. This can open new doors for extending flight times of HAPS and revolutionizing the space & communication industry. Fraunhofer ISE recently set the world record for III-V/Si Tandem solar cells by achieving 22.3% efficiency by using direct growth over a Si substrate, considerably reducing the threading dislocation density and achieving an efficiency of 33.7% by using wafer bonding method. With further reduction in the dislocation density which is due to different Lattice constant of Silicon and III-V material, efficiencies in excess of 40% can be achieved.

These improved and high performances are mainly due to better Photon Management techniques by using very effective light trapping methods like diffraction grating and photonic crystals at the back side and further reducing the defect density, which has improved the Voc significantly. This improvement has led to a major rise in efficiency levels.

Thus, this paper focuses on the various aspects of impact that III-V cells will make in the future market, their recent low-cost manufacturing methods and extending their efficiency further by using innovative methods that can make them a cheaper, highly efficient alternative to apply them at scale.

Provision of Control Reserves for Facilitating Large-Scale RE Integration in Southern Region Grid States
130
Alok kumar mishra, Musab Arappil, Christian Hewicker
DNV GL, India

This paper analyses the potential impact of integrating large volumes of variable renewables (RE) on frequency control reserves and presents options for mitigating the associated challenges and costs by enhanced cooperation between the state and regional level. The Southern region is key for the Government of India’s target of installing 175 GW of RE by 2022. With an expected 70 GW of wind and solar power, or about 40% of the national target, up to 38% of local consumption may be supplied by variable RE in the Southern region.

In the first part of the paper, we apply a proven probabilistic method, also used by several European system operators, to quantify the impact of these developments on the future need for secondary and tertiary reserves in the Southern region. By looking at different scenarios and assumptions, we highlight key drivers and risks.

In the second part of the paper, we investigate possible approaches for cost-effectively managing control reserves and real-time system balancing by means of enhanced cooperation between the regional and state load despatch centres. We assess several options for and potentials benefits of improved vertical and horizontal cooperation, including enhanced methods of reserve sharing. We present examples of international best practice and discuss their applicability to the Indian context. We conclude by identifying the most promising options, which appear worth being further discussing by relevant stakeholders in the Southern region.

FORMULATION OF EFFICIENCY OF INVERTERS FOR SOLAR PHOTOVOLTAIC POWER PLANTS- INDIAN CASE STUDY
132
Akshaya Harish1, Aravindakshan Ramanan2, Prasun Kumar Das3, Godugunur Giridhar3, Balaraman K3
1 Amrita Vishwa Vidyapeetham, Amrita School Of Engineering, Coimbatore., India
2 GIZ GmbH, India
3 National Institute of Wind Energy, India

Indian Government has set ambitious targets for solar PV of 100 GW under the National Solar Mission by the year 2022. The installed capacity has already reached 26GW as on February 2019 .The inverter is one of the main components of solar PV conversion system. Therefore, significant amount of efforts are being made by PV inverter manufactures to achieve minor improvements in efficiency which will bring about significant increase in energy yield. Indian project developers rely on the efficiency figures provided by inverter manufactures to select suitable inverters. Due to fluctuating irradiation profile, the inverters used in Solar PV applications are subjected to varying levels of DC input power. Two weighted average methods namely EURO and California Energy Commission (CEC) efficiency formulae have been used by inverter manufacturers worldwide to evaluate the performance of inverters. These methods are representative of inverter efficiencies at Europe and California, thus cannot be suitable benchmarks to find out the conversion efficiency of the inverters in other locations. This paper discusses about introducing new weighting factors for calculation of inverter efficiency as per irradiation profile in India. As a step 1, the data from Solar Radiation Resource Assessment (SRRA) stations, implemented by National Institute of Wind Energy, Chennai are categorised into five climatic zones and weighting factors in the EURO and CEC efficiency formulae were derived for each one of them. In step 2 validation of three inverters were done by calculating the weighted average efficiency of these inverters operating in all the climatic zones by considering the new weighting factors. Further in step 3, it was cross-compared with the standard values of EURO and CEC efficiency. The efficiency values derived from the new weighting factors is seen to deviate as much as 2-3% from the standard efficiency values. Based on the analysis done for various inverters, it was found that there is a difference of 1.5 % to 2 % for the weighted average efficiency derived from the new weighting factors in the different climatic zones. The inverter efficiency values calculated are more reliable and hence it could be useful information for different stakeholders (for e.g., solar PV project developers). Informed decisions could be taken on the estimated energy yield from the solar PV power plants. Therefore, from this study, significant insights could be drawn related to performance of inverters in different locations in India considering site-specific irradiation profile.

Voltage Induced Frequency Instability in Power Systems with HVDC Connected Offshore Wind Power Plants
133
Jayachandra Naidu Sakamuri1, Zakir Hussain Rather2, Ömer Göksu1, Nicolaos Antonio Cutululis1
1 DTU Wind Energy, Technical University of Denmark, Denmark
2 Indian Institute of Technology Bombay, India

During recent years, conventional synchronous machine dominated power systems are experiencing significant proliferation of power electronic converters, primarily through converter interfaced renewable generation (mainly wind and solar PV). Due to variability and limited support during transients, the integration of wind power introduce various technical issues, such as, voltage, frequency and rotor angle stability challenges in the power system [1]. Offshore wind power pants (OWPPs) connected through HVDC system, on the other hand poses additional controllability related challenges.

Renewable energy generators have limited short circuit capacity due to current limitation of the grid-interfacing converter, thus leading to a weak power system. Besides low short circuit capacity, renewable energy driven displacement of conventional plants also leads to a low inertia lighter system. Such voltage and frequency weak systems are more vulnerable to voltage and frequency instability. To address these challenges in grid operation, TSOs are imposing stringent grid codes on the large converter interfaced generation to provide reactive power support during the network events. Reactive power from wind power plant is prioritized to adequately recover voltage in order to prevent voltage protection triggered tripping and potential voltage instability. However, prioritizing reactive power output over active power output during voltage event may result in temporary shortfall of generation, particularly for a fault in a region hosting higher share of wind power, which may potentially result in frequency instability in the grid. Therefore, proper control coordination is required for adequate voltage and frequency control in a converter dominated power system. A potential risk of frequency instability due to a delayed active power recovery from wind farms following a network fault induced voltage dip in large-scale wind integrated power systems is investigated in this paper.

This study focuses on the dynamic control of HVDC connected OWPP and its impact on the frequency stability of a converter dominated onshore AC power system. The dynamic model of the 2-terminal HVDC test system is developed in EMT simulation tool, PSCAD/EMTDC. The the onshore HVDC converter controls DC link voltage, while the offshore HVDC converter controls the frequency and AC voltage in the offshore AC grid and transmits the active power generated by OWPP. The OWPP has aggregated representation of type-4 WT model having the grid side converter (GSC) and a DC current source whose reference is set by the WT control model. The impact of active power control from OWPPs on the onshore AC grid frequency is studied for three different scenarios, namely (1) Fault at OWPP (2) Fault in the DC link (3) Fault in the onshore AC grid. The dynamic response of the OWPP and HVDC converters and their impact on the onshore AC grid frequency is investigated for the above three cases.

Impact of Short-Circuit Ratio on Grid Integration of Wind Farms - a New Zealand Perspective
134
Raghavender Deshagoni1, Ramesh Rayudu1, Vikash Mantha2, Ciaran Moore3
1 Victoria University of Wellington, New Zealand
2 UK Power Networks, United Kingdom
3 University of Canterbury, New Zealand

The high wind energy potential sites are increasingly remote from the load centers which create problems in integrating wind power plants into power grids. One of the major issues is the short-circuit ratio (SSR) at the point of common coupling. A lower short-circuit ratio will lead to a weaker grid which in turn creates power system stability problems. The definition of a weak grid depends on short-circuit ratio values. In New Zealand, it is often noted that the definition of a weak grid, based on SSR, is different from that of standard values (of SSR) due to several reasons.

New Zealand’s grid is long and slender with arguably major generation at one end and load centers at the other side. Close to 80% of daily consumption of electricity is generated from renewables with 5-8% contributed by Wind generation. Wind farm locations in New Zealand share the same difficulties as shared by many nations in terms of remote locations, far away from load centers and wind variability. However, New Zealand wind farm capacity factor is close to 45% and maximum capacity of around 400 hours a year. Over 20 new wind farms have been consented for future with capacity close to 3GW.

This work shares our experience in connecting future wind farms to New Zealand grid and their effect on the weak grid concept. We will discuss the reasons for our definition of short-circuit ratio in New Zealand scenario and, in support, share some results of our simulations.

Preparing Baseload Units for Flexible Operation
135
Nikhil Kumar
Intertek, United States

Significant number of conventional coal units have historically operated in baseload mode, but operators are transitioning some of these units towards flexible operation. This paper will provide a roadmap to evaluate and plan for increased flexible operation, including case studies. The units discussed in this paper were able to improve turn down of the units to 30%, increase ramp rates (during load following), reduce auxiliary power, and minimize shutdown time between starts. The study team also evaluated reliability and economic impacts of their action items. Key discussion points of this paper will include; revised operating procedures and test results, flame monitoring and stability, temperature control, valve wear & tear, thermal transient review and economic analysis.

Business Models for Utility-Scale Energy Storage in India
136
Nishit Mehta, Sylvester Stanis Lepcha
Sterlite Power Transmission Ltd., India

India has embarked on an ambitious journey for 175 GW of renewable capacity by 2022. The high variability and unpredictability from renewable calls for an efficient and economical operation to maintain grid stability. Energy storage can play an important role in addressing these challenges by meeting peak requirements, providing ramping, shifting and smoothening renewable output, reducing deviation penalties, relieving congestion and providing ancillary services. Storage is still at a nascent stage of evolution, and to ensure well directed investment in this area, it is important to adopt business model that promotes maximum system benefit.

Broadly there are three types of business models based on ownership, application, revenue stream and contract type: generation-coupled, transmission-coupled, and merchant-coupled storage asset. For a generation-coupled asset, ownership and dispatch is controlled by generators and the revenue earned is variable subject to volume-risk (units generated/supplied). A transmission-coupled asset is operated by the system operator providing generation, transmission, distribution, and merchant services based on fixed-annuity agreements. A merchant-coupled asset is owned, operated and dispatched by independent storage providers to participate in energy arbitrage, capacity and ancillary services where such markets exist. Such markets have uncertainty in revenue stream and offtake risk, thus making asset bankability low. Considering experiences from around the world and learnings captured in other papers, this paper proposes a hybrid business model that maximizes system benefit while minimizing project financing costs. In the new model:

1.Storage is deployed as a transmission asset where ownership lies with an independent storage provider, and projects are awarded on an availability-based, fixed-annuity tolling-model, through competitive bidding processes thus minimizing both cost and risk.

2.Asset dispatch is controlled by system operator assuring greatest optimization across multiple value streams. This improves the value created to be 2x-3x over the most lucrative individual use case.

3. Revenue security is ensured by a tolling agreement as this enables the independent storage provider to borrow funds for the longest repayment period at lowest cost. This reduces the required debt service coverage ratio (DSCR) thus reducing the weighted average cost of capital and hence the cost to end-user.

4. As markets for frequency regulation, capacity & energy arbitrage matures and participants develop confidence in operating in these markets, the business model can evolve to include merchant revenues which in turn will reduce the amount of fixed, tolling-annuity required for availability during a pre-specified period.

Finally, the models for utility scale storage are still evolving across the world with each having its pros & cons, and same has been illustrated by taking a sample business case for a renewable rich state in India.

Behavioural Analysis of Hybrid Microgrid
137
Sangeeta Modi1, Dr P Usha2
1 PES University, Bangalore, India
2 Dayanand Sagar College of Engineering, Bangalore, India

India’s vision about smart grid development is attracting attention all over the world.Microgrid is one of the major key players in smart grid in the power sector. The issue of expansion of power system network has been triggered by continuous increase in the energy demand throughout the world. The future load pattern on power sector will be a combination of AC and DC loads, as there is rapid increase in application of DC loads such as electrical vehicles. These issues of increasing and varying load demand can be resolved by Microgrids. Microgrids are composed of distributed generators, distributed loads and storage units. Microgrids are of various types AC, DC and Hybrid. Microgrid can be operated in two modes grid connected and islanded mode. In grid connected mode microgrid exchanges power with utility grid via an interlinked converter, whereas in islanded mode microgrid supplies the total load connected to the system without exchanging power with the utility grid. Analysis of microgrid is very important to evaluate its performance. As of now very less work has been reported on hybrid microgrid in literature. In this paper analysis of hybrid microgrid under MATLAB simulation environment will be carried out and presented. The objective of this work is to minimise the burden on utility grid and to obtain clean energy from the renewable sources such as photovoltaic and wind energy sources. Various microgrid structures and controls would also be discussed as a part of this paper.

Testing Procedure and Compliance Assessment of Generating Units and Plants per Indian Grid Code
138
Ajmal Kunjumon, Tobias Gehlhaar, Torge Wehrend
DNV GL, Electrical Engineer, India

A grid code is a technical specification which defines the requirements to be met by stations, or plants connected to a public electric network. It is intended to ensure safe, secure, economic and proper functioning of the electric power system. The Indian Electricity Grid Code (IEGC) lays down the rules, guidelines and standards to be followed by the various agencies and participants in their different tasks around the electric system. Those tasks can be to plan, to develop, to maintain and to operate the power system or the power plant, in the most efficient, reliable, economic and secure manner, while facilitating healthy competition in the generation and supply of electricity. This paper summarizes the testing and certification procedure for the Indian grid code requirements .

Study of Different Use Cases of the Grid Connected Battery Energy Storage System in India
140
Mahesh M2, D.V. Bhaskar3, Ram Krishan1, R.K Jisha2, Satish Kumar Singh1
1 Power Grid Corporation of India Ltd, India
2 Dept. of EE, IIT(ISM) Dhanbad, India
3 GTG-RISE (Renewable Integration and Sustainable Energy Initiative Under Greening the Grid), India

Increasing penetration of uncertain and intermittent renewable energy sources (solar, wind) can cause various problems in grid such as dynamic frequency, voltage fluctuations, and demand-supply imbalance. In countries such as India, where has an ambitious target of adding 175GW RE generation to the grid by 2022, may bring more challenges to the grid operators for sustainable and reliable grid operations. However, a fast responding storage device such as Battery Energy Storage System (BESS) could be used to mitigate these problems in real time operation of power system by providing various grid applications including Frequency Regulation, Energy time shift and RE firming etc. But, the regulations for providing ancillary services have not yet been matured across the globe especially in large power grid network countries like India. This paper discuss about various ancillary services provided by the BESS with different battery technologies. Real time implementation of Li-ion, Advanced Lead Acid and Flow battery systems of 1.25MW capacity by POWERGRID has been considered for this study. The study would also provide insights on regulatory and commercial framework to be adopted by Regulators in allowing large RE integration in Indian grid scenarios.

Reactive Power Control Strategies for Solar Inverters to Increase the Penetration Level of RE in Power Grid
141
Ram Krishan, Satish Kumar Singh, Shubhranshu Patnaik, Sapna Verma
GTG-RISE (Renewable Integration and Sustainable Energy Initiative Under Greening the Grid), India

Integration of Distributed generation (DG) in active grid depends on the grid parameters viz. strength of the network, voltage etc. Network voltage is one of the limitations for penetration of Renewable Energy (RE) based DG into the active power grid. Solar Photovoltaic power generation is a key source of Renewable Energy Sources (RES), which is integrated through the highly efficient and multi-functional inverters. Capability of Solar Inverters (SI) can be utilized to provide the voltage support during critical system need on a 24/7 basis. During night, entire inverter capacity can be used for reactive power support. During the critical voltage condition in the daytime, SI capacity remaining after real power generation can be utilized to improve the voltage stability of the system without any RE curtailment. This paper presents a potential reactive power control schemes for SI, considering enhanced utilization of the inverter reactive power capability to enhance the voltage regulation at the PCC under the physical limitation of the inverter. The Solar Inverter Control (SIC) schemes are incorporated in the optimal power flow (OPF), and formulated as an optimization problem, where, the inverter control schemes are applied to maximize the total distributed generation (DG) penetration and enhance the distribution/transmission network utilization in a typical power grid. Various case studies are presented and compared to evaluate the performance. The results show that the proposed reactive power control scheme can significantly increase the wind penetration levels up to 81% depending of the network constraints and integrated RES.

A High Voltage Direct Current (HVDC) Based System for Grid Augmented Wind Power Transmission
142
Kathiravan G1, Lavanya M.C2, Boopathi K3, Dr.Balaraman K4
1 National Institute of Wind Energy, India
2 National Institute of Wind Energy, India
3 National Institute of Wind Energy, India
4 National Institute of Wind Energy, India

The major prevailing hindrance in Renewable Energy [RE] integration into the grid is Power Quality disturbances. Principally RE sources can be classified as Dispatchable and Non Dispatchable categories. The Sources such as Biomass CSP with storage, Geothermal and Small Hydro in which the generation is based on the demand is classified under Dispatchable category. The intermittent RE Sources such as solar and wind in which generation is dependent on Metrological conditions are classified under Non-Dispatchable category. These intermittent RE sources hold the major contribution towards the power generation and also construct major disturbances in grid at generation level. These types of constraints can be overcome by forecasting studies with respect to generation and peak demand. Similarly, when we consider the same drawbacks to the transmission grid level, it causes critical steady state issues that lead to voltage dip and frequency changes. The intermittent inheritance of these sources cannot able to meet out the voltage and frequency requirements of the systems connected to it which in turn give rise to the Power Quality issues affecting the transmission grid in a big scale. These transmission oriented issues can be resolved by addition of new transmission lines and substations, application of Series Capacitors, FACTS devices, phase shifting transformers which will improve power transfer capability, Employment of HVDC (LCC / VSC based), Upgrading existing transmission system to high voltages, Re-conductoring, Usage of narrow base towers and pole type towers, and Usage of GIS / Hybrid Switch Gears. In this paper, a case study has been considered for a group of wind turbines connected together in a farm which is transmitted through ±800 kV HVDC link for strengthening transmission ability and to verify the response of the grid with respect to voltage and frequency values and the results that are compared with same configuration under EHVAC Transmission for performance evaluation.

Modelling of Standalone Photovoltaic-Wind-Battery Hybrid Systems Using Physics-Based Battery Models
143
Mayur Prakash Bonkile, Venkatasailanathan Ramadesigan
Department of energy science and engineering, Indian Institute of Technology Bombay, India, India

The hybrid systems consist of one or more renewable energy sources (RES) along with battery energy storage (BES) system satisfying the power demand of the consumers. A generic framework is presented to evaluate the performance of a standalone PV-wind-BES hybrid power system using physics-based battery models. It comprises of PV panels, Maximum Power Point Tracking controller, wind turbine, power electronics, and lithium-ion batteries (LiBs). The dynamic behaviour of LiBs is simulated using physics-based battery models. These models explicitly represent the transport and kinetic processes that take place in the LiBs which help in understanding their operations and achieving better predictions of their performance. The framework for a standalone PV-wind-BES hybrid system is implemented in a MATLAB Simulink environment. A case study is provided using data from a remote residential area in India which would consider variability in load and generation to demonstrate the effectiveness of the proposed framework. The physics-based battery models can be beneficial to analyse the thermal effect and capacity fade to make the best use of the BES system in hybrid power systems.

Evaluating the Application of BESS for Peak Load Management of a Distribution Transformer
145
Neshwin Nigel Rodrigues, Ram Krishan, Ashish Sharma, Alekhya Datta, Shubham Thakare, Shashank Vyas
The Energy and Resources Institute, India

The Indian electricity sector is expected to undergo significant transition in the coming years, as the share of variable renewables (VRE) increases. This coupled with an annual increase in peak demand could put significant stress on the distribution network operation.

Battery energy storage systems could play a significant role in the distribution network for applications such as voltage regulation, peak shaving and help distribution utilities saving on DSM penalties. With high summer peaks, distribution networks with high penetration of solar rooftop PV systems (SRPV) tend to have a low load factor. So in such distribution feeders, the benefits of load reduction through SRPV, and loading on distribution system components, especially transformers, would not reduce the augmentation/replacement costs on these components. There are certain factors which affect the health/life of distribution transformers (DTs) i.e. (1) Overloading (2) Non-linear load operation (3) Poor maintenance (4) Lightening surge etc. The DT failure rate in India is around 12 to 15 %, overloading is one of the major causes for failure of transformer in urban areas where the population growth is high. The overloading of DT can be prevented by deployment of BESS at distribution downstream while preventing distribution transformer augmentation.

This study tries to access the need for BESS at the distribution level to defer investments on distribution transformer augmentation, reduce DT Failure while increasing the life of the distribution transformer. This application along with energy arbitrate could make viable, BESS at the distribution level. Development and lab testing of control logic for the battery monitoring system along with detailed cost benefit analysis under various scenarios will be undertaken under this study.

Incentivizing Flexibility in System Operations and Recovering the Cost of Flexibility.
146
Nikhil Kumar, Taylor Kelly, Dwight Agan
Intertek, United States

With increasing penetrations of renewable wind and solar generation, the electric grid, generators, wholesale markets, and system operation have all been impacted. The variability and uncertainty of renewable generation has added complexity for system operators. While, this is not a new phenomenon, the intensity of the variability and uncertainty is certainly a new challenge. Similarly, impact on energy prices, ancillary markets, and the ability of conventional generators to recover generation and flexibility costs have been significant as the grid evolves to increased renewable generation.

Over time, power pools, and markets have evolved, to encourage conventional resources to offer flexibility to the system. Even bilateral contracts, with pre-existing power purchase agreements have been modified in situations where the generator has been compensated for increased flexibility. This paper will discuss several case studies highlighting market and power pool evolution to introduce ancillary service markets, make-whole payments, day-ahead profit guarantees and other mechanisms to ensure conventional generators that have historically operated in baseload mode, can recover the cost of flexibility.

Framework to Assess the Economic Impact of Grid Integration of Rooftop Solar on Indian Discoms
147
Akanksha Tyagi, Selna Saji, Neeraj Kuldeep
Council on Energy, Environment and Water, New Delhi, India

The benefits of rooftop solar for consumers are well known and include savings on electricity bills by reducing grid consumption, revenue by selling excess electricity to the distribution utilities (discoms), among others. However, there is a growing animosity among discoms about grid integration of the rooftop solar. The discrepancy in billing solar electricity, revenue loss due to migration of best-paying consumers from grid to solar, and lack of incentives for managing the end-to-end process for grid connection of the systems are allegedly disrupting their business. The conflict primarily arises from the lack of empirical data on the potential benefits of grid-connected rooftop solar for the discoms. Grid-integrated rooftop solar can reduce transmission and distribution losses, network congestion, and allow efficient peak load management. Therefore, it is imperative to quantify the impact of grid-connected rooftop solar on the discoms so that they can better manage expenses and plan future investments.

In our study, we have identified several benefits and costs of rooftop solar relevant to the Indian discoms. The first benefit is from capacity procurement. Accurate knowledge of solar generation and consumer demand will help to manage future capacity procurement and incurring expenses. Second, due to concurrent generation and consumption points in a rooftop solar, grid integration can reduce transmission and distribution losses. Lastly, by procuring power from rooftop solar, discoms can avoid payments towards renewable energy certificates.

Grid integration, however, comes at its own cost that is borne by the discoms in some way or the other. First is the rooftop solar program execution cost that includes the construction and upgradation of network infrastructure and deputation of skilled manpower. Second is the additional ancillary support required to tackle the intermittent nature of rooftop solar. At the top of this list is the anticipated revenue loss due to faster adoption of solar by consumers in high tariff category.

It is important to know that rooftop solar is a geographically specific technology and thus these benefits and costs do not contribute equally to the net effect on discoms' operations. Further, some of these components are time-dependent and might become obsolete after a certain period. Based on these facts, we have developed a flexible tool for the discoms to evaluate the impact of grid-connected rooftop solar systems in their license area. The study was conducted in collaboration with a distribution utility that has provided necessary data for the empirical analysis at feeder level. The paper elaborates on the framework and contains the results of the case study.

Techno Economic Analysis of a Hybrid PV/Diesel System for a Village in Haryana(India)
148
Archna Aggarwal
YMCA University of Science & Technology,Faridabad,Haryana, India

Abstract: Ever increasing demand for energy, depletion of fossil fuel reserves and the various environmental concerns have forced researchers throughout the world to look for alternative energy solutions. Renewable energy is the answer in such scenario as it is abundant, inexhaustible and environment friendly. As about 70% of Indian population lives in villages, the economic health of villages directly affects the economic growth of the country. The integration of renewable energy technologies based on solar,wind etc. alongwith the conventional energy resources systems could be a useful tool to provide rural India with a better access to modern day energy requirements, to facilitate their economic & social growth. In this paper, a case study of a village (Jasna, population 3746) in Haryana has been undertaken.A hybrid PV/diesel system has been modelled & its economic viabilty has been studied using HOMER software. The System has been modelled using MATLAB and the optimized configuration obtained has been compared with the one obtained from HOMER.

Key Words: Techno-Economic, Hybrid, Renewable Energy Technologies, Rural India, existing energy depletion of fossil fuel,

P2P Trading Using DERs: A Holistic View of Global Practices and Pioneering Efforts in India
149
Sweta Malik1, Shashank Vyas1, Alekhya Datta1, Amanda Ahl2
1 The Energy and Resources Institute, India
2 Tokyo Institute of Technology, Japan

Quite notably, over the years, the Distributed Generation (DG) concept has evolved and the role of Renewable Energy (RE) has become increasingly important in shaping the developments. In the form of Distributed Energy Resources (DERs), RE sources also help in reducing burden on the utility by providing an alternative source which is most relevant for a distribution network. With increasing penetration of DERs at the distribution-level, electricity distribution is rapidly transforming into a two-way business where consumers (as prosumers) are selling power back to the utility. All such interactions can be streamlined in the form of Peer to Peer (P2P) trading of energy and a decentralized network between “peers” participating in a local energy market can be created thus transforming into a virtual power plant. If used properly, DERs at the distribution-end can not only reduce losses but can also help the utilities in managing demand more efficiently by engaging people who own these generating assets. Blockchain serves the P2P framework well, creating an efficient platform for energy trading between peers without any requirement of an intermediary. This paper presents a review of the existing major projects on P2P trading using DERs. The aim of this paper is to report different price bidding strategies and auction mechanisms employed to create a win-win approach for both prosumers and consumers. Societal aspects and institutional development required for using Blockchain for P2P trading have also been discussed. In the end, a prototype model for P2P trading of rooftop solar energy, developed by the authors, is introduced.

Round the Clock Power from Renewable Sources
150
NA NA
NA, India

Background

A key concern in the ever-evolving energy scenario is energy security, especially in developing nations like India. In the past, India has responded well to sector requirements with transformational changes through supportive policy interventions and reforms.

This has enabled rapid capacity addition, making India the 3rd largest power generator in the world and bridging the energy deficit. However India continues to be primarily dependent on coal based power plants.

Environmental concerns and global warming have led to focus on sustainable energy solution. With an aim to reduce emissions, India has set a target of 175 GW RE by 2022.

The Issues

The key roadblocks for large scale RE deployment include:

Variability: Power generation only when the wind is blowing or the sun is shining.

Uncertainty: The output cannot be predicted with perfect accuracy.

Going forward, with higher household demand coming on-stream, the demand curve is expected to get peakier. With incremental capacity being majorly RE, the demand-supply curve mismatch is expected to widen.

Solutions to Deepen RE in India

To achieve targets, India needs to initiate testing of hybrid solutions for RTC power instead of developing standalone RE sources. The solution is to have multiple options - gas, hydro & storage which improve flexibility. While a lot has been documented on gas & hydro, this abstract focuses on storage.

At present, multiple storage technologies exist, the most promising being Li-ion batteries. Pilot testing should be carried out in small regions via micro/ mini grids, with scaling as cost economics improve.

Challenges in Battery storage

The Indian consumers are highly cost sensitive. Higher solar+battery costs by upto 50% restrict adoption.

Raw material availability continues to be critical constraint. Li reserves are present in only 4 countries– Chile, China, Australia & Argentina. Cobalt, making is less commercially viable.

In short, storage scale and costs are the key determinants for sustainability of renewable energy.

Recommendations

First, create an enabling policy and regulatory framework, since currently there are no policies/ regulations around storage. Regulatory mechanism & role in grid operations needs to be laid out.

Secondly a roadmap for demand with clear cut visibility i.e. a road map including Integrated Energy Policy is required, which can enable proper planning.

Thirdly, there is a need to empirically establish that cost of RE+storage i.e. integrated tariff (including standby charges) is expected to be lower than coal power tariff with coal cost escalation in the medium term. In the interim, battery market could be developed via phased incentives/ subsidies.

Finally there is a need to develop robust ancillary services market (other than existing frequency control).

These changes if implemented could ensure a robust power system for firm clean energy, reducing dependence on conventional sources.

Analyzing Trade-Offs in Short Term Power Sector Operations Under Minimum Offtake Guarantee Constraints in India
151
Pankaj Kumar1, Trupti Mishra2, Rangan Banerjee3
1 Interdisciplinary Program in Climate Studies, Indian Institute of Technology Bombay, Mumbai, India
2 Shailesh J Mehta School of Management, Indian Institute of Technology, Mumbai, India
3 Department of Energy Science and Engineering, Indian Institute of Technology, Mumbai, India

The Indian power sector is dominated by coal which accounts for 74 percent of the electricity generated. Due to the must run nature of renewables the plant load factor of thermal plants is currently 56%. In this study, we analyze the trade-offs and synergies in cost and emission minimizing power sector operating strategies for the Indian power sector in 2022.

An optimization model is created in TIMES framework with 2018 power sector inventory which includes 620 coal, 239 gas, 22 nuclear and 686 hydro units and capacity addition targets for 2022 (inclusive of 100GW solar and 60GW wind). The power plant units are represented with techno-economic and operational characteristics like availability factors, heat rates, emission factors, ramp rates, minimum generation levels and part load efficiency. The solar and wind capacity is modeled regionwise while thermal power plants have unit-wise representation.

The model also represents the minimum guaranteed offtake for each power plant unit towards Discoms. The model is bottom up, linear programming with unit commitment and dispatch features and minimizes the total cost of electricity production for 2022. We analyze two demand scenarios with 6 and 7 % GDP growth rates till 2022. The cost and emission minimizing operating strategies are compared in terms of emissions, power plant operations, regional distribution, cost of carbon abatement and stranded assets.

We observe that emissions can be reduced by 16-23 percent in the emission minimizing strategy with 36-39 % increase in the cost of electricity. The cost of electricity from coal thermal portfolio also increases by 71-79% in the emission minimizing scenarios. This higher cost of electricity is attributed to higher utilization of new coal thermal power plants and capacity charges from older power plants tied under minimum offtake guarantee. The cost of operations from coal and gas thermal plants increases by 63-56% under minimizing strategy. Nearly 82-84% of the coal thermal capacity tied under power purchase agreements remain unutilized in emission minimizing operations.

The carbon price for emission minimizing scenarios is in the range of 222-229 US$/tonne CO which is significantly higher than all developed countries since it also internalizes cost of stranded assets. This puts a cost burden of additional 511 bn INR on the Indian power sector. This framework can be useful for all countries in analyzing power plant operating strategies and the costs of low carbon transitions

Integration of Technologies - Power Flow Controllers & Dynamic Line Rating for RE Penetration
156
Mohan Babu Paladugu, Jeetendra Bisht
Sterlite Power Transmission Ltd., India

Objective:

• Increase the flexibility and capacity of the existing power grid.

• Increase network flexibility for grid users at optimised OPEX, which allows for a larger share of RES and increased security of supply.

• Manage congestion within the grid without affecting system reliability.

• Defer CAPEX to build new lines by harnessing the hidden capacities of the existing system.

The integration of intrinsically variable R.E generations shall bring unpredictability in the form of sizeable fluctuations in power flows in transmission networks. It shall also further increase the need for grid reinforcement to guarantee security of supply. The power flows vary with time, seasonal variations as well as daily variations. The network additions to cater these power flows cannot be an economical solution always. Advanced transmission technologies must be tested, and the management of existing infrastructure must be improved. The new technologies like Dynamic line ratings and modular power flow control devices are being tested, implemented and are being successful in their operations in many parts of the world. This paper focus on the idea of integration of both Dynamic line rating and Power Flow controllers to enhance the flexibility of existing transmission infrastructure.

Development of Solar Parks in India and the Way Forward
157
Radhey Shyam Meena1, Dilip Nigam1, Anindya S Parira1, Sunil Kr Gupta1, Neeraj Kumar1, Anil Kumar1, Dr. Mohammad Israr3, Dr Arun Kumar Tripathi1, 2
1 National Solar Mission Division, Ministry of New & Renewable Energy (MNRE), New Delhi, India
2 National Institute of Solar Energy, Haryana, India
3 Department of Mechanical Engineering, Sur University College Sur Oman, Oman

In the Nationally Determined Contributions (NDC) as per the Paris Accord on Climate Change, India made a pledge that by 2030, 40% of our installed power generation capacity shall be based on renewables and the emissions intensity of its GDP reduced by 33 to 35 percent by 2030 from the 2005 level. Keeping this in view and also keeping in view of commitment to a healthy planet, the Renewable Energy (RE) capacity of 175 GW targeted to be installed by 2022 in India. The substantial higher capacity target will ensure greater energy security, improved energy access, and enhanced employment opportunities. With the accomplishment of these ambitious targets, India will become one of the largest Green Energy producers in the world, surpassing several developed countries.

The capacity of around 82 GW has already been installed form different sources of renewable energy. The cost of solar and wind power generation has also declined significantly and for new projects, depending upon the location, the cost ranges between Rs. 2.44 per unit and Rs.2.85 per unit of power produced. On a life-cycle basis, the delivered cost of solar and wind power (even after including the normative transmission charges of Rs 1 per unit of power), has become cheaper than the marginal cost of power from thermal power plants. The demand forecast suggests that by the year 2030 a solar and wind power capacity of 500 GW will be required. Now, renewable energy is not only a matter of commitment and faith but also has emerged as a cost-competitive option for meeting the electricity requirement.

With this background, the present paper reviews the current status and role of Solar Parks in the growth of the National Solar Mission & renewable energy sector, Initiatives and especially the development of solar parks in India which are the key factor to set up a new era of the solar industry in India. Further, the challenge faced by Solar Project Developers (SPDs) & Solar Power Park Developers (SPPDs) has been discussed in this paper.

This includes aspects of the move from Solar Parks to RE Parks to reduce the effect of critical elements of land and transmission system for sustainable growth of RE in India. Further, a case study of operational 1000 MW Kurnool Solar Park is also included in the paper to analyze the variation in generation of energy, system voltage, and the frequency as a reference.

Keywords-National Solar Mission (NSM); Solar Park; Transmission System; Renewable Energy;